ersonal use only

Delivering Clean Energy for

the Mid West

Corporate Presentation

June 2022

PILOT ENERGY LIMITED

ASX:PGY

ersonal use only

Compliance statements

Disclaimer

This investor presentation has been prepared by Pilot Energy Limited ABN 86 115 229 984 (Pilot or the Company).

Any material used in this presentation is only an overview and summary of certain data selected by the management of Pilot. The presentation does not purport to contain all the information that a prospective investor may require in evaluating a possible investment in Pilot nor does it contain all the information which would be required in a disclosure document prepared in accordance with the requirements of the Corporations Act and should not be used in isolation as a basis to invest in Pilot. Recipients of this presentation must make their own independent investigations, consideration and evaluation of Pilot. Pilot recommends that potential investors consult their professional advisor/s as an investment in Pilot is considered to be speculative in nature.

This presentation contains "forward looking statements" concerning the financial condition, results of operations and business of Pilot. All statements other than statements of fact or aspirational statements, are or may be deemed to be "forward looking statements". Often, but not always, forward looking statements can generally be identified by the use of forward looking words such as "may", "will", "expect", "intend", "plan", "estimate", "anticipate", "continue", "outlook", and "guidance", or other similar words & may include, without limitation, statements regarding plans, strategies and objectives of management, future or anticipated production or construction commencement dates and expected costs, resources or reserves, exploration results or production outputs.

Assumptions and Forward Looking Statements

Forward looking statements are statements of future expectations that are based on management's current expectations and assumptions, known and unknown risks and uncertainties that could cause the actual results, performance or events to differ materially from those expressed or implied in these statements. These risks include, but are not limited to price fluctuations, actual demand, currency fluctuations, drilling and production results, commercialisation reserve estimates, loss of market, industry competition, environmental risks, physical risks, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries and regions, political risks, project delay or advancement, approvals and cost estimates.

Statements in this presentation are made only as of the date of this presentation unless otherwise stated & the information in this presentation remains subject to change without notice. Reliance should not be placed on information or opinions contained in this presentation. To the maximum extent permitted by law, Pilot disclaims any responsibility to inform any recipient of this presentation on any matter that subsequently comes to its notice which may affect any of the information contained in this document and presentation and undertakes no obligation to provide any additional or updated information whether as a result of new information, future events or results or otherwise.

No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions or conclusions contained in or derived from this presentation or any omission from this presentation or of any other written or oral information or opinions provided now or in the future to any person. To the maximum extent permitted by law, neither Pilot nor, any affiliates, related bodies corporate and their respective officers, directors, employees, advisors and agents (Relevant Parties), nor any other person, accepts any liability as to or in relation to the accuracy or completeness of the information, statements, opinions or matters (express or implied) arising out of, contained in or derived from this presentation or any omission from this presentation or of any other written or oral information or opinions provided now or in the future to any person

2 Pilot Energy Corporate Presentation | June 2022

Competent Persons Statement

This announcement contains information on conventional petroleum and carbon storage resources which is based on and fairly represents information and supporting documentation reviewed by Dr Xingjin Wang, a Petroleum Engineer with over 30 years' experience and a Master in Petroleum Engineering from the University of New South Wales and a PhD in applied Geology from the University of New South Wales. Dr Wang is an active member of the SPE and PESA and is qualified in accordance with ASX listing rule 5.1. He is a former Director of Pilot Energy Ltd and has consented to the inclusion of this information in the form and context to which it appears.

Authorisation

This presentation has been authorized by the Chairman and Managing Director on behalf of the Board of Directors of Pilot Energy Limited

Mid West WSP Feasibility Study Reporting Conditions

Pilot has agreed the following conditions with the ASX in relation to the Mid West WSP feasibility study:

  1. The Company must continue to spend funds on its existing and proposed oil and gas projects.
  2. The Company must disclose in each quarterly activities report until September 2022, the proportion of expenditure incurred in relation to exploration and evaluation on the oil and gas projects and the Mid West Wind and Solar Project.
  3. The Company must disclose as separate line items in each quarterly activities report until September 2022, expenditure incurred in relation to exploration and evaluation on the oil and gas projects and the Mid West Wind and Solar Project.
  4. Proceeding beyond the feasibility study stage of the Project (or incurring expenditure in excess of the budgeted feasibility expenditure in relation to the Project) constitutes a change in the nature and scale of the Company's activities in terms of Listing Rule 11.1 and as such the Company will be required to comply with all of the requirements of Chapters 1 and 2 of the Listing Rules before it proceeds beyond the feasibility study or incurs expenditures in excess of the budgeted feasibility expenditure on the Project.

ersonal use only

Pilot's Clean Energy opportunity

Transforming existing assets and established infrastructure to deliver competitive, low cost clean energy

What we have

What we're building

Western

Australia

Wind / Solar

Carbon

Capture2

Existing

Operations1

&

Transition

Clean Energy

Clean

& Transform

Resource hub

H2 / Ammonia

Established

Infrastructure1

Perth

1: Cliff Head JV currently Triangle Energy (Global) Limited 78.25%/Pilot Energy 21.25%

Bunbury

2. Note: Image of Equinor Sleipner CCS Field. Credit - Øyvind Gravås and Bo B. Randulff

3 Pilot Energy Corporate Presentation | June 2022

Investment highlights

ersonal use only

Material world-class natural

Ownership in key energy

Leveraging existing operations into

resources & renewables footprint

licenses & infrastructure

world-class clean energy projects

Feasibility studies confirm viability of

Significant near-term cash flow

Proven and experienced Board

significant CCS, Clean H2/Ammonia

substantially funds development

and Management team

and renewable energy development

4 Pilot Energy Corporate Presentation | June 2022

The Energy Transition is underway

ersonal use only

5 Pilot Energy Corporate Presentation | June 2022

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Pilot Energy Limited published this content on 07 June 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 08 June 2022 00:01:02 UTC.