1.42 g/t gold equivalent over 33.5 meters within the vein, which includes, 3.26 g/t gold equivalent over 10.7 meters within the vein, and 0.94 g/t gold equivalent over 123.5 meters within the intrusive and contact zone in hole J-21-015
North Jumbo' Drilling result Highlights
2.60 g/t gold equivalent over 3.1 meters in hole J-21-001 and 4.46 g/t gold equivalent over 1.6 meters in hole J-21-001
'South Jumbo' Drilling Result Highlights
5.47 g/t gold equivalent over 19.8 meters in hole E-21-012; 1.70 g/t gold equivalent over 9.1 meters in hole E-21-004; 0.56 g/t gold equivalent over 16.8 meters in hole E-21-016
'Charlie Ross' Drilling result Highlights
1.17 g/t gold equivalent over 45.7 meters, which includes, 2.56 g/t gold equivalent over 15.2 meters in hole CR-21-005; 1.26 g/t gold equivalent over 15.3 meters, which includes, 2.24 g/t gold equivalent over 9.2 meters in hole CR-21-008
Gold Equivalent (AuEq) based on
About
Contact:
Email: acanton@goldspringsresource.com
Forward Looking Statements
Certain statements contained herein constitute 'forward-looking information' under applicable Canadian securities laws ('forward-looking statements'). Forward-looking statements look into the future and address events or developments that the Company expects to occur in the future, and include statements related to the completion of baseline studies and moving the permitting process forward to de-risk the project. Forward-looking statements may include words such as 'creating', 'believe', 'would', 'continue', 'will', 'promising', 'should', and similar expressions. These forward-looking statements are based on current expectations and entail various risks and uncertainties. Actual results may materially differ from expectations if known and unknown risks or uncertainties affect our business or if our estimates or assumptions prove inaccurate. Factors that could cause results or events to differ materially from current expectations expressed or implied by the forward-looking statements, include, but are not limited to, risks of the mineral exploration industry which may affect the advancement of the Gold Springs project, including possible variations in mineral resources, grade, recovery rates, metal prices, capital and operating costs, and the application of taxes; availability of sufficient financing to fund planned or further required work in a timely manner and on acceptable terms; availability of equipment and qualified personnel, failure of equipment or processes to operate as anticipated, changes in project parameters, including water requirements for operations, as plans continue to be refined; regulatory, environmental and other risks of the mining industry more fully described in the Company's Annual Information Form and continuous disclosure documents, which are available on SEDAR at www.sedar.com. The assumptions made in developing the forward-looking statements include: the accuracy of current resource estimates and the interpretation of drill, metallurgical testing and other exploration results; the continuing support for mining by local governments in
(C) 2022 Electronic News Publishing, source