Koil Energy Solutions, Inc. announced the acquisition of a significant order for a design of steel tube flying leads of extended lengths directly from an operator. The multi-million-dollar contract encompasses the comprehensive design, engineering and manufacturing of several 1,000+ ft. flying leads tailored for a unique application in the Gulf of Mexico.

All units are slated for delivery in 2024.