Silver Storm Mining Ltd. announced further drill results from its Phase 1 diamond drilling program at the Company?s 100% owned La Parrilla Silver Mine Complex, located in Durango Mexico. Results from the three holes within this release are from the Quebradillas mine. The C460 Zone is a sulphide replacement vein striking 344 degrees and dipping 63 degrees to the northeast with a known strike length of 425 m. The zone is mineralized over a vertical extent of 570 m and its thickness varies up to 8.5 m. The replacement vein is concordant to bedding in the sediments and mineralization is comprised of pyrite, pyrrhotite, galena, sphalerite, arsenopyrite, acanthite, and freibergite.

Hole Q-23-022A was drilled to target the downdip extension of the C460 Zone, successfully intersecting replacement mineralization, returning 911 g/t Ag.Eq over 13.05 m (125.55 to 138.60 m), including 2,361 g/t Ag.Eq over 2.60 m (129.00 to 131.60 m) and 1,266 g/t Ag.Eq over 2.15 m (134.85 to 137.00 m) ? See Table 1; This intercept is located approximately 62 m below Hole Q-23-020 which returned 1,810 g/t Ag.Eq over 14.62 m and located approximately74 m vertically below the last mine development in this area, with similar high-grade mineralization. The composited weighted average grade of historical channel samples from the 1767 EL stope returned 974 g/t Ag.Eq over a strike length of 23 m and average width of 2.86 m.