Orestone Mining Corp. announced that all contractors have been selected and retained to carry out the 2021 Phase I drill program at the Captain project. Equipment mobilization is underway with drilling estimated to start on or about April 10, 2021. The exploration model at Captain is a large scale potassic-sericite altered calc-alkaline gold-copper porphyry target. The drill program will consist of 1,000 to 2,000 meters of core drilling in 2 ­ 3 holes and is budgeted at $300,000 to $600,000 designed to follow up and test for porphyry mineralization intersected in holes C13-03 and C19-03. Hole C13-03 intersected a 3 meter sulphide rich mineralized xenolith which assayed 1.9 g/t gold, 11 g/t silver and 0.23 % copper within an otherwise unaltered and barren post mineral dyke. Hole C19-03, located 250m south of C13-03 intersected visually identical porphyry at 271m with the bottom 24m of the hole (271m ­ 295m) grading 0.27 g/t gold, 3.26 g/t silver and 0.09 % copper. The hole ended in 0.49 g/t gold, 3.0 g/t silver and 0.11 % copper at 295m and remains open to depth. Logistics for the drill program are excellent as all of the drill locations are on existing roads with easy access one hours drive north of Fort St. James in north central BC. The Captain Project features relatively flat terrain, moderate tree cover and an extensive network of logging and Forest Service roads suitable for exploration year around. All permits are in place for 24 drill locations.