BLACKWATER MINE
Blackwater Mine -
North Extension Project
Environmental Authority Amendment Supporting
Information Document
Status: Submission
Version: 1.0
Document Control
Reference | Date | Prepared | Checked | Authorised |
BWM EA Amendment Supporting | 14/12/2023 | SLR and BMA | ||
Document | ||||
Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information
Table of Contents
Abbreviations | xii | |||
1 | Introduction | 1 | ||
1.1 | The Application for Amendment | 1 | ||
1.2 | The Proponent | 1 | ||
1.3 | Existing BWM Operations | 4 | ||
1.4 | Project Overview | 5 | ||
1.5 | Project Objectives | 5 | ||
1.6 | Structure of this Document | 5 | ||
2 | Regulatory Considerations | 7 | ||
2.1 | Primary State Legislation | 7 | ||
2.1.1 Mining and Environmental Legislation | 7 | |||
2.1.2 | Mineral Resources Act 1989 | 7 | ||
2.1.3 | Environmental Protection Act 1994 | 8 | ||
2.2 | Other State Legislation | 16 | ||
2.2.1 | Water Act 2000 | 16 | ||
2.2.2 | Environmental Offsets Act 2014 | 17 | ||
2.2.3 | Planning Act 2016 | 18 | ||
2.2.4 | Regional Planning Interests Act 2014 | 18 | ||
2.2.5 | Fisheries Act 1994 | 18 | ||
2.2.6 | Nature Conservation Act 1992 | 19 | ||
2.2.7 | Vegetation Management Act 1999 | 19 | ||
2.2.8 | Biosecurity Act 2014 | 20 | ||
2.3 | Commonwealth Environment Protection and Biodiversity Conservation Act 1999 | 20 | ||
2.4 | Cultural Heritage and Native Title | 21 | ||
2.4.1 | Queensland Heritage Act 1992 | 21 | ||
2.4.2 | Queensland Aboriginal Cultural Heritage Act 1993 | 21 | ||
2.4.3 | Native Title Act 1993 | 22 | ||
2.5 | Assessment Methodology | 22 | ||
2.5.1 Overview of assessment methodology | 22 | |||
2.5.2 | Environmental Assessments | 22 | ||
2.6 | Community Engagement and Project Consultation Activities | 23 | ||
3 | Project Description | 24 | ||
3.1 | Overview of Existing Operations | 24 | ||
3.1.1 | Mining Tenure | 24 | ||
3.1.2 Mine Method, Run of Mine and Product Coal Tonnages | 24 | |||
3.1.3 Coal Handling and Preparation | 25 | |||
3.1.4 Production and Supporting Infrastructure | 26 | |||
3.1.5 Rejects and Tailings Management | 26 | |||
3.1.6 | Electricity Supply | 26 | ||
3.1.7 Mine Water Management, Water Supply and Demand | 27 | |||
3.1.8 | Sewage Treatment | 29 | ||
3.1.9 Fuel and Lubricant Storage and Dispensing | 29 |
Version 1.0 (December 2023) | Uncontrolled when printed | i |
Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information
3.1.10 | Environmental Authority | 29 | ||
3.2 | Proposed Project | 30 | ||
3.2.1 | Introduction | 30 | ||
3.2.2 | Mining Tenure | 30 | ||
3.2.3 | Land Ownership within SA10 and SA7 | 30 | ||
3.2.4 | Resource Characterisation | 33 | ||
3.2.5 | Mining Methods and Sequence | 35 | ||
3.2.6 | Waste Rock Management | 37 | ||
3.2.7 | Run of Mine and Product Coal Production Schedule | 37 | ||
3.2.8 | Coal Handling and Preparation | 48 | ||
3.2.9 | Rejects and Tailings Management | 48 | ||
3.2.10 | Final Voids | 48 | ||
3.2.11 | Mining Equipment | 48 | ||
3.2.12 | Blasting | 50 | ||
3.2.13 | Workforce Requirements and Accommodation Arrangements | 50 | ||
3.2.14 | Hours of Operation | 50 | ||
3.2.15 | Project-Specific Mine Infrastructure | 51 | ||
3.2.16 | Flood Protection | 53 | ||
4 | Rehabilitation | 54 | ||
4.1 | Progressive Rehabilitation and Closure Plan | 54 | ||
4.2 | Key Information | 55 | ||
4.3 | Conceptual Final Landform | 56 | ||
4.4 | Rehabilitated Landform Options Assessment | 57 | ||
