4.66 g/t Au over 64.0 m (
Camino Rojo Sulphides: The Sulphide drill program continued to return higher-grade gold intercepts (>2 g/t) over wide widths (>30 m). Notable results include:[1]
- Hole CRSX22-09B: 4.66 g/t Au over 64.0 m
- Hole CRSX22-09A 2.76 g/t Au over 79.0 m, incl. 3.22 g/t Au over 55.0m
- Hole CRSX22-08C: 2.81 g/t Au over 70.0 m
- Hole CRSX22-10A: 1.92 g/t Au over 87.0 m, incl. 3.14 g/t Au over 25.5 m and 1.74 g/t Au over 73.5m, incl. 2.61 g/t Au over 24.0 m
- Hole CRSX22-09: 3.83 g/t Au over 40.5 m, incl. 9.28 g/t Au over 9.0 m and 6.94 g/t Au over 16.0 m
- Hole CRSX22-08B: 3.78 g/t Au over 37.0 m
- Hole CRSX22-10: 2.71 g/t Au over 49.5 m, incl. 6.80 g/t Au over 8.0 m
Camino Rojo Deep Potential: Drill results have shown that gold mineralization extends deeper than the limit of the current mineral resource. These deeper intercepts suggest gold mineralization remains open at depth along and adjacent to interpreted feeder-like structures for the currently defined
- Hole CRSX22-07: 4.02 g/t Au & 1.5% Zn over 22.9 m, incl. 56.7 g/t Au & 17.2% Zn over 0.6 m
Regional Exploration: Encouraging drill result on the first diamond drill core hole completed outside the footprint of the Camino Rojo mine. The Guanamero target area is located approximately 7 km northeast of the Camino Rojo mine along the mine structural trend. Notable results include:1
- Hole CRED22-01: 0.54 g/t over 7.10 m, incl. 4.12 g/t over 0.7 m (from 51.4 m) and 1.35 g/t over 2.35 m, incl. 5.59 g/t over 0.5 m (from 104.95 m)
"The 2022 infill drilling of the sulphide extension of the Camino Rojo deposit has consistently generated exceptional gold intersections enhancing future development opportunity scenarios and potential to grow the resource at depth", stated
Exploration at Camino Rojo in 2022 focused on advancing the understanding of the sulphide deposit (the "
Drill results at Camino Rojo Sulphides continue to support potential for underground development
Drilling continues to intercept wide zones of higher-grade gold mineralization, and in conjunction with metallurgical results from the 2021 drilling (see news release dated
The current mineral resource estimate for the
Vein domains constraining higher grade gold in sulphide deposit
The 2022 sulphide drill program has helped define areas of high vein concentrations ("vein domains") which coincide with higher grade (>2 g/t) gold mineralization. The vein domains are important geological controls on gold mineralization, constraining the distribution and continuity of higher-grade gold mineralization within the sulphide deposit. Improved confidence in geological controls will strengthen future mineral resource estimations.
Vein domains have been defined by combining recent oriented diamond drill core data and approximately 70,000 m of historical vein density and orientation data within the main zone of potassic alteration (Kp). This work has resulted in the definition of three steep northwest and five shallow south-southwest dipping vein domains (Figure 4). High grade gold (>10 g/t Au) appears to be concentrated at the intersection of these steep and shallow dipping domains.
Figure 4: Camino Rojo Sulphides 2022 Program Vein Domains (Cross Section, Hole 7)
Potential new oxide mineralization outside current pit boundaries
Hole CRSX22-05, drilled as part of the 2022 sulphide drill program, intersected a mix of oxide and transitional material on the edge of the oxide open pit along the dike structure with mineralized intersections of 1.95 g/t over 61.2 m and 1.03 g/t over 25.3 m (see news release dated
Select holes from the recently completed 2022 sulphide drill program were extended to test the down plunge continuity of gold mineralization along the
Most of the gold mineralization at Camino Rojo has been defined in the Caracol Formation where auriferous veins are mostly constrained to a broad envelope of potassic alteration (Kp). Recent and compiled historical drilling indicates gold mineralization extends deeper into the underlying Indidura and Cuesta
2022 notable results hosted in Indidura or Cuesta
- Hole CRSX22-07: 4.02 g/t Au over 22.9 m, incl. 9.30 g/t Au over 6.1 m
- Hole CRSX22-08B: 1.28 g/t Au over 24.6 m
- Hole CRSX22-08B: 1.33 g/t Au over 17.2 m
- Hole CRSX22-08C: 2.50 g/t Au over 9.1 m
- Hole CRSX22-08C: 1.81 g/t Au over 19.4 m, incl. 2.51 g/t Au over 9.0 m
Selected historical4 results below Caracol Formation in Indidura or Cuesta del Cura Formations:
- Hole CR12-366D: 4.04 g/t Au over 46.5 m, incl. 6.26 g/t Au over 27.0 m
- Hole CR13-507DB: 3.08 g/t Au over 55.5 m, incl 5.67 g/t Au over 22.5 m
- Hole CR13-455D: 6.12 g/t Au over 21.0 m, incl 18.75 g/t Au over 6.0 m
- Hole CR13-454D: 2.11 g/t Au over 51.0 m, incl 6.72 g/t Au over 4.5 m
- Hole CR13-453D: 3.62 g/t Au over 27.0 m
- Hole CR14-597DG: 3.68 g/t Au over 25.5 m incl 11.49 g/t Au over 6.0 m
Orla's first diamond drill core hole outside the Camino Rojo deposit returned 0.54 g/t Au over 7.10 m and 1.35 g/t Au over 2.35 m at the Guanamero target. Prior to this drill hole, meaningful gold mineralization had been restricted to the footprint of the Camino Rojo Deposit. These new regional exploration results, combined with strong exploration markers are a very encouraging step towards making a regional discovery. The positive exploration markers for Guanamero include the presence of gold-bearing mafic dikes, alteration and rock types similar to
Early-stage exploration targets were tested with reverse circulation ("RC") drilling along the
- 0.54 g/t over 7.10m, incl. 4.12 g/t over 0.7m (from 51.4 m)
- 0.39 g/t over 5.50 m, incl. 1.02 g/t over 1.5 m (from 74.5 m)
- 1.35 g/t over 2.35 m, incl. 3.83 g/t over 0.8 m (from 104.95 m)
- 0.24 g/t over 5.65 m, incl. 1.42 g/t over 0.6m (from 116.9 m)
- 0.44 g/t over 3.0 m (from 137.5 m)
- 0.20 g/t over 4.3 m (from 151.0 m)
- 0.32 g/t over 9.05 m (from 169.95 m)
- 0.11 g/t over 17.5 m (from 279.5 m)
- 2.17 g/t over 1.20 m (from 398.3 m)
- 0.63 g/t over 1.5 m (from 571.5 m)
Composites for the regional exploration drilling were calculated using 0.1 g/t Au cut-off grade and maximum 6 metres consecutive waste.
