TOMAGOLD CORPORATION announced that IAMGOLD Corporation commences its 2018 exploration program which will include this winter the completion of approximately 7,500 metres of diamond drilling on the Monster Lake property. The drilling program includes: definition drilling targeting the upper part of the 325-Megane zone; testing for extensions along strike and at depth; and evaluation of newly discovered areas of mineralization adjacent to the 325-Megane zone along the Monster Lake structural corridor and in the Lower Shear zone. The program is designed to improve confidence and extend the known mineralized zones. Drilling has started.