4.4.1 | Final Void - Endwall Backfill for Flood Mitigation | 59 | ||
4.4.2 | Progressive Backfilling of Void | 59 | ||
4.5 | Proposed Land Outcomes | 59 | ||
4.5.1 | Post-Mining Land Use | 59 | ||
4.5.2 | Non-Use Management Areas | 60 | ||
4.6 | Rehabilitation Activities | 61 | ||
4.6.1 | Topsoil Management and Surface Preparation | 61 | ||
4.6.2 | Revegetation | 63 | ||
4.7 | Rehabilitation Schedule | 65 | ||
4.8 | Rehabilitation Goals, Milestones and Completion Criteria | 68 | ||
4.8.1 | Rehabilitation Goals | 68 | ||
4.8.2 | Rehabilitation Objectives, Indicators and Acceptance Criteria | 68 | ||
4.8.3 | Rehabilitation Areas, Improvement Areas and Milestones | 68 | ||
4.8.4 | Monitoring, Maintenance and Reporting | 72 | ||
4.9 | Exploration Areas | 72 | ||
5 | Project Justification and Alternatives | 73 | ||
5.1 | Justification | 73 | ||
5.2 | Alternatives | 74 | ||
5.2.1 | Project Location | 74 | ||
5.2.2 | Full Footprint Development | 74 | ||
5.2.3 | Non-Constrained Mine Plan - Sensitive Vegetation | 74 | ||
5.2.4 | No Project | 75 |
Version 1.0 (December 2023) | Uncontrolled when printed | ii |
Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information
5.3 | Standard Criteria Assessment | 75 | |
5.3.1 | Criterion (a) - Ecologically Sustainable Development | 76 |
5.3.2 Criterion (b) - Applicable Commonwealth, State or Local plans, Standards,
Agreements or Requirements | 80 | |
5.3.3 | Criterion (d) - Environmental Impact Study | 82 |
5.3.4 Criterion (e) - Character, Resilience and Values of Receiving Environment..82
5.3.5 | Criterion (f) - Submissions made by Applicant and Submitters | 82 | ||
5.3.6 | Criterion (g) - Best Practice Environmental Management | 82 | ||
5.3.7 | Criterion (h) - Financial Implications | 83 | ||
5.3.8 | Criterion (i) - Public Interest | 83 | ||
5.3.9 | Criterion (j) - Site Management Plan | 83 | ||
5.3.10 | Criterion (k) - Proposed integrated environmental management system | 83 | ||
5.3.11 | Criterion (l) - Other matters | 83 | ||
6 | Land Resources | 84 | ||
6.1 | Introduction | 84 | ||
6.2 | Environmental Values | 84 | ||
6.2.1 | Climate | 84 | ||
6.2.2 | Topography | 84 | ||
6.2.3 | Vegetation and Land-Use | 84 | ||
6.2.4 | Land Systems | 84 | ||
6.2.5 | Soil Classification and Description | 85 | ||
6.3 | Potential Impacts to Land Resources | 87 | ||
6.3.1 | Land Suitability | 87 | ||
6.3.2 | Agricultural Land | 87 | ||
6.3.3 | Land Capability | 88 | ||
6.3.4 | Grazing Suitability | 88 | ||
6.4 | Mitigation and Management Measures | 89 | ||
6.4.1 | Rehabilitation | 89 | ||
6.4.2 | Land Resources Mitigation Measures | 92 | ||
7 | Geochemistry | 93 | ||
7.1 | Introduction | 93 | ||
7.2 | Assessment Methodology | 93 | ||
7.3 | Environmental Values | 94 | ||
7.3.1 | Geochemical Characteristics of Non-Carbonaceous Mineral Waste | 94 | ||
7.3.2 | Geochemical Characteristics of Carbonaceous Spoil | 95 | ||
7.3.3 | Geochemical Characteristics of Tailings | 96 | ||
7.3.4 | Geochemical Characteristics of RoM Coal | 97 | ||
7.4 | Potential Impacts | 98 | ||
7.5 | Mitigation and Management Measures | 98 | ||
7.5.1 | Management and Mitigation of Spoil | 98 | ||
7.5.2 | Management and Mitigation of Tailings | 99 | ||
7.5.3 | Management and Mitigation of Coarse Reject | 99 | ||
7.5.4 | Validation of Tailings and Coal Reject Characteristics | 99 | ||
7.5.5 | Management of RoM Coal and RoM Stockpiles | 99 |
Version 1.0 (December 2023) | Uncontrolled when printed | iii |
Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information
8 | Air Quality | .................................................................................................... | 101 | |
8.1 | Introduction | 101 | ||
8.2 | Environmental Values | 101 | ||
8.2.1 | Existing Receptors | 101 | ||
8.2.2 | Existing Air Quality Environment | 104 | ||
8.2.3 | Assessment Criteria | 106 | ||
8.3 | Air Quality Assessment Methodology | 106 | ||
8.3.1 | Dust Emission Sources | 106 | ||
8.3.2 | Dust Emission Scenarios | 107 | ||
8.3.3 | Dust Emissions Inventory | 107 | ||
8.3.4 | Overview of Dispersion Modelling | 107 | ||
8.4 | Potential Impacts | 111 | ||
8.4.1 | Dust Deposition | 111 | ||
8.4.2 | Particulate Matter as TSP | 112 | ||
8.4.3 | Particulate Matter as PM10 | 113 | ||
8.5 | Mitigation and Management Measures | 114 | ||
8.5.1 | Existing Dust Management | 114 | ||
8.5.2 | Key Drivers to Dust Risk | 115 | ||
8.5.3 | Modelled PM10 Mitigation Scenarios | 116 | ||
8.5.4 | Comparison of the Project With (BAU) and (Fully Mitigated) Cases | 118 | ||
8.5.5 | Project Dust Management | 119 | ||
8.6 | Greenhouse Gas Emissions | 120 |
9 | Noise and Vibration | 121 | ||
9.1 | Introduction | 121 | ||
9.2 | Environmental Values | 121 | ||
9.2.1 | Existing Receptors | 121 | ||
9.2.2 | Existing Acoustic Environment | 121 | ||
9.2.3 | Noise and Vibration Assessment Criteria | 125 | ||
9.3 | Noise and Vibration Assessment Methodology | 126 | ||
9.3.1 | Noise and Vibrating Project Activities | 126 | ||
9.3.2 | Noise Modelling Scenarios | 126 | ||
9.3.3 | Noise Prediction Modelling | 127 | ||
9.3.4 | Cumulative Noise Impact Assessment | 128 | ||
9.3.5 | Blasting | 128 | ||
9.4 | Potential Impacts | 128 | ||
9.4.1 | Predicted Operational Noise Levels | 128 | ||
9.4.2 | Cumulative Noise Levels | 133 | ||
9.4.3 | Blasting | 135 | ||
9.5 | Mitigation and Management Measures | 136 | ||
9.5.1 | Operational Mine Noise | 136 | ||
9.5.2 | Cumulative Noise | 139 | ||
9.5.3 | Blasting | 139 |
10 | Surface Water | 140 |
10.1 Introduction | 140 |
Version 1.0 (December 2023) | Uncontrolled when printed | iv |
Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information
10.2 | Environmental Values | 140 | ||
10.2.1 | Regional and Local Hydrology | 142 | ||
10.2.2 | Water Quality Monitoring | 144 | ||
10.2.3 | Water Quality in Mine Affected Water Storages | 147 | ||
10.2.4 | Existing Water Users | 147 | ||
10.2.5 | Creek Geomorphology | 147 | ||
10.3 | Surface Water Management | 149 | ||
10.3.1 | Surface Water Management Strategy | 149 | ||
10.3.2 | Surface Water Storage | 149 | ||
10.3.3 | Flood Protection | 151 | ||
10.4 | Potential Impacts | 153 | ||
10.4.1 | Flooding | 153 | ||
10.4.2 | Changes to Stream Flows | 156 | ||
10.4.3 | Changes to Groundwater - Surface Water Interactions | 159 | ||
10.4.4 | Mine Water Releases | 159 | ||
10.4.5 | Water Quality Impacts | 161 | ||
10.4.6 | Great Barrier Reef Considerations | 161 | ||
10.4.7 | Final Void Assessment | 161 | ||
10.4.8 | EPBC Act Significant Impact Assessment | 162 | ||
10.4.9 | Cumulative Impacts | 162 | ||
10.4.10 | Climate Change | 162 | ||
10.5 Mitigation and Management Measures | 162 | |||
11 | Groundwater | 165 | ||
11.1 | Introduction | 165 | ||
11.2 | Environmental Values | 165 | ||
11.2.1 | Environmental Values and Water Quality Objectives | 165 | ||
11.2.2 | Geology | 167 | ||
11.2.3 | Local Hydrostratigraphic Units | 172 | ||
