Tombstone Exploration Corporation announced in combination with Goldrock Resources Inc. and the Bonanza Mining Company the second pour from production. Production of 262.59 oz of Dore was stripped from the Bonanza’s activated carbon by Metals Research and sent to Metalor USA Refining Corp. for final disposition. This is more than a 300% increase from the 83.7 oz of Dore from the first pour announced on July 13, 2021. Reaching another milestone event with the changes that the company continue to make on the Bonanza Leach System, the company improve production as the project moves forward. The leaching commenced at the Bonanza Harquahala Mine on June 3, 2021, when pH levels increased to allow for safe sustained leaching. Approximately 35,000 tons of rock have been placed on the leach pad with the entire area under leach. Carbon has been placed in all four carbon columns and is collecting gold & silver from solution. The company continue to increase the production of gold, the Bonanza Mining Company will continue to stack and load the pad with an additional 465,000 tons of Crushed Rock.