Mexico Exploration 2023 | Program | Drilling Planned | Spend |
Camino Rojo Layback Drilling (capitalized) | Infill on oxide mine layback area | 3,000 m DD | |
Camino Rojo Sulphides Drilling | Infilling sulphides and other near-mine drilling | 34,000 m DD sulphides (20% deep extension) 6,500 m DD (oxides) | |
Camino Rojo Regional Exploration | Target drill testing and target definition | 15,000-20,000 m RC 2,000-5,000 m DD +Geophysical & geochemical surveys | |
Total Mexico Exploration |
A 3,000 metre, 22-hole drill program to confirm and delineate mineralization located in the oxide pit layback and allow for potential update of mineral resource and reserve estimates will be completed in 2023. This program will seek to define additional oxide reserves at the
Camino Rojo Sulphides drilling continuation
A 34,000-metre, 57 hole follow-up drill program will continue to infill the Camino Rojo Sulphides in 2023. 20% of the holes will extend to test the deep potential of the deposit. In addition, 6,500m will be drilled on the extensions of the Camino Rojo oxide deposit to update and expand resources and reserves.
Based on the positive results encountered in the 2021 and 2022 programs, more closely spaced, south-oriented drilling will be required to fully capture the extent of a potential underground resource. To date, 15,253 metres of directional drilling has been completed. This drilling has continued to inform Orla's perspective on the development approach to the deposit. The 2023 drilling is expected to strengthen the confidence for the development of a Preliminary Economic Assessment ("PEA") that contemplates underground mining by infilling the higher-grade (>2 g/t) portions of the deposit with 50 metre spacing of South-oriented drill holes. Overall drill spacing at the end of this next phase, including historical north-oriented drill holes, will be 25-30 metres. Upon the completion of the 2023 additional south oriented directional drilling and test work programs, a PEA is expected to be completed based on the optimal development scenario for Orla.
Approximately 15,000-20,000 metres of RC drilling and 2,000-5,000 metres of core drilling is planned for regional exploration in 2023. Regional exploration will consist of drill testing multiple targets outside the Camino Rojo deposit including priority targets along the northeast-southwest mine trend, including targets associated with recently defined IP anomalies. Priority targets such as Guanamero and Monterilla at the north-east and CR SW immediately to the south-west of the Camino Rojo deposit were only partially tested in 2022 and will be drill tested in 2023. Geophysical and geochemical surveys are also planned for 2023 to keep defining new targets.
The scientific and technical information in this news release has been reviewed and approved by Mr.
