ERG COMPANY OVERVIEW
Italian Infrastructure Day
7 September 2023
DISCLAIMER
This document contains certain forward-looking information that is subject to a number of factors that may influence the accuracy of the statements and the projections upon which the statements are based. There can be no assurance that the projections or forecasts will ultimately prove to be accurate; accordingly, the Company makes no representation or warranty as to the accuracy of such information or the likelihood that the Company will perform as projected.
AGENDA
- ERG Today
- Recent Developments, 2Q 2023 Results and 2023 Guidance
- Abstract of ERG's updated 2022-2026 Business Plan
- Management Profiles
ERG TODAY
A LONG HISTORY… | starts up about 230MW | ||||||||||||||||||||||
Wind: ERG acquires | |||||||||||||||||||||||
172MW in Italy, and | |||||||||||||||||||||||
ERG Power's | ERG enters the | ERG enters the | among France, Poland, | ||||||||||||||||||||
solar power sector | |||||||||||||||||||||||
solar sector | U.K. and Sweden. | ||||||||||||||||||||||
combined cycle | (30 photovoltaic | ||||||||||||||||||||||
in Germany: | At the end of 2022 | ||||||||||||||||||||||
power plant (480MW) | plants acquired, | ||||||||||||||||||||||
fuelled by natural gas | 89MW in operation). | co-development | installed wind power | ||||||||||||||||||||
agreement with | totals 2,599MW. | ||||||||||||||||||||||
Production | enters operation. | ERG transfers the | |||||||||||||||||||||
AREAM (600MW). | |||||||||||||||||||||||
commences at the | ISAB Energy plant | ||||||||||||||||||||||
San Quirico Refinery | and the fuel network | ||||||||||||||||||||||
in Genoa. | of ERG Oil Sicily. | ||||||||||||||||||||||
ERG enters the | |||||||||||||||||||||||
wind market in the | |||||||||||||||||||||||
United Kingdom | |||||||||||||||||||||||
ERG enters | with a 47.5MW project. | At the end of 2018, | PV capacity at year-end | ||||||||||||||||||||
At the end of 2016, | |||||||||||||||||||||||
The ERG share | the renewables sector | TotalERG | installed wind power | amounts to 370MW, | |||||||||||||||||||
installed wind capacity | |||||||||||||||||||||||
with the acquisition | is established, | totals 1,822MW. | Installed wind power | after acquisitions of | |||||||||||||||||||
is listed on the | is 1,720MW. | ||||||||||||||||||||||
of EnerTAD. | a joint venture for the | Definitive exit from Oil | at the end of 2020 | 34MW in Italy and | |||||||||||||||||||
Stock Exchange. | |||||||||||||||||||||||
sale of oil products. | with the sale of TotalERG. | totals 1,967MW. | 25MW in Spain(3). | ||||||||||||||||||||
1947 | 1997 | 2006 | 2010 | 2014 | 2016 | 2018 | 2020 | 2022 | |||||||||||||||
1975 | 2000 | 2017 | 2019 | 2021 | |||||||||||||||||||
1938 | 2008 | 2013 | 2015 | ||||||||||||||||||||
Edoardo Garrone | ERG - through ISAB | ERG becomes the leading | ERG enters the | ERG closes | Wind: ERG enters the | ||||||||||||||||||
founds ERG in Genoa. | Energy - starts to | wind operator in Italy | hydroelectric sector | the acquisition of | Sweden market, and starts | ||||||||||||||||||
produce and sell | with an installed capacity | with plants in Umbria, | Andromeda (51MW) | operation in U.K.. At year- | |||||||||||||||||||
electricity from the | of 1,087MW and among | the Marches and Lazio | assets, increasing | end installed wind capacity | |||||||||||||||||||
gasification of the | the top ten in Europe | (527MW). | its PV total capacity | in Europe is 2,198MW. | |||||||||||||||||||
heavy residues from | (with a total of 1,340MW), | up to 141MW. | On August 2, ERG signs an | ||||||||||||||||||||
refinement. | and acquires a company for | agreement with ENEL for the | |||||||||||||||||||||
wind farm O&M activities. | sale of ERG Hydro S.r.l.(1). | ||||||||||||||||||||||
Production commences | ERG sells 49% of the | ERG's growth in the | |||||||||||||||||||||
at the ISAB Refinery | ISAB Refinery to | ||||||||||||||||||||||
wind sector continues: | |||||||||||||||||||||||
in Priolo. | LUKOIL. | ||||||||||||||||||||||
48MW in operation in | |||||||||||||||||||||||
Germany; 16MW in | |||||||||||||||||||||||
ERG acquires 6 wind farms | operation in France. | ||||||||||||||||||||||
in France (64MW) and | At the end of 2017, | Wind: ERG acquires | |||||||||||||||||||||
constructs 3 wind farms in | installed wind capacity | ||||||||||||||||||||||
ERG transfers the ISAB | Poland for a total of 82MW. | in Europe is 1,814MW. | 52MW in France and | ERG enters the solar | |||||||||||||||||||
Refinery and completes | At the end of 2015, | 34MW in Germany. | market in France (79MW) | ||||||||||||||||||||
At year end, installed | |||||||||||||||||||||||
its exit from refining. | installed wind capacity | and Spain (92MW)(2). | 5 | ||||||||||||||||||||
(1) The closing for the sale of the Hydro portfolio to Enel took place on January 3, 2022 | wind capacity in | ||||||||||||||||||||||
(2) The closing of the solar acquisition in Spain (92MW) took place on January 31, 2022 | is 1,506MW. | Europe is 1,929MW. | |||||||||||||||||||||
- The closing of the solar acquisition in Spain (25MW) took place on June 30, 2023