BLACKWATER MINE

Blackwater Mine -

North Extension Project

Environmental Authority Amendment Supporting

Information Document

Status: Submission

Version: 1.0

Document Control

Reference

Date

Prepared

Checked

Authorised

BWM EA Amendment Supporting

14/12/2023

SLR and BMA

Document

Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information

Table of Contents

Abbreviations

xii

1

Introduction

1

1.1

The Application for Amendment

1

1.2

The Proponent

1

1.3

Existing BWM Operations

4

1.4

Project Overview

5

1.5

Project Objectives

5

1.6

Structure of this Document

5

2

Regulatory Considerations

7

2.1

Primary State Legislation

7

2.1.1 Mining and Environmental Legislation

7

2.1.2

Mineral Resources Act 1989

7

2.1.3

Environmental Protection Act 1994

8

2.2

Other State Legislation

16

2.2.1

Water Act 2000

16

2.2.2

Environmental Offsets Act 2014

17

2.2.3

Planning Act 2016

18

2.2.4

Regional Planning Interests Act 2014

18

2.2.5

Fisheries Act 1994

18

2.2.6

Nature Conservation Act 1992

19

2.2.7

Vegetation Management Act 1999

19

2.2.8

Biosecurity Act 2014

20

2.3

Commonwealth Environment Protection and Biodiversity Conservation Act 1999

20

2.4

Cultural Heritage and Native Title

21

2.4.1

Queensland Heritage Act 1992

21

2.4.2

Queensland Aboriginal Cultural Heritage Act 1993

21

2.4.3

Native Title Act 1993

22

2.5

Assessment Methodology

22

2.5.1 Overview of assessment methodology

22

2.5.2

Environmental Assessments

22

2.6

Community Engagement and Project Consultation Activities

23

3

Project Description

24

3.1

Overview of Existing Operations

24

3.1.1

Mining Tenure

24

3.1.2 Mine Method, Run of Mine and Product Coal Tonnages

24

3.1.3 Coal Handling and Preparation

25

3.1.4 Production and Supporting Infrastructure

26

3.1.5 Rejects and Tailings Management

26

3.1.6

Electricity Supply

26

3.1.7 Mine Water Management, Water Supply and Demand

27

3.1.8

Sewage Treatment

29

3.1.9 Fuel and Lubricant Storage and Dispensing

29

Version 1.0 (December 2023)

Uncontrolled when printed

i

Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information

3.1.10

Environmental Authority

29

3.2

Proposed Project

30

3.2.1

Introduction

30

3.2.2

Mining Tenure

30

3.2.3

Land Ownership within SA10 and SA7

30

3.2.4

Resource Characterisation

33

3.2.5

Mining Methods and Sequence

35

3.2.6

Waste Rock Management

37

3.2.7

Run of Mine and Product Coal Production Schedule

37

3.2.8

Coal Handling and Preparation

48

3.2.9

Rejects and Tailings Management

48

3.2.10

Final Voids

48

3.2.11

Mining Equipment

48

3.2.12

Blasting

50

3.2.13

Workforce Requirements and Accommodation Arrangements

50

3.2.14

Hours of Operation

50

3.2.15

Project-Specific Mine Infrastructure

51

3.2.16

Flood Protection

53

4

Rehabilitation

54

4.1

Progressive Rehabilitation and Closure Plan

54

4.2

Key Information

55

4.3

Conceptual Final Landform

56

4.4

Rehabilitated Landform Options Assessment

57

4.4.1

Final Void - Endwall Backfill for Flood Mitigation

59

4.4.2

Progressive Backfilling of Void

59

4.5

Proposed Land Outcomes

59

4.5.1

Post-Mining Land Use

59

4.5.2

Non-Use Management Areas

60

4.6

Rehabilitation Activities

61

4.6.1

Topsoil Management and Surface Preparation

61

4.6.2

Revegetation

63

4.7

Rehabilitation Schedule

65

4.8

Rehabilitation Goals, Milestones and Completion Criteria

68

4.8.1

Rehabilitation Goals

68

4.8.2

Rehabilitation Objectives, Indicators and Acceptance Criteria

68

4.8.3

Rehabilitation Areas, Improvement Areas and Milestones

68

4.8.4

Monitoring, Maintenance and Reporting

72

4.9

Exploration Areas

72

5

Project Justification and Alternatives

73

5.1

Justification

73

5.2

Alternatives

74

5.2.1

Project Location

74

5.2.2

Full Footprint Development

74

5.2.3

Non-Constrained Mine Plan - Sensitive Vegetation

74

5.2.4

No Project

75

Version 1.0 (December 2023)

