Clarification the progress of the deposit for investing.

To:

The President

The Stock Exchange of Thailand

The company would like to clarify the progress of the deposit payment for the right to study the feasibility of various investment projects as shown in the company's financial statements for the first quarter of 2022 , as follows:

The deposit

Type of project

The

Payment date

Maturity Date

Remark

receiver

deposit

amount

(Million

Baht)

Asia Investment,

The water

267

12 October 2018

30 June 2022

There were 5

Development &

project and

extensions, the latest

Construction

alternative

extension was on

energy power

Sole Co., Ltd.

December 31, 2021

plants

(AIDC)

which extend the

date to receive the

return of the deposit

to June 30, 2022

Please consider more

information in remark

1 below.

One company in

The aeration

20

9 July 2018

10 May 2022

The deposit has now

Thailand

turbine, solar

been refunded.

energy project

Please consider more

information in remark

2 below.

เลขที่127 อาคารเกษร ทาวเวอร์ชั้นที่28 ห้องเลขที่เอ,บี,ดี/1 ถนนราชดำริห์แขวงลุมพินีเขตปทุมวันกรุงเทพมหานคร10330

No. 127, Gaysorn Tower Building, Floor 28, Room no. A,B,D/1,

Ratchadamri Rd., Lumphini, Pathum Wan, Bangkok 10330

T e l : 0 2 - 6 7 7 - 7 1 5 1

F a x : 0 2 - 6 7 7 - 7 1 5 2

1

บริษัทยูไนเต็ด เพาเวอร์ ออฟ เอเชียจ ากัด(มหาชน)

United Power of Asia Public Company Limited

The deposit

Type of project

The

Payment date

Maturity Date

Remark

receiver

deposit

amount

(Million

Baht)

One company in

The coal-fired

99

26 August 2021

25 August 2022

On December 30,

Lao PDR

power plant

.

2021, the partial

investment deposit

was refunded and the

deposit was received

on January 25, 2022.

At present, the

remaining deposit is

99 million baht, due

on August 25, 2022.

Please consider more

information in remark

3 below.

Total

386

Remark

No.

The deposit

Details

receiver

1.

Asia Investment,

At the present, the company is studying two other AIDC projects including one dam

Development &

project without reservoirs or run of river project and one dam project with reservoir or

Construction

cascade, r.o.r, which was originally under a Memorandum of Understanding (MOU)

Sole Co., Ltd.

approved by the Board of Directors. According to the extension of the Memorandum of

(AIDC)

Understanding (MOU) dated February 11, 2022, the Board of Directors has considered and

viewed that the Company shall conduct a due diligence for each project. The Company

shall consider the availably of fund if the company decides to invest in the project

including the readiness of the working team and the status and progress of the project. In

the past, the company has developed a progress by making an investment in the projects

เลขที่127 อาคารเกษร ทาวเวอร์ชั้นที่28 ห้องเลขที่เอ,บี,ดี/1 ถนนราชดำริห์แขวงลุมพินีเขตปทุมวันกรุงเทพมหานคร10330

No. 127, Gaysorn Tower Building, Floor 28, Room no. A,B,D/1,

Ratchadamri Rd., Lumphini, Pathum Wan, Bangkok 10330

T e l : 0 2 - 6 7 7 - 7 1 5 1

F a x : 0 2 - 6 7 7 - 7 1 5 2

2

บริษัทยูไนเต็ด เพาเวอร์ ออฟ เอเชียจ ากัด(มหาชน)

United Power of Asia Public Company Limited

No.

The deposit

Details

receiver

under the Memorandum of Understanding (MOU) consistently which the company will

conduct a study of a new project after the investment in another project has been

completed. In addition, the study of the aforementioned projects is still under the

Memorandum of Understanding (MOU) period, which will expire on June 30, 2022 or there

is a change in the deposit to invest with AIDC, the Company will report the progress

accordingly.

2.

One company in

According to the company has extended the period of the Memorandum of

Thailand

Understanding (MOU) for the feasibility study of the aeration turbine, solar energy project

from January 2022 to May 10, 2022. When the MOU is due, the company still cannot

acknowledge any progress or development from the study, this is mainly due to the

continuous epidemic of Coronavirus Disease 2019 (Covid-19), therefore the company has

decided not to invest in aeration turbine, solar energy projects, on May 10, 2022, the

company received the full amount of deposit back in the amount of 20 million baht, plus

interest at a rate of 3% per annum, in the amount of 1.70 million baht, according to the

agreement in the Memorandum of Understanding (MOU).

3.

One company in

According to the Board of Directors meeting No. 11/2021 held on 29 October 2021

Lao PDR

has resolved to approve Parabolic Solar Power Company Limited, a subsidiary of

the company, to invest in totaling 80 percent of the total issued and paid-up shares

of ASIA ENERGY AND UTILITIES HOLDING (SINGAPORE) PTE. LIMITED ("AEU"). AEU has

key objective in holding 44 percent of the total issued and paid-up shares in Central

Wind Power Joint Stock Company ("CWP") which is operating the Phuong Mai 3

Wind Power Plant in Vietnam with capacity of 21 MW, located at Nhon Hoi

Economic Zone, Binh Dinh Province, Vietnam, in the total purchase price of USD 7.1

million or THB 236.05 million approximately, the payment conditions whereby the

payment will be made in 2 installments: USD 3.4 million in the completion date as

the first installment, and USD 3.7 million when the EIRR as specified by the

company. Therefore, PSP needs to spend 3.4 million US dollars or THB 111.70

million, and the company has negotiated a reduction of deposits in the coal-fired

power plant project from USD 6.4 million. Remaining deposit of USD 3 million or

THB 99 million approximately and deposit refund of USD 3.4 million on January 25,

2022.

เลขที่127 อาคารเกษร ทาวเวอร์ชั้นที่28 ห้องเลขที่เอ,บี,ดี/1 ถนนราชดำริห์แขวงลุมพินีเขตปทุมวันกรุงเทพมหานคร10330

No. 127, Gaysorn Tower Building, Floor 28, Room no. A,B,D/1,

Ratchadamri Rd., Lumphini, Pathum Wan, Bangkok 10330

T e l : 0 2 - 6 7 7 - 7 1 5 1

F a x : 0 2 - 6 7 7 - 7 1 5 2

3

บริษัทยูไนเต็ด เพาเวอร์ ออฟ เอเชียจ ากัด(มหาชน)

United Power of Asia Public Company Limited

No.

The deposit

Details

receiver

In this regard, the company continues to conduct feasibility studies of the coal-fired

power plant project continuously. Moreover, the said study is still under the

framework of a Memorandum of Understanding (MOU) which will expire on 25

August 2022 or there is a change in the deposit in any investment, the company will

continue to report on its progress.

Please be informed accordingly.

Sincerely yours,

( Mr. Wit Suwanasri )

Chief Executive Officer (Acting)

เลขที่127 อาคารเกษร ทาวเวอร์ชั้นที่28 ห้องเลขที่เอ,บี,ดี/1 ถนนราชดำริห์แขวงลุมพินีเขตปทุมวันกรุงเทพมหานคร10330

No. 127, Gaysorn Tower Building, Floor 28, Room no. A,B,D/1,

Ratchadamri Rd., Lumphini, Pathum Wan, Bangkok 10330

T e l : 0 2 - 6 7 7 - 7 1 5 1

F a x : 0 2 - 6 7 7 - 7 1 5 2

4

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

United Power of Asia pcl published this content on 25 May 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 25 May 2022 16:12:59 UTC.