To verify the information related to the 2022 drilling programs at the Camino Rojo property,
All gold results at Camino Rojo were obtained by ALS Minerals (Au-AA23) using fire assay fusion and an atomic absorption spectroscopy finish. All samples are also analyzed for multi-elements, including silver, copper, lead and zinc using a four-acid digestion with ICP-AES finish (ME-ICP61) method at
Orla is operating the
This news release contains certain "forward-looking information" and "forward-looking statements" within the meaning of Canadian securities legislation and within the meaning of Section 27A of the United States Securities Act of 1933, as amended, Section 21E of the United States Exchange Act of 1934, as amended, the United States Private Securities Litigation Reform Act of 1995, or in releases made by the
This news release has been prepared in accordance with Canadian standards for the reporting of mineral resource and mineral reserve estimates, which differ from the previous and current standards of
For
As a result of the adoption of the SEC Modernization Rules, the
Appendix: Drill Results
Table 1: Camino Rojo Near Mine Composite Drill Results
HOLE-ID | From | To | Core Length | True Width | Au g/t | Ag g/t | Au GXM | Au GXM | Including | Including | Ox / Sx |
CRSX22-07 | 439.80 | 441.30 | 1.50 | 1.01 | 1.32 | 39.3 | 1.98 | 1.33 | SX | ||
CRSX22-07 | 454.80 | 456.30 | 1.50 | 1.01 | 3.47 | 49.0 | 5.21 | 3.51 | 1.5m @ 3.47g/t Au | SX | |
CRSX22-07 | 465.30 | 544.80 | 79.50 | 53.59 | 1.46 | 5.5 | 115.85 | 78.09 | 15m @ 2.77g/t Au | SX | |
CRSX22-07 | 556.80 | 561.30 | 4.50 | 3.04 | 1.55 | 4.3 | 6.97 | 4.71 | SX | ||
CRSX22-07 | 567.30 | 607.80 | 40.50 | 27.35 | 1.40 | 4.0 | 56.54 | 38.19 | 1.5m @ 5.12g/t Au | SX | |
CRSX22-07 | 619.80 | 627.30 | 7.50 | 5.09 | 1.82 | 1.4 | 13.62 | 9.25 | 1.5m @ 5.67g/t Au | SX | |
CRSX22-07 | 646.80 | 648.30 | 1.50 | 1.02 | 2.29 | 8.4 | 3.44 | 2.33 | 1.5m @ 2.29g/t Au | SX | |
CRSX22-07 | 663.30 | 664.80 | 1.50 | 1.02 | 1.16 | 6.5 | 1.74 | 1.18 | SX | ||
CRSX22-07 | 673.50 | 675.00 | 1.50 | 1.02 | 1.19 | 7.5 | 1.78 | 1.20 | SX | ||
CRSX22-07 | 681.00 | 682.50 | 1.50 | 1.01 | 1.55 | 5.2 | 2.33 | 1.57 | SX | ||
CRSX22-07 | 685.50 | 687.00 | 1.50 | 1.01 | 1.20 | 37.5 | 1.79 | 1.21 | SX | ||
CRSX22-07 | 777.60 | 800.50 | 22.90 | 15.43 | 4.02 | 12.2 | 92.03 | 62.01 | 6.05m @ 9.3g/t Au | 0.6m @ 56.7g/t Au | SX |
CRSX22-07 | 807.00 | 808.50 | 1.50 | 1.01 | 1.28 | 1.0 | 1.92 | 1.29 | |||
CRSX22-07 | 813.00 | 814.50 | 1.50 | 1.00 | 1.37 | 11.0 | 2.05 | 1.37 | |||
CRSX22-07 | 819.00 | 820.50 | 1.50 | 1.00 | 1.46 | 9.1 | 2.18 | 1.46 | |||
CRSX22-07 | 831.00 | 834.00 | 3.00 | 2.00 | 1.32 | 2.4 | 3.97 | 2.65 | |||
CRSX22-07 | 888.00 | 890.20 | 2.20 | 1.46 | 2.86 | 8.2 | 6.29 | 4.17 | 1m @ 4.9g/t Au | ||
CRSX22-07C | 295.90 | 297.40 | 1.50 | 1.02 | 1.52 | 5.5 | 2.28 | 1.56 | SX | ||
CRSX22-07C | 304.90 | 306.40 | 1.50 | 1.02 | 1.08 | 1.5 | 1.61 | 1.10 | SX | ||
CRSX22-07C | 307.90 | 316.50 | 8.60 | 5.87 | 1.01 | 8.3 | 8.70 | 5.93 | 1.8m @ 2.02g/t Au | SX | |
CRSX22-07C | 338.35 | 340.15 | 1.80 | 1.23 | 1.16 | 5.4 | 2.09 | 1.43 | SX | ||