Uncontrolled when printed

ii

Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information

5.3

Standard Criteria Assessment

75

5.3.1

Criterion (a) - Ecologically Sustainable Development

76

5.3.2 Criterion (b) - Applicable Commonwealth, State or Local plans, Standards,

Agreements or Requirements

80

5.3.3

Criterion (d) - Environmental Impact Study

82

5.3.4 Criterion (e) - Character, Resilience and Values of Receiving Environment..82

5.3.5

Criterion (f) - Submissions made by Applicant and Submitters

82

5.3.6

Criterion (g) - Best Practice Environmental Management

82

5.3.7

Criterion (h) - Financial Implications

83

5.3.8

Criterion (i) - Public Interest

83

5.3.9

Criterion (j) - Site Management Plan

83

5.3.10

Criterion (k) - Proposed integrated environmental management system

83

5.3.11

Criterion (l) - Other matters

83

6

Land Resources

84

6.1

Introduction

84

6.2

Environmental Values

84

6.2.1

Climate

84

6.2.2

Topography

84

6.2.3

Vegetation and Land-Use

84

6.2.4

Land Systems

84

6.2.5

Soil Classification and Description

85

6.3

Potential Impacts to Land Resources

87

6.3.1

Land Suitability

87

6.3.2

Agricultural Land

87

6.3.3

Land Capability

88

6.3.4

Grazing Suitability

88

6.4

Mitigation and Management Measures

89

6.4.1

Rehabilitation

89

6.4.2

Land Resources Mitigation Measures

92

7

Geochemistry

93

7.1

Introduction

93

7.2

Assessment Methodology

93

7.3

Environmental Values

94

7.3.1

Geochemical Characteristics of Non-Carbonaceous Mineral Waste

94

7.3.2

Geochemical Characteristics of Carbonaceous Spoil

95

7.3.3

Geochemical Characteristics of Tailings

96

7.3.4

Geochemical Characteristics of RoM Coal

97

7.4

Potential Impacts

98

7.5

Mitigation and Management Measures

98

7.5.1

Management and Mitigation of Spoil

98

7.5.2

Management and Mitigation of Tailings

99

7.5.3

Management and Mitigation of Coarse Reject

99

7.5.4

Validation of Tailings and Coal Reject Characteristics

99

7.5.5

Management of RoM Coal and RoM Stockpiles

99

Version 1.0 (December 2023)

Uncontrolled when printed

iii

Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information

8

Air Quality

....................................................................................................

