New Age Metals Inc. provided an update of exploration activity at the company's River Valley PGM Deposit in Ontario. Field exploration presently is concentrated on the upcoming ground IP geophysical survey. WSP Canada is currently working on the upgraded 43-101 compliant resource calculation and mineralogical test of the different PGM grades is ongoing. The geophysical survey will be a high-resolution OreVision® IP survey performed by Abitibi Geophysics. OreVision IP can reveal targets at four times the depth of conventional IP without compromising near-surface resolution. The goal of the geophysical survey is to test the footwall portion to the main River Valley PGM Deposit, southward of the Pine Zone IP survey and to cover the area between target anomalies T4 to T9. This area represents a survey strike length of approximately 2,000 metres. The linecutting and grid is near completion and the IP crews are scheduled to mobilize on site for January 20th. Upon completion of the geophysics, the company will outline a series of drill programs to test the geophysical anomalies generated from the survey. The goal is to examine the potential for continuous PGM mineralization into the footwall area of the main River Valley PGM Deposit.