CRSX22-07C | 435.80 | 441.60 | 5.80 | 4.52 | 2.03 | 48.3 | 11.76 | 9.15 | 4.3m @ 2.29g/t Au | SX | |
CRSX22-07C | 455.10 | 477.60 | 22.50 | 17.39 | 2.64 | 11.3 | 59.39 | 45.91 | 12m @ 4.37g/t Au | 1.5m @ 12.85g/t Au | SX |
CRSX22-07C | 496.90 | 525.40 | 28.50 | 21.99 | 1.62 | 8.1 | 46.30 | 35.72 | 15m @ 2.11g/t Au | SX | |
CRSX22-07C | 534.40 | 535.90 | 1.50 | 1.16 | 1.54 | 6.9 | 2.31 | 1.78 | SX | ||
CRSX22-07C | 540.40 | 541.90 | 1.50 | 1.16 | 1.18 | 2.3 | 1.77 | 1.37 | SX | ||
CRSX22-07C | 559.90 | 562.90 | 3.00 | 2.31 | 3.20 | 4.3 | 9.59 | 7.39 | 1.5m @ 4.6g/t Au | SX | |
CRSX22-07C | 569.70 | 572.50 | 2.80 | 2.15 | 4.55 | 20.1 | 12.74 | 9.79 | 2.8m @ 4.55g/t Au | SX | |
CRSX22-07C | 580.00 | 585.00 | 5.00 | 3.83 | 1.62 | 6.3 | 8.08 | 6.19 | 1.5m @ 3.21g/t Au | SX | |
CRSX22-07C | 610.00 | 614.05 | 4.05 | 3.12 | 1.61 | 1.3 | 6.54 | 5.03 | 1.5m @ 3.19g/t Au | SX | |
CRSX22-07C | 636.15 | 637.65 | 1.50 | 1.15 | 1.22 | 19.5 | 1.82 | 1.40 | SX | ||
CRSX22-07C | 645.15 | 664.50 | 19.35 | 14.85 | 2.23 | 21.8 | 43.20 | 33.15 | 1.5m @ 9.87g/t Au | SX | |
CRSX22-07C | 673.50 | 675.00 | 1.50 | 1.15 | 2.54 | 25.2 | 3.81 | 2.92 | 1.5m @ 2.54g/t Au | SX | |
CRSX22-07C | 760.50 | 763.50 | 3.00 | 2.34 | 1.11 | 8.8 | 3.34 | 2.60 | SX | ||
CRSX22-07C | 771.00 | 772.70 | 1.70 | 1.33 | 3.55 | 12.4 | 6.04 | 4.71 | 1.7m @ 3.55g/t Au | SX | |
CRSX22-08 | 523.00 | 524.50 | 1.50 | 1.40 | 1.99 | 7.6 | 2.99 | 2.79 | SX | ||
CRSX22-08 | 542.50 | 544.00 | 1.50 | 1.40 | 1.17 | 1.0 | 1.76 | 1.64 | SX | ||
CRSX22-08 | 564.50 | 605.50 | 41.00 | 38.26 | 1.83 | 7.7 | 75.16 | 70.14 | 0.9m @ 9.3g/t Au | SX | |
CRSX22-08 | 612.50 | 641.00 | 28.50 | 26.52 | 2.81 | 9.5 | 80.07 | 74.51 | 6m @ 4.35g/t Au | 1.5m @ 13.5g/t Au | 612.5 - 619.3 SX |
CRSX22-08 | 648.60 | 657.50 | 8.90 | 8.27 | 2.53 | 6.4 | 22.55 | 20.95 | 0.6m @ 29.3g/t Au | 0.6m @ 29.3g/t Au | SX |
CRSX22-08 | 665.00 | 673.60 | 8.60 | 7.98 | 2.02 | 22.7 | 17.35 | 16.10 | 3.05m @ 3.93g/t Au | SX | |
CRSX22-08 | 849.00 | 850.50 | 1.50 | 1.01 | 1.72 | 2.3 | 2.58 | 1.74 | SX | ||
CRSX22-08 | 879.00 | 880.50 | 1.50 | 1.00 | 1.25 | 15.2 | 1.87 | 1.25 | 879 - 879.3 FR | ||
CRSX22-08 | 910.50 | 914.00 | 3.50 | 2.35 | 1.76 | 1.8 | 6.15 | 4.13 | 0.5m @ 7.33g/t Au | SX | |
CRSX22-08B | 495.50 | 497.00 | 1.50 | 1.50 | 1.07 | 9.1 | 1.61 | 1.60 | SX | ||
CRSX22-08B | 519.00 | 520.70 | 1.70 | 1.70 | 1.14 | 40.9 | 1.93 | 1.93 | SX | ||
CRSX22-08B | 545.50 | 557.30 | 11.80 | 11.77 | 2.07 | 10.9 | 24.47 | 24.40 | 2m @ 9.27g/t Au | 0.5m @ 29.5g/t Au | 545.5 - 546.7 SX |
CRSX22-08B | 568.50 | 605.45 | 36.95 | 36.83 | 3.78 | 14.7 | 139.68 | 139.22 | 35.75m @ 3.86g/t Au | 1.5m @ 21.7g/t Au | 568.5 - 578.75 TRSX |
CRSX22-08B | 611.50 | 645.50 | 34.00 | 33.87 | 2.70 | 4.5 | 91.83 | 91.47 | 1.5m @ 9.88g/t Au | 1.4m @ 21g/t Au | 611.5 - 619.2 TROL |
CRSX22-08B | 651.60 | 668.00 | 16.40 | 16.33 | 1.85 | 4.9 | 30.40 | 30.26 | 10.4m @ 2.54g/t Au | 651.6 - 651.7 SX | |
CRSX22-08B | 693.00 | 698.00 | 5.00 | 4.38 | 1.20 | 0.7 | 6.00 | 5.25 | TRSX | ||
CRSX22-08B | 734.50 | 751.50 | 17.00 | 14.93 | 1.05 | 3.8 | 17.80 | 15.64 | 1.3m @ 2.75g/t Au | 734.5 - 736.7 TROL | |
CRSX22-08B | 756.00 | 757.50 | 1.50 | 1.32 | 1.23 | 12.7 | 1.85 | 1.62 | TRSX | ||
