Wallbridge Mining Company Limited announced the remaining assay results from the five wedge cuts drilled around FA-19-086 that continue to delineate the high metal factor (grade multiplied by core length) domains in Tabasco-Cayenne shear zones. As expected, the results of the FA-19-086 wedge cuts confirm a wide shear zone with good geological continuity and highly variable gold grades. The average grade and width for the original hole and the five wedge cuts, which tested a 75 by 75 metre area surrounding the original hole at approximately 25-40 metre spacing, returned. Similar wedge drilling programs have been completed, with assays pending, to test the continuity in other high metal factor domains within the Tabasco-Cayenne shear zones. In-fill drilling to a 50-60 metre nominal spacing continues to outline the high-grade core of the Tabasco-Cayenne shear system which forms part of the larger shear corridor and has thus far been drilled over a strike length of 800 metres to a vertical depth of 1,000 metres. The high "metal factor" domain is characterized by intersections of good gold grades over significant widths, consistently measured in the tens of metres, as highlighted also by the recent intersection of 5.07 g/t Au over 100.60 metres in hole FA-20-181. In 2020, Wallbridge completed approximately 102,000 metres of exploration and resource drilling at Fenelon, achieving its 2020 target despite the temporary suspension of activities in the spring due to the COVID pandemic. For the majority of the year, six drill rigs were running and a seventh drill was mobilized to the project at the end of November. In 2021, the Company is planning to complete approximately 170,000-metres of drilling, with a maiden resource estimate at Fenelon anticipated in the third quarter. Approximately 10-15% of the drilling program will be devoted to regional exploration on the Company's district-scale, underexplored land package on the Detour-Fenelon Gold Trend. Currently, drilling is ramping up and by the end of January the Company will have nine drill rigs turning. Six drill rigs are targeting the Fenelon Gold System (Tabasco-Cayenne-Area 51 mineralization) to approximately 1,000 metre vertical depth, carrying out a combination of 75-100-metre step-outs and tighter-spaced (50-60-metre) in-fill drilling. An additional two drill rigs will be focusing on near surface, open pit resource drilling in the western portion of Area 51. One additional drill rig will be devoted to regional, grassroots exploration at various projects of the Company's Detour- Fenelon Gold Trend land package. Final assay results for four of the five wedge cuts of the 2020 exploration drill program are reported, with FA-19-086-W5 pending infill samples that were added after the initial sampling of the hole.