News listings

05 July 2017

New aerial photographs show the progress on the A14 project, the biggest road upgrade under construction in the UK. The A14 is being delivered by a four-way joint-venture comprised of Balfour Beatty, Carillion, Skanska and Costain.

Work on building the £1.5bn upgrade to the A14 between Cambridge and Huntingdon started in November last year. The project includes widening a total of seven miles of the A14 in each direction (across two sections), a major new bypass south of Huntingdon, widening a three-mile section of the A1 and demolition of a viaduct at Huntingdon, which will support improvements in the town.

Alongside the emergence of this new road, foundations and bridge columns for some of the project's 34 new bridges have been installed.

The project's earthworks team have been stripping top soil over more than 17 miles out of the project's total length of 21 miles to create several sections of the future new road including: the Huntingdon bypass, the new Swavesey junction, and the five-mile long local access road, which will link local communities between Huntingdon and Cambridge without the need to use the A14.

To find out more about the project's progress, click here.

Image: Aerial photography shows the new road emerging

ENDS

Media enquiries to:
Cassie Farrar
Balfour Beatty
t: +44 (0) 207 963 2150
e: cassie.farrar@balfourbeatty.com

For all non-media related enquiries please contact +44 (0)20 7216 6800 or info@balfourbeatty.com

Notes to editors:

Balfour Beatty (www.balfourbeatty.com) is a leading international infrastructure group. With 30,000 employees, we provide innovative and efficient infrastructure that underpins our daily lives, supports communities and enables economic growth. We finance, develop, build and maintain complex infrastructure such as transportation, power and utility systems, social and commercial buildings.

• Our main geographies are the UK, US and South East Asia. Over the last 100 years we have created iconic buildings and infrastructure all over the world including the London Olympics' Aquatic Centre, Hong Kong's first Zero Carbon building, the National Museum of the Marine Corps in the US and the Channel Tunnel Rail Link.

Balfour Beatty plc published this content on 05 July 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 05 July 2017 16:10:06 UTC.

Original documenthttps://www.balfourbeatty.com/news/balfour-beatty-joint-venture-progresses-uk-s-largest-road-upgrade/?year=all&parentId=1212

Public permalinkhttp://www.publicnow.com/view/91460804DFDA3B6E1EC3BF75A4979D9E909490AF