Big Gold Inc. reported field sampling results from its 2022 fall work program on its expanded Martin Kenty Project ("MKP") adjacent to and partially surrounded by First Mining's Cameron Project near Kenora, Ontario. The 2022 fall work program, which included field sampling, provided technical team with important data that will help identify priority exploration targets for follow-up exploration that may include drilling. The large-scale land position now covers more than 20 km along favourable geology for gold mineralization in the highly prospective Cameron Lake gold belt in Northwest Ontario.

Prospecting and sampling were completed on small portions of the newly acquired ground, as well as areas of the original MKP property that had not been previously evaluated or sampled. The highlighted grab samples below include Sample 260905 of 8.04 grams per tonne of gold ("g/t Au") and Sample 260926 of 8.37 g/t Au. A total of 44 grab samples were taken with more than 30% returning assays of more than 0.5 g/t Au.

Grab samples by nature are not representative of overall grade or continuity of mineralization.