CRSX22-08B | 772.00 | 777.70 | 5.70 | 4.99 | 1.75 | 11.8 | 10.00 | 8.76 | 1m @ 3.86g/t Au | TRSX | |
CRSX22-08B | 785.00 | 786.50 | 1.50 | 1.31 | 2.06 | 17.0 | 3.09 | 2.70 | 1.5m @ 2.06g/t Au | TRSX | |
CRSX22-08B | 806.00 | 830.60 | 24.60 | 21.49 | 1.28 | 9.6 | 31.44 | 27.46 | 4.5m @ 3.01g/t Au | SX | |
CRSX22-08B | 858.80 | 876.00 | 17.20 | 14.97 | 1.33 | 17.8 | 22.87 | 19.90 | 1.5m @ 4.92g/t Au | SX | |
CRSX22-08C | 534.00 | 535.50 | 1.50 | 1.48 | 4.03 | 3.8 | 6.05 | 5.97 | 1.5m @ 4.03g/t Au | SX | |
CRSX22-08C | 550.00 | 559.50 | 9.50 | 9.37 | 2.64 | 8.6 | 25.12 | 24.78 | 9.5m @ 2.64g/t Au | SX | |
CRSX22-08C | 568.50 | 585.00 | 16.50 | 16.26 | 2.32 | 19.3 | 38.34 | 37.79 | 1.5m @ 6.3g/t Au | SX | |
CRSX22-08C | 593.00 | 663.00 | 70.00 | 68.90 | 2.81 | 9.1 | 196.45 | 193.35 | 70m @ 2.81g/t Au | 1.5m @ 11.55g/t Au | 593 - 595.6 TRSX |
CRSX22-08C | 673.50 | 679.50 | 6.00 | 4.94 | 2.88 | 4.2 | 17.29 | 14.25 | 4.5m @ 3.35g/t Au | SX | |
CRSX22-08C | 690.00 | 702.00 | 12.00 | 9.91 | 1.32 | 2.0 | 15.79 | 13.03 | 1.5m @ 3g/t Au | TRSX | |
CRSX22-08C | 715.00 | 723.00 | 8.00 | 6.61 | 1.21 | 5.7 | 9.69 | 8.01 | 0.85m @ 4.13g/t Au | 715 - 720.35 TRSX | |
CRSX22-08C | 730.50 | 740.50 | 10.00 | 8.27 | 1.11 | 3.8 | 11.10 | 9.17 | 1.5m @ 2.88g/t Au | 730.5 - 736.05 SX | |
CRSX22-08C | 784.00 | 785.50 | 1.50 | 1.25 | 1.94 | 11.7 | 2.90 | 2.41 | SX | ||
CRSX22-08C | 800.50 | 802.00 | 1.50 | 1.25 | 4.42 | 40.8 | 6.63 | 5.51 | 1.5m @ 4.42g/t Au | SX | |
CRSX22-08C | 849.95 | 852.00 | 2.05 | 1.70 | 2.14 | 10.0 | 4.39 | 3.65 | 2.05m @ 2.14g/t Au | SX | |
CRSX22-08C | 858.40 | 867.50 | 9.10 | 7.56 | 2.50 | 8.2 | 22.73 | 18.89 | 7.6m @ 2.79g/t Au | SX | |
CRSX22-08C | 876.50 | 878.00 | 1.50 | 1.25 | 2.07 | 1.8 | 3.11 | 2.58 | 1.5m @ 2.07g/t Au | SX | |
CRSX22-08C | 885.00 | 886.50 | 1.50 | 1.25 | 2.35 | 11.9 | 3.53 | 2.93 | SX | ||
CRSX22-08C | 908.50 | 927.85 | 19.35 | 16.08 | 1.81 | 9.2 | 34.96 | 29.06 | 9m @ 2.51g/t Au | SX | |
CRSX22-09 | 489.50 | 491.00 | 1.50 | 1.34 | 2.23 | 5.3 | 3.35 | 3.00 | 1.5m @ 2.23g/t Au | SX | |
CRSX22-09 | 522.00 | 538.00 | 16.00 | 13.15 | 6.94 | 36.5 | 111.10 | 91.30 | 14.5m @ 7.48g/t Au | 1.5m @ 17.7g/t Au | SX |
CRSX22-09 | 547.00 | 587.50 | 40.50 | 36.23 | 3.83 | 12.1 | 154.96 | 138.63 | 7.5m @ 6.74g/t Au | 1.5m @ 26.4g/t Au | 547 - 567.7 TRSX |
CRSX22-09 | 595.50 | 606.00 | 10.50 | 9.39 | 1.08 | 4.4 | 11.39 | 10.18 | 1.5m @ 2.88g/t Au | SX | |
CRSX22-09 | 609.00 | 631.00 | 22.00 | 18.09 | 1.01 | 1.5 | 22.32 | 18.35 | 1.5m @ 3.33g/t Au | SX | |
CRSX22-09 | 656.50 | 671.00 | 14.50 | 12.95 | 1.90 | 4.2 | 27.53 | 24.59 | 7m @ 3.17g/t Au | SX | |
CRSX22-09 | 678.50 | 679.50 | 1.00 | 0.89 | 1.85 | 0.7 | 1.85 | 1.65 | SX | ||
CRSX22-09A | 467.40 | 468.40 | 1.00 | 0.99 | 5.78 | 16.6 | 5.78 | 5.70 | 1m @ 5.78g/t Au | FR | |
CRSX22-09A | 482.00 | 485.00 | 3.00 | 2.96 | 1.08 | 20.2 | 3.23 | 3.18 | 482 - 482.6 FR | ||
CRSX22-09A | 492.50 | 571.50 | 79.00 | 77.87 | 2.76 | 9.3 | 218.25 | 215.14 | 55m @ 3.22g/t Au | 1.5m @ 10.1g/t Au | SX |
CRSX22-09A | 579.00 | 591.00 | 12.00 | 11.81 | 1.32 | 3.5 | 15.86 | 15.61 | 4.5m @ 2.3g/t Au | SX | |
CRSX22-09A | 600.00 | 605.50 | 5.50 | 5.41 | 2.53 | 5.2 | 13.91 | 13.69 | 1.5m @ 6.31g/t Au | SX | |
