Rio Tinto Group reported production results for the fourth quarter and full year 2020. For the quarter, Pilbara iron ore production was 86.0 mt. Bauxite production of 56.1 million tonnes was 2% higher than 2019 supported by the ramp-up of the expansion at the CBG mine in Guinea, and steady performance at the Pacific mines. Aluminium production of 3.2 million tonnes was in line with 2019, with lower volumes from the curtailment of Line 4 at the Tiwai Point aluminium smelter in New Zealand and from the Kitimat smelter pot relining campaign, offset by the ramp-up of the Becancour smelter in Quebec. For the full year, Pilbara iron ore production was 333.4 mt. Production of Bauxite was 56.1 mt, Production of Aluminium was 3,180 kt and Production of Mined Copper was 527.9 kt.