Dril-Quip, Inc. announced the successful installation of its 18 3/4" BigBore IIe wellhead system for the Petrobras Exploratory project in the Aram Block of the Santos Basin, in 2002-meter water depth. The BigBore IIe wellhead system is the newest and most advanced standard system for Dril-Quip, with sealing technology qualified to the latest Petrobras standards. The 18 3/4" Big Bore IIe system provides significant cost savings by eliminating the need for drilling or production lockdown devices, reducing the number of trips associated with drilling the well.
Real-time Estimate
Other stock markets
|
5-day change | 1st Jan Change | ||
19.33 USD | +2.44% | +2.82% | -16.93% |
05-02 | Earnings Flash (DRQ) DRIL-QUIP Reports Q1 Revenue $110.3M | MT |
05-02 | Dril-Quip, Inc. Reports Earnings Results for the First Quarter Ended March 31, 2024 | CI |
EPS Revisions
1st Jan change | Capi. | |
---|---|---|
-16.93% | 650M | |
+1.75% | 19.71B | |
+17.32% | 4.72B | |
+0.33% | 834M | |
0.00% | 753M | |
-10.00% | 686M | |
-21.09% | 338M | |
-2.24% | 319M | |
+40.24% | 286M | |
+11.94% | 286M |
- Stock Market
- Equities
- DRQ Stock
- News Dril-Quip, Inc.
- Dril-Quip, Inc. Announces Successful Installation of BigBore IIe Wellhead System for Petrobras Exploratory Project in the Santos Basin