CRSX22-09A | 612.50 | 614.00 | 1.50 | 1.48 | 3.18 | 3.5 | 4.77 | 4.69 | 1.5m @ 3.18g/t Au | SX | |
CRSX22-09A | 620.50 | 624.50 | 4.00 | 3.94 | 1.37 | 5.2 | 5.46 | 5.38 | 620.5 - 621.6 SX | ||
CRSX22-09A | 629.70 | 631.00 | 1.30 | 1.07 | 2.32 | 2.7 | 3.02 | 2.48 | 1.3m @ 2.32g/t Au | OX | |
CRSX22-09A | 648.00 | 656.50 | 8.50 | 6.99 | 1.22 | 5.8 | 10.40 | 8.55 | 2.5m @ 2.94g/t Au | 648 - 651.5 TRSX | |
CRSX22-09A | 671.50 | 682.00 | 10.50 | 8.64 | 1.19 | 2.9 | 12.47 | 10.27 | 1.5m @ 4.37g/t Au | SX | |
CRSX22-09A | 695.50 | 748.00 | 52.50 | 43.22 | 1.16 | 8.9 | 60.98 | 50.19 | 1.5m @ 4.39g/t Au | 695.5 - 722 SX | |
CRSX22-09A | 760.40 | 801.50 | 41.10 | 34.04 | 1.93 | 15.1 | 79.14 | 65.55 | 3m @ 3.31g/t Au | 1.05m @ 25.6g/t Au | SX |
CRSX22-09B | 460.50 | 462.00 | 1.50 | 1.43 | 1.40 | 15.8 | 2.09 | 2.00 | SX | ||
CRSX22-09B | 481.50 | 483.00 | 1.50 | 1.44 | 2.13 | 24.7 | 3.20 | 3.06 | 1.5m @ 2.13g/t Au | SX | |
CRSX22-09B | 499.50 | 563.45 | 63.95 | 61.07 | 4.66 | 17.2 | 298.22 | 284.78 | 57.55m @ 5.08g/t Au | 0.85m @ 10g/t Au | 499.5 - 533.85 SX |
CRSX22-09B | 571.00 | 592.20 | 21.20 | 20.21 | 2.43 | 7.2 | 51.55 | 49.14 | 18.2m @ 2.64g/t Au | 571 - 582.1 TRSX | |
CRSX22-09B | 600.00 | 615.50 | 15.50 | 14.78 | 1.26 | 1.7 | 19.50 | 18.59 | 1.5m @ 2.07g/t Au | 0.6m @ 11.9g/t Au | 600 - 606.35 |
CRSX22-09B | 646.65 | 652.75 | 6.10 | 4.49 | 3.05 | 7.9 | 18.61 | 13.70 | 4.05m @ 4.01g/t Au | 0.8m @ 15.05g/t Au | SX |
CRSX22-09B | 659.80 | 660.50 | 0.70 | 0.51 | 8.04 | 8.3 | 5.63 | 4.14 | 0.7m @ 8.04g/t Au | SX | |
CRSX22-09B | 671.00 | 684.50 | 13.50 | 9.91 | 1.21 | 3.5 | 16.34 | 11.99 | 3m @ 2.51g/t Au | 671 - 671.1 SX | |
CRSX22-09B | 708.50 | 730.90 | 22.40 | 16.37 | 1.18 | 7.9 | 26.40 | 19.30 | 0.7m @ 8.8g/t Au | ||
CRSX22-09B | 747.70 | 749.20 | 1.50 | 1.09 | 1.68 | 23.4 | 2.51 | 1.83 | |||
CRSX22-10 | 368.00 | 369.00 | 1.00 | 0.81 | 1.64 | 4.4 | 1.64 | 1.32 | FR | ||
CRSX22-10 | 370.50 | 372.00 | 1.50 | 1.21 | 1.26 | 12.2 | 1.88 | 1.52 | FR | ||
CRSX22-10 | 418.50 | 420.00 | 1.50 | 1.21 | 1.10 | 3.4 | 1.65 | 1.33 | SX | ||
CRSX22-10 | 456.00 | 462.00 | 6.00 | 4.82 | 2.09 | 26.3 | 12.55 | 10.08 | 1.5m @ 5.54g/t Au | SX | |
CRSX22-10 | 483.00 | 484.50 | 1.50 | 1.20 | 1.19 | 6.4 | 1.78 | 1.43 | SX | ||
CRSX22-10 | 491.00 | 501.50 | 10.50 | 8.43 | 3.93 | 14.3 | 41.29 | 33.15 | 4.5m @ 8.48g/t Au | 1.5m @ 18.8g/t Au | SX |
CRSX22-10 | 515.00 | 524.00 | 9.00 | 7.22 | 1.26 | 10.5 | 11.32 | 9.09 | 1.5m @ 3.47g/t Au | SX | |
CRSX22-10 | 531.50 | 581.00 | 49.50 | 39.70 | 2.71 | 6.6 | 134.37 | 107.77 | 1.5m @ 2.86g/t Au | 1.5m @ 22.7g/t Au | SX |
CRSX22-10 | 588.50 | 603.50 | 15.00 | 12.02 | 1.20 | 5.2 | 18.00 | 14.42 | 1.5m @ 2.32g/t Au | SX | |
CRSX22-10 | 618.50 | 620.00 | 1.50 | 1.20 | 10.30 | 7.1 | 15.45 | 12.38 | 1.5m @ 10.3g/t Au | 1.5m @ 10.3g/t Au | SX |
CRSX22-10 | 626.60 | 641.50 | 14.90 | 11.93 | 5.31 | 14.9 | 79.19 | 63.38 | 8.9m @ 8.34g/t Au | 1.4m @ 12.15g/t Au | SX |
CRSX22-10 | 652.00 | 655.00 | 3.00 | 2.40 | 1.97 | 4.1 | 5.92 | 4.73 | 1.5m @ 2.46g/t Au | SX | |
CRSX22-10 | 664.00 | 703.00 | 39.00 | 31.05 | 1.29 | 9.2 | 50.39 | 40.12 | 6m @ 2.43g/t Au | SX | |
