ASX Announcement

5 April 2022

16 March 2022

Vango's Marymia Gold Project Intersects High Grade

Gold

Results include 19m @ 4.7 g/t Au

Highlights

  • High-grade gold intersected in second-phase drilling at Parrot open-pit as part of Vango's extensive open-pit focused drilling campaign at the Marymia Gold Project

  • 8 holes drilled at the Parrot open-pit with all holes intersecting the mineralised structure and returning anomalous gold

  • Highlight results include:

    • o 19m at 4.7 g/t Au from 81m in VPARC0011 incl. 2m at 18.6 g/t Au from 96m

    • o 9m at 1 g/t Au from 119m in VPARC0007 incl. 1m at 2.3 g/t Au from 127m

    • o 11m at 0.7 g/t Au from 149m in VPARC0007 incl. 1m at 3.9 g/t Au from 156m

    • o 2m at 1.2 g/t Au from 121m in VPARC0008

  • Drilling targeted the extension of the structures defined in Phase 1 drilling which returned multiple gold intersections within a significant mineralised structure

  • Vango's drilling at Parrot demonstrates the continuation of the mineralised zones from historical drilling at the Parrot open-pit1 which include:

    • - 12m @ 2.6 g/t Au from 43m in PARC0073

    • - 2m @ 11.1 g/t Au from 99m in PBR7977

    • - 8m @ 1.6 g/t Au from 67m in PBRD1753

Vango Mining Limited (Vango, ASX: VAN) is pleased to announce further high-grade gold intersections from drilling at the Parrot open-pit target as part of its open-pit focused drilling campaign at the Company's flagship Marymia Gold Project (Marymia, the Project) in the Mid-West region of Western Australia.

The latest assay results are from eight reverse circulation (RC) holes at the Parrot open-pit as part of Vango's second-phase of drilling at priority open-pit targets. Previous Phase 1 drilling at Parrot intersected broad structures with anomalous gold of moderate grade1.The width and style of alteration made this pit area a priority for Vango's second phase of drilling.

The latest drilling was designed to further define the mineralisation at the Parrot open-pit target, and has delivered a highly positive outcome.

1 ASX: VAN, 20/10/21: "Vango Continues to Confirm Open-Pit Potential at Marymia"

Vango Mining Ltd

Issued Capital

Australian Registered Office

Directors

ABN: 68 108 737 711

1,259,937,632 Shares

Aurora Place

BRUCE MCINNES - Executive Chairman

ASX: VAN

115,864,406 Options

Building 1

SEAN ZHOU - Deputy Chairman - Non-Executive Director

Level 29, 88 Phillip Street

HUNTER GUO - Non-Executive Director

Sydney NSW 2000 AUSTRALIA

The Hon CRAIG WALLACE - Non-Executive Director

Dr CAROL ZHANG - Non-Executive Director

All eight holes intersected the mineralised structure and have confirmed the continuity of a significant gold bearing structure, with a highlight being hole VPARC0011 which returned 19m at 4.7 g/t Au from 81m including 2m at 18.6 g/t Au from 96m.

This zone demonstrates the potential for the Parrot area to produce significant gold at a potential future gold producing operation at the Marymia Project.

The most significant intercepts are summarised below:

  • 19m at 4.7 g/t Au from 81m in VPARC0011 incl. 2m at 18.6 g/t Au from 96m

  • 1m at 2.7 g/t Au from 109m in VPARC0005

  • 9m at 1 g/t Au from 119m in VPARC0007 incl. 1m at 2.3 g/t Au from 127m

  • 1m at 1 g/t Au from 132m in VPARC0007

  • 11m at 0.7 g/t Au from 149m in VPARC0007 incl. 1m at 3.9 g/t Au from 156m

  • 4m at 0.5 g/t Au from 113m in VPARC0008 incl. 1m at 1.2 g/t Au from 116m

  • 2m at 1.2 g/t Au from 121m in VPARC0008

  • 1m at 1 g/t Au from 128m in VPARC0008

  • 1m at 1.1 g/t Au from 116m in VPARC0009

  • 4m at 1 g/t Au from 109m in VPARC0010

  • 2m at 0.9 g/t Au from 142m in VPARC0012

The gold intercept in Hole VPARC0011 is of significant grade and width, and is potentially part of a larger high-grade zone, which is planned to be targeted by further drilling once the results are fully examined. Refer Figures 1 and 2.

The above results are in addition to the results from Vango's first-phase drilling at Parrot in 20211:

  • 1m @ 2.5 g/t Au from 177m in VPARC0001

  • 1m @ 1.3 g/t Au from 78m in VPARC0002

  • 1m @ 1.2 g/t Au from 84m in VPARC0002

  • 3m @ 1.3 g/t Au from 124m in VPARC0003

  • 1m @ 1.1 g/t Au from 133m in VPARC0003

Vango's two phases of drilling at Parrot have followed up historic drilling intersections including:

  • 12m @ 2.6 g/t Au from 43m in PARC0073

  • 2m @ 11.1 g/t Au from 99m in PBR7977

  • 8m @ 1.6 g/t Au from 67m in PBRD1753

Figure 1: Parrot Drill Plan - Current Drilling

Hole ID

MGA_N

MGA_E

RL

North

East

Depth

Dip

Az

Pit

VPARC0005

7205385

763343

600

5767.7

13433.5

160

-55.2

147.8

Parrot

VPARC0006

7205376

763309

600

5776.4

13399.4

160

-62.2

153.4

Parrot

VPARC0007

7205373

763216

600

5819

13316.7

160

-62.3

150.4

Parrot

VPARC0008

7205373

763219

600

5817.5

13319.4

160

-62.7

151.2

Parrot

VPARC0009

7205354

763183

600

5818.5

13278.7

166

-63.1

153.7

Parrot

VPARC0010

7205331

763174

600

5802.7

13259.6

172

-62.4

148.7

Parrot

VPARC0011

7205276

763067

600

5806.7

13139.4

173

-60.2

150.6

Parrot

VPARC0012

7205334

763058

600

5861.8

13159.8

167

-59.4

152.2

Parrot

Figure 2: Cross-section Parrot 13140mE

Table 1: 2021 Drilling Parrot and Apollo

Figure 3: Marymia Gold Project showing the 11 priority open pits.

Open-Pit Focused Drilling Campaign Progress and Next Steps

Vango targeted 11 priority open-pits in an extensive open-pit focused drilling campaign, commencing in H2, calendar 2021. Drilling was designed to add resources to the substantial existing Marymia resource base, and to assist in delivering 'critical mass' to Marymia's resource base to support a proposed stand-alone mining operation at the Project.

The first phase of drilling in all 11 open pits has been completed and consisted of 8,914 metres of RC drilling across 56 holes. All results from the first-phase campaign have been received and reported.

Vango will now conduct follow-up, second phase drilling at targets that delivered positive results from the completed first round of drilling, to test for further extensions of gold mineralisation to add to the Marymia resource base.

Second-phase drilling has already been competed at the Skyhawk and Parrot open-pits. Results from drilling at the Parrot open-pit are reported in this announcement and results from the Skyhawk open-pit were reported in ASX announcement of 25 February 2022.2

2 ASX: VAN 25/02/2022 "Vango Intersects Wide, High-Grade Gold Zones at Marymia"

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Vango Mining Limited published this content on 04 April 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 04 April 2022 23:17:02 UTC.