Aso Foam Crete Co., Ltd. Share Price

Equities

1730

JP3119990004

Construction & Engineering

Delayed Japan Exchange 07:00:00 02/05/2024 BST 5-day change 1st Jan Change
603 JPY -0.82% Intraday chart for Aso Foam Crete Co., Ltd. -3.52% -15.55%

Financials

Sales 2022 3.59B 23.45M 1.87B Sales 2023 3.57B 23.3M 1.86B Capitalization 1.37B 8.94M 713M
Net income 2022 -52M -339K -27.07M Net income 2023 -17M -111K -8.85M EV / Sales 2022 0.42 x
Net cash position 2022 16M 104K 8.33M Net cash position 2023 129M 842K 67.15M EV / Sales 2023 0.35 x
P/E ratio 2022
-29.5 x
P/E ratio 2023
-80.5 x
Employees 103
Yield 2022 *
-
Yield 2023
-
Free-Float 25.05%
More Fundamentals * Assessed data
Dynamic Chart
1 day-0.82%
1 week-3.52%
Current month-3.67%
1 month-0.66%
3 months-12.48%
6 months+43.23%
Current year-15.55%
More quotes
1 week
601.00
Extreme 601
626.00
1 month
575.00
Extreme 575
699.00
Current year
575.00
Extreme 575
947.00
1 year
393.00
Extreme 393
1 039.00
3 years
385.00
Extreme 385
1 039.00
5 years
372.00
Extreme 372
1 039.00
10 years
241.00
Extreme 241
1 441.00
More quotes
Managers TitleAgeSince
Director of Finance/CFO - -
President 64 28/02/79
Chief Administrative Officer - -
Members of the board TitleAgeSince
Director/Board Member 68 31/05/09
Director/Board Member 61 31/05/09
President 64 28/02/79
More insiders
Date Price Change Volume
02/05/24 603 -0.82% 7,100
01/05/24 608 -1.46% 7,600
30/04/24 617 +0.65% 16,700
26/04/24 613 +1.49% 6,200
25/04/24 604 -1.79% 12,300

Delayed Quote Japan Exchange, May 02, 2024 at 07:00 am

More quotes
ASO FOAM CRETE Co.,Ltd. is a Japan-based company mainly engaged in construction business. It is engaged in construction of foam concrete, ground improvement work, and sale of foaming agents and other construction materials. Aerated concrete works provide lightweight embankment work, pipe and cavity filling work. Lightweight embankment works use foamed cement banking (FCB) method and precast (PCW) method, construct embankment and rock fall protection work. Pipeline filling works provide secondary lining of shield of sewer construction with reinforced plastic composite pipe (FRPM pipe). Cavity filling works use air pack and non-air long-distance grouting method (NLG), fill tunnels and deep foundation piles, house floor and tank bottom. Ground improvement works performed by ascolumn method, steel pipe soil cement pile method (HYSC pile method), power blender method, in-situ soil treatment method, and enlargement and reduction (L&R) Geo-Fine method.
Calendar
More about the company