CRSX22-10 | 712.00 | 715.30 | 3.30 | 2.62 | 3.32 | 35.0 | 10.95 | 8.70 | 1.8m @ 4.9g/t Au | SX | |
CRSX22-10 | 725.50 | 732.50 | 7.00 | 5.56 | 1.86 | 20.4 | 13.03 | 10.34 | 5.5m @ 2.08g/t Au | SX | |
CRSX22-10 | 739.50 | 741.00 | 1.50 | 1.19 | 1.89 | 14.9 | 2.84 | 2.25 | SX | ||
CRSX22-10 | 747.00 | 748.50 | 1.50 | 1.19 | 1.32 | 8.2 | 1.98 | 1.57 | SX | ||
CRSX22-10 | 762.00 | 763.50 | 1.50 | 1.19 | 4.57 | 26.1 | 6.86 | 5.44 | 1.5m @ 4.57g/t Au | SX | |
CRSX22-10 | 775.50 | 777.00 | 1.50 | 1.22 | 1.09 | 10.7 | 1.64 | 1.32 | SX | ||
CRSX22-10A | 456.50 | 459.50 | 3.00 | 2.72 | 1.87 | 12.3 | 5.61 | 5.09 | 1.5m @ 2.65g/t Au | SX | |
CRSX22-10A | 468.50 | 470.00 | 1.50 | 1.36 | 2.00 | 13.4 | 3.00 | 2.72 | 1.5m @ 2g/t Au | SX | |
CRSX22-10A | 492.50 | 506.00 | 13.50 | 12.23 | 3.10 | 33.8 | 41.84 | 37.89 | 10.5m @ 3.55g/t Au | SX | |
CRSX22-10A | 524.00 | 545.00 | 21.00 | 18.96 | 3.13 | 6.8 | 65.71 | 59.33 | 10.5m @ 5.66g/t Au | 1.5m @ 24g/t Au | SX |
CRSX22-10A | 555.50 | 642.50 | 87.00 | 78.32 | 1.92 | 7.8 | 167.35 | 150.65 | 1.5m @ 3.07g/t Au | 1.5m @ 10.5g/t Au | SX |
CRSX22-10A | 657.50 | 665.00 | 7.50 | 6.73 | 2.53 | 21.9 | 18.98 | 17.04 | 1.5m @ 8.87g/t Au | SX | |
CRSX22-10A | 678.50 | 680.00 | 1.50 | 1.35 | 1.83 | 22.9 | 2.75 | 2.46 | SX | ||
CRSX22-10A | 689.00 | 762.50 | 73.50 | 65.86 | 1.74 | 10.6 | 127.80 | 114.52 | 4.5m @ 2.08g/t Au | SX | |
CRSX22-10A | 774.50 | 780.50 | 6.00 | 5.36 | 5.61 | 16.4 | 33.68 | 30.11 | 4.5m @ 6.85g/t Au | 1.5m @ 11.95g/t Au | SX |
CRSX22-10A | 788.00 | 789.00 | 1.00 | 0.90 | 1.61 | 13.8 | 1.61 | 1.45 | SX | ||
CRSX22-10B | 464.50 | 466.00 | 1.50 | 1.38 | 1.24 | 45.8 | 1.85 | 1.71 | SX | ||
CRSX22-10B | 487.50 | 489.00 | 1.50 | 1.38 | 4.93 | 68.6 | 7.40 | 6.81 | 1.5m @ 4.93g/t Au | SX | |
CRSX22-10B | 496.50 | 504.00 | 7.50 | 6.91 | 3.29 | 23.6 | 24.69 | 22.75 | 3m @ 6.58g/t Au | SX | |
CRSX22-10B | 516.00 | 517.50 | 1.50 | 1.38 | 12.20 | 95.1 | 18.30 | 16.86 | 1.5m @ 12.2g/t Au | 1.5m @ 12.2g/t Au | SX |
CRSX22-10B | 526.50 | 573.00 | 46.50 | 42.32 | 1.46 | 4.6 | 67.82 | 61.73 | 1.5m @ 2.15g/t Au | SX | |
Criteria: Cut off grade 1g/t Au, minimum length 1.5m, maximum consecutive internal waste 6m, if Au grade x length > 1.5 the composite will be added |
Table 2: Camino Rojo Oxide Pit Composite Drill Results
HOLE-ID | From | To | Core Length | Au g/t | Ag g/t | Au GXM | Including | Including | Including |
CROX22-01 | 21.50 | 71.50 | 50.00 | 0.99 | 11.5 | 49.48 | 1.5m @ 1g/t Au | 1.5m @ 1.58g/t Au | 1.6m @ 2.93g/t Au |
CROX22-01 | 79.00 | 84.40 | 5.40 | 1.31 | 4.3 | 7.07 | 5.4m @ 1.31g/t Au | 1.5m @ 4.1g/t Au | 1.5m @ 4.1g/t Au |
CROX22-01 | 98.70 | 133.50 | 34.80 | 0.42 | 13.3 | 14.63 | 1.3m @ 0.64g/t Au | 1.5m @ 2.34g/t Au | 1.5m @ 2.34g/t Au |
CROX22-01 | 144.50 | 281.00 | 136.50 | 1.10 | 17.5 | 149.55 | 1.5m @ 0.62g/t Au | 5.5m @ 1.6g/t Au | 1.4m @ 3.11g/t Au |
CROX22-02 | 0.00 | 290.00 | 290.00 | 0.70 | 10.6 | 203.01 | 3.6m @ 0.54g/t Au | 1.5m @ 1.44g/t Au | 1.5m @ 3.18g/t Au |
Criteria: Cut off grade 0.2g/t Au, minimum length 1.5m, maximum consecutive internal waste 6m |
Table 3: Camino Rojo Regional Program Composite Drill Results