101

8.1

Introduction

101

8.2

Environmental Values

101

8.2.1

Existing Receptors

101

8.2.2

Existing Air Quality Environment

104

8.2.3

Assessment Criteria

106

8.3

Air Quality Assessment Methodology

106

8.3.1

Dust Emission Sources

106

8.3.2

Dust Emission Scenarios

107

8.3.3

Dust Emissions Inventory

107

8.3.4

Overview of Dispersion Modelling

107

8.4

Potential Impacts

111

8.4.1

Dust Deposition

111

8.4.2

Particulate Matter as TSP

112

8.4.3

Particulate Matter as PM10

113

8.5

Mitigation and Management Measures

114

8.5.1

Existing Dust Management

114

8.5.2

Key Drivers to Dust Risk

115

8.5.3

Modelled PM10 Mitigation Scenarios

116

8.5.4

Comparison of the Project With (BAU) and (Fully Mitigated) Cases

118

8.5.5

Project Dust Management

119

8.6

Greenhouse Gas Emissions

120

9

Noise and Vibration

121

9.1

Introduction

121

9.2

Environmental Values

121

9.2.1

Existing Receptors

121

9.2.2

Existing Acoustic Environment

121

9.2.3

Noise and Vibration Assessment Criteria

125

9.3

Noise and Vibration Assessment Methodology

126

9.3.1

Noise and Vibrating Project Activities

126

9.3.2

Noise Modelling Scenarios

126

9.3.3

Noise Prediction Modelling

127

9.3.4

Cumulative Noise Impact Assessment

128

9.3.5

Blasting

128

9.4

Potential Impacts

128

9.4.1

Predicted Operational Noise Levels

128

9.4.2

Cumulative Noise Levels

133

9.4.3

Blasting

135

9.5

Mitigation and Management Measures

136

9.5.1

Operational Mine Noise

136

9.5.2

Cumulative Noise

139

9.5.3

Blasting

139

10

Surface Water

140

10.1 Introduction

140

Version 1.0 (December 2023)

Uncontrolled when printed

iv

Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information

10.2

Environmental Values

140

10.2.1

Regional and Local Hydrology

142

10.2.2

Water Quality Monitoring

144

10.2.3

Water Quality in Mine Affected Water Storages

147

10.2.4

Existing Water Users

147

10.2.5

Creek Geomorphology

147

10.3

Surface Water Management

149

10.3.1

Surface Water Management Strategy

149

10.3.2

Surface Water Storage

149

10.3.3

Flood Protection

151

10.4

Potential Impacts

153

10.4.1

Flooding

153

10.4.2

Changes to Stream Flows

156

10.4.3

Changes to Groundwater - Surface Water Interactions

159

10.4.4

Mine Water Releases

159

10.4.5

Water Quality Impacts

161

10.4.6

Great Barrier Reef Considerations

161

10.4.7

Final Void Assessment

161

10.4.8

EPBC Act Significant Impact Assessment

162

10.4.9

Cumulative Impacts

162

10.4.10

Climate Change

162

10.5 Mitigation and Management Measures

162

11

Groundwater

165

11.1

Introduction

165

11.2

Environmental Values

165

11.2.1

Environmental Values and Water Quality Objectives

165

11.2.2

Geology

167

11.2.3

Local Hydrostratigraphic Units

172

11.2.4

Groundwater Levels and Flow Directions

172

11.2.5

Hydraulic Properties

174

11.2.6

Groundwater-Surface Water Interactions

174

11.2.7

Groundwater Quality

176

11.2.8

Groundwater Use

178

11.3

Potential Impacts

183

11.3.1

Groundwater Numerical Model

183

11.3.2

Groundwater Inflows to Open Cut Pits

184

11.3.3

Groundwater Drawdown

184

11.3.4

Influence on Alluvium

185

11.3.5

Impacts on Groundwater Users

191

11.4 Mitigation and Management Measures

195

11.4.1

Groundwater Quality

195

11.4.2

Groundwater Use

195

11.4.3

Groundwater Monitoring Program

196

11.4.4

Data Management and Reporting

197

12

Terrestrial Ecology

198

Version 1.0 (December 2023)