11.2.4 | Groundwater Levels and Flow Directions | 172 | ||
11.2.5 | Hydraulic Properties | 174 | ||
11.2.6 | Groundwater-Surface Water Interactions | 174 | ||
11.2.7 | Groundwater Quality | 176 | ||
11.2.8 | Groundwater Use | 178 | ||
11.3 | Potential Impacts | 183 | ||
11.3.1 | Groundwater Numerical Model | 183 | ||
11.3.2 | Groundwater Inflows to Open Cut Pits | 184 | ||
11.3.3 | Groundwater Drawdown | 184 | ||
11.3.4 | Influence on Alluvium | 185 | ||
11.3.5 | Impacts on Groundwater Users | 191 | ||
11.4 Mitigation and Management Measures | 195 | |||
11.4.1 | Groundwater Quality | 195 | ||
11.4.2 | Groundwater Use | 195 | ||
11.4.3 | Groundwater Monitoring Program | 196 | ||
11.4.4 | Data Management and Reporting | 197 | ||
12 | Terrestrial Ecology | 198 |
Version 1.0 (December 2023) | Uncontrolled when printed | v |
Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information
12.1 | Introduction | 198 | ||
12.2 | Regional and Local Setting | 198 | ||
12.3 | Methodology | 198 | ||
12.3.1 | Desktop Assessment | 198 | ||
12.3.2 | Field Survey | 199 | ||
12.4 | Environmental Values | 202 | ||
12.4.1 | Terrestrial Flora | 202 | ||
12.4.2 | Terrestrial Fauna | 212 | ||
12.4.3 Threatened and CEEVNT Fauna | 213 | |||
12.4.4 | Matters of National Environmental Significance | 221 | ||
12.4.5 Matters of State Environmental Significance | 222 | |||
12.5 | Potential Impacts | 224 | ||
12.5.1 Vegetation Clearing and Habitat Disturbance | 224 | |||
12.5.2 | Fragmentation | 225 | ||
12.5.3 | Erosion and Sedimentation | 225 | ||
12.5.4 | Bushfire | 226 | ||
12.5.5 | Noise, Dust and Lighting | 226 | ||
12.5.6 | Weeds and Pests | 227 | ||
12.5.7 | Fauna Mortality | 227 | ||
12.5.8 | Groundwater Drawdown | 227 | ||
12.6 | Mitigation and Management Measures | 230 | ||
12.7 | Significant Impact Assessments | 232 | ||
12.7.1 | Matters of National Environmental Significance | 233 | ||
12.7.2 Matters of State Environmental Significance | 236 | |||
13 | Aquatic Ecology and Stygofauna | 237 | ||
13.1 | Introduction | 237 | ||
13.2 | Regional and Local Setting | 237 | ||
13.3 | Methodology | 237 | ||
13.3.1 | Baseline Surveys | 237 | ||
13.3.2 | Desktop Assessment | 239 | ||
13.4 | Environmental Values | 241 | ||
13.4.1 | Waterways | 241 | ||
13.4.2 Lacustrine Wetlands and Farm Dams | 242 | |||
13.4.3 | Palustrine Wetlands | 243 |
13.4.4 High Ecological Significance Wetlands and Wetlands of International or
National Importance | 243 | |
13.4.5 | Water Quality | 243 |
13.4.6 | Sediment Quality | 243 |
13.4.7 | Aquatic Biota | 244 |
13.4.8 | Special Least Concern Species | 245 |
13.4.9 | Surface Expression GDEs | 245 |
13.4.10 | Stygofauna and Subterranean GDEs | 245 |
13.4.11 | Matters of National Environmental Significance | 245 |
13.4.12 | Matters of State Environmental Significance | 246 |
13.5 Potential Impacts | 248 |
Version 1.0 (December 2023) | Uncontrolled when printed | vi |
Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information
13.5.1 | Aquatic Habitat Modification and Loss | 248 | ||
13.5.2 | Fish Passage | 248 | ||
13.5.3 | Water Management Strategy and MAW Releases | 249 | ||
13.5.4 | Surface Water Quality | 249 | ||
13.5.5 | Surface Water Run-off of Seepage from Spoil | 250 | ||
13.5.6 | Flow Regime | 250 | ||
13.5.7 | Flood Regimes | 250 | ||
13.5.8 | Litter and Waste | 251 | ||
13.5.9 | Proliferation of Aquatic Pests | 251 | ||
13.5.10 | Aquatic GDEs | 251 | ||