HOLE-ID | From | To | Core Length | Au | Ag | Au GXM | Including | Including | |
CRED22-01 | 51.40 | 58.50 | 7.10 | 0.54 | 0.6 | 3.81 | 0.7m @ 4.12g/t Au | 0.7m @ 4.12g/t Au | 51.4 - 52.48 SX |
CRED22-01 | 74.50 | 80.00 | 5.50 | 0.39 | 0.6 | 2.13 | 1.5m @ 1.02g/t Au | 1.5m @ 1.02g/t Au | SX |
CRED22-01 | 104.95 | 107.30 | 2.35 | 1.35 | 1.1 | 3.17 | 0.8m @ 3.83g/t Au | 0.5m @ 5.59g/t Au | 104.95 - 105 OX |
CRED22-01 | 116.90 | 122.55 | 5.65 | 0.24 | 1.3 | 1.38 | 0.6m @ 1.42g/t Au | 116.9 - 120.73 SX | |
CRED22-01 | 137.50 | 140.50 | 3.00 | 0.44 | 0.3 | 1.32 | 1.5m @ 0.62g/t Au | SX | |
CRED22-01 | 151.90 | 156.20 | 4.30 | 0.20 | 0.3 | 0.87 | SX | ||
CRED22-01 | 169.95 | 179.00 | 9.05 | 0.32 | 0.6 | 2.91 | 1.7m @ 1.43g/t Au | 1.7m @ 1.43g/t Au | SX |
CRED22-01 | 279.50 | 297.00 | 17.50 | 0.11 | 1.8 | 1.95 | SX | ||
CRED22-01 | 398.30 | 399.50 | 1.20 | 2.17 | 0.8 | 2.60 | 1.2m @ 2.17g/t Au | 1.2m @ 2.17g/t Au | SX |
CRED22-01 | 571.50 | 573.00 | 1.50 | 0.63 | 0.6 | 0.95 | 1.5m @ 0.63g/t Au | SX | |
Criteria: Cut off grade 0.1g/t Au, minimum length 1.5m, maximum consecutive internal waste 6m. |
Table 4: Camino Rojo Drill Hole Collars
Drillhole | Easting | Northing | Elevation | Azimuth | Dip | Depth (m) |
CRSX22-07 | 243658 | 2676063 | 1953 | 152 | -74 | 1001 |
CRSX22-07C | 243658 | 2676063 | 1953 | 152 | -65 | 779 |
CRSX22-08 | 243680 | 2676269 | 1954 | 148 | -73 | 922 |
CRSX22-08B | 243680 | 2676269 | 1954 | 148 | -73 | 881 |
CRSX22-08C | 243680 | 2676269 | 1954 | 148 | -73 | 929 |
CRSX22-09 | 243677 | 2676170 | 1951 | 152 | -75 | 691 |
CRSX22-09A | 243677 | 2676170 | 1951 | 151 | -58 | 802 |
CRSX22-09B | 243677 | 2676170 | 1951 | 150 | -76 | 760 |
CRSX22-10 | 243599 | 2676109 | 1954 | 160 | -60 | 785 |
CRSX22-10A | 243599 | 2676109 | 1954 | 159 | -61 | 790 |
CRSX22-10B | 243599 | 2676109 | 1954 | 160 | -61 | 585 |
CROX22-01 | 244153 | 2676098 | 1920 | 145 | -56 | 282 |
CROX22-02 | 244190 | 2676120 | 1920 | 145 | -59 | 290 |
CRED22-01 | 250253 | 2680276 | 1930 | 180 | -65 | 600 |
___________________________________________ |
1 All metres reported above are down-hole intervals, with true width estimates ranging from 66-100% of the reported interval. See Table 1 for estimated true widths of individual composites. All assays were performed on 1.5 metre core intervals and all drill core is HQ in diameter in size. The reported composites were not subject to "capping", however a preliminary analysis suggests that only 6 out of 2,910 samples exceeded the potential capping level of 27.0 g/t - these samples averaged 42.2 g/t gold (max. 73.6 g/t) and Orla believes that applying a top cut would have a negligible effect on overall grades. Composites for the sulphide drilling were calculated using 1 g/t Au cut-off grade and maximum 6 metres consecutive waste. |
2 Additional information can be found in the Camino Rojo Technical Report entitled "Unconstrained Feasibility Study NI 43-101 Technical Report on the |
3 Composites for the oxide drilling were calculated using 0.2 g/t Au cut-off grade and maximum 6 metres consecutive waste. |
4 Drill results presented are historical in nature. Such results were completed by |
SOURCE
© Canada Newswire, source