Carolina Rush Corporation announces that a 2,000-meter core drilling campaign has commenced at its flagship Brewer Gold-Copper Project located in Chesterfield County, South Carolina. The inaugural drill holes of this program aim to expand the significant findings in drill hole #8, which yielded impressive results of 1.07 g/t Au and 0.26% Cu over a span of 106.5 meters, as well as below drill hole #5, that intercepted 1.24 g/t Au and 0.27% Cu over an interval of 181.6 meters. These initial holes plan to validate the significant mineralization encountered within the former open pit area.

In addition, company will test the promising zone south of the former pit, where hole #15 intersected 62.4 meters of 1.03 g/t Au and 0.15% Cu within a newly discovered breccia zone that remains open in all directions.