13.5.11 | Matters of National Environmental Significance | 252 | ||
13.5.12 | Matters of State Environmental Significance | 252 | ||
13.6 | Mitigation and Management Measures | 253 | ||
14 | Waste Management | 257 | ||
14.1 | Introduction | 257 | ||
14.2 | Waste Management Objectives | 257 | ||
14.3 | Waste Management Strategy | 257 | ||
14.4 | Waste Management Plan | 258 | ||
14.4.1 | Waste Avoidance and Minimisation | 259 | ||
14.4.2 | Waste Segregation | 259 | ||
14.4.3 | Waste Reuse, Recycle and Recovery | 260 | ||
14.4.4 | Waste Disposal | 260 | ||
14.5 | Waste Production | 261 | ||
14.6 | Summary of Mitigation Measures and Commitments | 261 | ||
14.7 | Conclusion | 261 | ||
15 | Environmental Authority Amendments | 267 | ||
15.1 | EA Condition E23 | 267 | ||
15.2 | EA Condition I1 | 267 | ||
15.3 | EA Condition I2 | 267 | ||
References | ............................................................................................................. | 269 | ||
Glossary | 278 |
Version 1.0 (December 2023) | Uncontrolled when printed | vii |
Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information
List of Figures | ||
Figure 1-1: | Project Location | 2 |
Figure 1-2: | Project Overview | 2 |
Figure 2-1: | Category B ESA - DES mapping within Project area | 13 |
Figure 2-2: | Category B ESA, Ground-Truthed Vegetation Mapping within Project area | 14 |
Figure 3-1: | Blackwater Mine - Typical Mining Sequence | 24 |
Figure 3-2: | BWM Operation Process Schematic | 25 |
Figure 3-3: | BWM Mine Water Management System Schematic | 28 |
Figure 3-4: | Land Ownership SA7 and SA10 | 32 |
Figure 3-5: | Schematic Seam Stratigraphy and Split Diagram | 34 |
Figure 3-6: | Indicative BWM Materials Schedule - FY2025 to FY2085 | 38 |
Figure 3-7: | Indicative Project Mining Progression | 39 |
Figure 3-8: | Indicative Project Mining Progression at FY2025 | 40 |
Figure 3-9: | Indicative Project Mining Progression at FY2035 | 41 |
Figure 3-10: | Indicative Project Mining Progression at FY2045 | 42 |
Figure 3-11: | Indicative Project Mining Progression at FY2055 | 43 |
Figure 3-12: | Indicative Project Mining Progression at FY2065 | 44 |
Figure 3-13: | Indicative Project Mining Progression at FY2075 | 45 |
Figure 3-14: | Indicative Project Mining Progression at FY2085 | 46 |
Figure 3-15: | Indicative Conceptual Final Landform | 47 |
Figure 4-1: | Indicative Residual Void Cross Section | 58 |
Figure 4-2: | Conceptual Post-Mining Land Use | 62 |
Figure 4-3: | Schematic of Mine and Spoil Dump Progression | 67 |
Figure 8-1: | Project Area and Receptor Locations | 103 |
Figure 8-2: | DES Blackwater monitoring station data - 24 hour average concentration of PM10 | 105 |
Figure 8-3: | Air Quality Assessment Locations (Detailed Results) | 110 |
Figure 8-4: | Project With (BAU) Case: Key Drivers based on an Average over the LoM | 116 |
Figure 9-1: | EMM Noise Monitoring Locations (EMM, 2021) | 122 |
Figure 10-1: | Upper Mackenzie Sub-catchment of the Fitzroy Basin | 141 |
Figure 10-2: | Local Waterways | 145 |
Figure 10-3: | Water Quality Monitoring Locations | 146 |
Figure 10-4: | Water Users | 148 |
Figure 10-5: | Water Management Diagram | 150 |
Figure 10-6: | Proposed Flood Protection Locations | 152 |
Figure 10-7: | Extension Conditions Peak Flood Levels 0.1% AEP | 154 |
Figure 10-8: | Extension Conditions Peak Flood Afflux 0.1% AEP | 155 |
Figure 10-9: | Extension Conditions Climate Change Peak Flood Afflux 0.1% AEP | 157 |