Uncontrolled when printed

v

Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information

12.1

Introduction

198

12.2

Regional and Local Setting

198

12.3

Methodology

198

12.3.1

Desktop Assessment

198

12.3.2

Field Survey

199

12.4

Environmental Values

202

12.4.1

Terrestrial Flora

202

12.4.2

Terrestrial Fauna

212

12.4.3 Threatened and CEEVNT Fauna

213

12.4.4

Matters of National Environmental Significance

221

12.4.5 Matters of State Environmental Significance

222

12.5

Potential Impacts

224

12.5.1 Vegetation Clearing and Habitat Disturbance

224

12.5.2

Fragmentation

225

12.5.3

Erosion and Sedimentation

225

12.5.4

Bushfire

226

12.5.5

Noise, Dust and Lighting

226

12.5.6

Weeds and Pests

227

12.5.7

Fauna Mortality

227

12.5.8

Groundwater Drawdown

227

12.6

Mitigation and Management Measures

230

12.7

Significant Impact Assessments

232

12.7.1

Matters of National Environmental Significance

233

12.7.2 Matters of State Environmental Significance

236

13

Aquatic Ecology and Stygofauna

237

13.1

Introduction

237

13.2

Regional and Local Setting

237

13.3

Methodology

237

13.3.1

Baseline Surveys

237

13.3.2

Desktop Assessment

239

13.4

Environmental Values

241

13.4.1

Waterways

241

13.4.2 Lacustrine Wetlands and Farm Dams

242

13.4.3

Palustrine Wetlands

243

13.4.4 High Ecological Significance Wetlands and Wetlands of International or

National Importance

243

13.4.5

Water Quality

243

13.4.6

Sediment Quality

243

13.4.7

Aquatic Biota

244

13.4.8

Special Least Concern Species

245

13.4.9

Surface Expression GDEs

245

13.4.10

Stygofauna and Subterranean GDEs

245

13.4.11

Matters of National Environmental Significance

245

13.4.12

Matters of State Environmental Significance

246

13.5 Potential Impacts

248

Version 1.0 (December 2023)

Uncontrolled when printed

vi

Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information

13.5.1

Aquatic Habitat Modification and Loss

248

13.5.2

Fish Passage

248

13.5.3

Water Management Strategy and MAW Releases

249

13.5.4

Surface Water Quality

249

13.5.5

Surface Water Run-off of Seepage from Spoil

250

13.5.6

Flow Regime

250

13.5.7

Flood Regimes

250

13.5.8

Litter and Waste

251

13.5.9

Proliferation of Aquatic Pests

251

13.5.10

Aquatic GDEs

251

13.5.11

Matters of National Environmental Significance

252

13.5.12

Matters of State Environmental Significance

252

13.6

Mitigation and Management Measures

253

14

Waste Management

257

14.1

Introduction

257

14.2

Waste Management Objectives

257

14.3

Waste Management Strategy

257

14.4

Waste Management Plan

258

14.4.1

Waste Avoidance and Minimisation

259

14.4.2

Waste Segregation

259

14.4.3

Waste Reuse, Recycle and Recovery

260

14.4.4

Waste Disposal

260

14.5

Waste Production

261

14.6

Summary of Mitigation Measures and Commitments

261

14.7

Conclusion

261

15

Environmental Authority Amendments

267

15.1

EA Condition E23

267

15.2

EA Condition I1

267

15.3

EA Condition I2

267

References

.............................................................................................................

269

Glossary

278

Version 1.0 (December 2023)

Uncontrolled when printed

vii

Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information

List of Figures

Figure 1-1:

Project Location

2

Figure 1-2:

Project Overview

2

Figure 2-1:

Category B ESA - DES mapping within Project area

13

Figure 2-2:

Category B ESA, Ground-Truthed Vegetation Mapping within Project area

14

Figure 3-1:

Blackwater Mine - Typical Mining Sequence

24

Figure 3-2:

BWM Operation Process Schematic

25

Figure 3-3:

BWM Mine Water Management System Schematic

28

Figure 3-4:

Land Ownership SA7 and SA10

32

Figure 3-5:

Schematic Seam Stratigraphy and Split Diagram

34

Figure 3-6:

Indicative BWM Materials Schedule - FY2025 to FY2085

38

Figure 3-7:

Indicative Project Mining Progression

39

Figure 3-8:

Indicative Project Mining Progression at FY2025

40

Figure 3-9:

Indicative Project Mining Progression at FY2035

41

Figure 3-10:

Indicative Project Mining Progression at FY2045

42

Figure 3-11:

Indicative Project Mining Progression at FY2055

43

Figure 3-12:

Indicative Project Mining Progression at FY2065

44

Figure 3-13:

Indicative Project Mining Progression at FY2075

45

Figure 3-14:

Indicative Project Mining Progression at FY2085

46

Figure 3-15:

Indicative Conceptual Final Landform

47

Figure 4-1:

Indicative Residual Void Cross Section

58

Figure 4-2:

Conceptual Post-Mining Land Use

62

Figure 4-3:

Schematic of Mine and Spoil Dump Progression

67

Figure 8-1:

Project Area and Receptor Locations

103

Figure 8-2:

DES Blackwater monitoring station data - 24 hour average concentration of PM10

105

Figure 8-3:

Air Quality Assessment Locations (Detailed Results)

110

Figure 8-4:

Project With (BAU) Case: Key Drivers based on an Average over the LoM

116

Figure 9-1:

EMM Noise Monitoring Locations (EMM, 2021)

122

Figure 10-1:

Upper Mackenzie Sub-catchment of the Fitzroy Basin

141

Figure 10-2:

Local Waterways

145

Figure 10-3:

Water Quality Monitoring Locations

146

Figure 10-4:

Water Users

148

Figure 10-5:

Water Management Diagram

150

Figure 10-6:

Proposed Flood Protection Locations

152

Figure 10-7:

Extension Conditions Peak Flood Levels 0.1% AEP

154

Figure 10-8:

Extension Conditions Peak Flood Afflux 0.1% AEP

155

Figure 10-9:

Extension Conditions Climate Change Peak Flood Afflux 0.1% AEP

157

Figure 10-10:

Final Landform Peak Flood Depths 0.1% AEP

158

Figure 10-11:

Potential Change in Stream Flow

159

Figure 11-1:

Groundwater Management Areas and Chemistry Zones

166

Figure 11-2:

Surface Geology

168

Figure 11-3:

Solid Geology

169

Figure 11-4:

Geological Cross Section across the Groundwater Study Area

171

Figure 11-5:

Groundwater Monitoring Network

173

Version 1.0 (December 2023)

Uncontrolled when printed

viii

Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information

Figure 11-6:

Groundwater Level Contours in the Aries Seam and Pit Lake Elevations

(March 2023)

175

Figure 11-7:

Private Bores

179

Figure 11-8:

Predicted Terrestrial Groundwater Dependent Ecosystems

181

Figure 11-9:

Mapped Potential Aquatic GDEs in the Vicinity of the Project

182

Figure 11-10: Maximum Incremental (a) and Cumulative (b) Drawdown in the Alluvium and

Tertiary (Layer 1)

186

Figure 11-11: Maximum Incremental (a) and Cumulative (b) Drawdown in the Alluvium and

Tertiary (Layer 2)

187

Figure 11-12: Maximum Incremental (a) and Cumulative (b) Drawdown in the Aries Seam

(Layer 8)

188

Figure 11-13: Maximum Incremental (a) and Cumulative (b) Drawdown in the Pollux Seam

(Layer 12)

189

Figure 11-14: Maximum Incremental (a) and Cumulative (b) Drawdown in the Burngrove

Formation (Layer 14)

190

Figure 11-15: Indicative Final Void Locations

192

Figure 11-16: Groundwater Table Recovery (200 years Post-Mining)

193

Figure 12-1:

Desktop Search Area and Bioregions

200

Figure 12-2:

Ground-truthed Regional Ecosystems

204

Figure 12-3:

Brigalow TEC

208

Figure 12-4:

Threatened Flora - Solanum elachophyllum

209

Figure 12-5:

Potential TGDE Communities in and adjacent to the Project area

211

Figure 12-6:

Habitat Mapping - Australian Painted Snipe

215

Figure 12-7:

Habitat Mapping - Ornamental Snake

216

Figure 12-8:

Habitat Mapping - Squatter Pigeon

217

Figure 12-9:

Habitat Mapping - Koala

218

Figure 12-10:

Threatened and Migratory Fauna Observations

220

Figure 12-11:

Assessed Likelihood of Impact if Identified Potential GDEs

229

Figure 13-1:

Aquatic ecology sites and stygofauna bores surveyed in the baseline

monitoring for the Project

238

Figure 13-2:

BWM REMP Sites

240

Figure 13-3:

Waterway Barrier Works mapping in the vicinity of the Project

247

Figure 14-1:

Waste management hierarchy

259

List of Tables

Table 2-1:

Minor EA Amendment Threshold Criteria

9

Table 2-2:

EIS Trigger Assessment for the Project

11

Table 2-3:

DES and DCCEEW Consultation Activities

23

Table 3-1:

Blackwater Mine - Typical Pit Design Criteria

25

Table 3-2:

BWM - Existing Mine Water Management Overview

27

Table 3-3:

Project Area Mining Tenements

30

Table 3-4:

Land Ownership within SA10 and SA7

31

Table 3-5:

JORC Classified Resources for BWM (30 June 2023)

35

Table 3-6:

JORC Classified Reserves for BWM (30 June 2023)

35

Table 3-7:

Indicative Mining Fleet and Equipment

49

Version 1.0 (December 2023)

Uncontrolled when printed