Figure 10-10: | Final Landform Peak Flood Depths 0.1% AEP | 158 |
Figure 10-11: | Potential Change in Stream Flow | 159 |
Figure 11-1: | Groundwater Management Areas and Chemistry Zones | 166 |
Figure 11-2: | Surface Geology | 168 |
Figure 11-3: | Solid Geology | 169 |
Figure 11-4: | Geological Cross Section across the Groundwater Study Area | 171 |
Figure 11-5: | Groundwater Monitoring Network | 173 |
Version 1.0 (December 2023) | Uncontrolled when printed | viii |
Blackwater Mine - North Extension Project Environmental Authority Amendment Supporting Information
Figure 11-6: | Groundwater Level Contours in the Aries Seam and Pit Lake Elevations | |
(March 2023) | 175 | |
Figure 11-7: | Private Bores | 179 |
Figure 11-8: | Predicted Terrestrial Groundwater Dependent Ecosystems | 181 |
Figure 11-9: | Mapped Potential Aquatic GDEs in the Vicinity of the Project | 182 |
Figure 11-10: Maximum Incremental (a) and Cumulative (b) Drawdown in the Alluvium and | ||
Tertiary (Layer 1) | 186 | |
Figure 11-11: Maximum Incremental (a) and Cumulative (b) Drawdown in the Alluvium and | ||
Tertiary (Layer 2) | 187 | |
Figure 11-12: Maximum Incremental (a) and Cumulative (b) Drawdown in the Aries Seam | ||
(Layer 8) | 188 | |
Figure 11-13: Maximum Incremental (a) and Cumulative (b) Drawdown in the Pollux Seam | ||
(Layer 12) | 189 | |
Figure 11-14: Maximum Incremental (a) and Cumulative (b) Drawdown in the Burngrove | ||
Formation (Layer 14) | 190 | |
Figure 11-15: Indicative Final Void Locations | 192 | |
Figure 11-16: Groundwater Table Recovery (200 years Post-Mining) | 193 | |
Figure 12-1: | Desktop Search Area and Bioregions | 200 |
Figure 12-2: | Ground-truthed Regional Ecosystems | 204 |
Figure 12-3: | Brigalow TEC | 208 |
Figure 12-4: | Threatened Flora - Solanum elachophyllum | 209 |
Figure 12-5: | Potential TGDE Communities in and adjacent to the Project area | 211 |
Figure 12-6: | Habitat Mapping - Australian Painted Snipe | 215 |
Figure 12-7: | Habitat Mapping - Ornamental Snake | 216 |
Figure 12-8: | Habitat Mapping - Squatter Pigeon | 217 |
Figure 12-9: | Habitat Mapping - Koala | 218 |
Figure 12-10: | Threatened and Migratory Fauna Observations | 220 |
Figure 12-11: | Assessed Likelihood of Impact if Identified Potential GDEs | 229 |
Figure 13-1: | Aquatic ecology sites and stygofauna bores surveyed in the baseline | |
monitoring for the Project | 238 | |
Figure 13-2: | BWM REMP Sites | 240 |
Figure 13-3: | Waterway Barrier Works mapping in the vicinity of the Project | 247 |
Figure 14-1: | Waste management hierarchy | 259 |
List of Tables | ||
Table 2-1: | Minor EA Amendment Threshold Criteria | 9 |
Table 2-2: | EIS Trigger Assessment for the Project | 11 |
Table 2-3: | DES and DCCEEW Consultation Activities | 23 |
Table 3-1: | Blackwater Mine - Typical Pit Design Criteria | 25 |
Table 3-2: | BWM - Existing Mine Water Management Overview | 27 |
Table 3-3: | Project Area Mining Tenements | 30 |
Table 3-4: | Land Ownership within SA10 and SA7 | 31 |
Table 3-5: | JORC Classified Resources for BWM (30 June 2023) | 35 |
Table 3-6: | JORC Classified Reserves for BWM (30 June 2023) | 35 |
Table 3-7: | Indicative Mining Fleet and Equipment | 49 |
Version 1.0 (December 2023) | Uncontrolled when printed | ix |
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
BHP Group Limited published this content on 06 March 2024 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 06 March 2024 07:02:03 UTC.