Tuscany Energy Ltd. Announces Production Results for the Month of October 2014; Plans to Drill Two Horizontal Wells at its North Macklin Property
The company next plans to drill two horizontal wells in mid-November at its North Macklin property, offsetting a stratigraphic test for the Dina oil zone drilled in September 2014. The test well encountered 9 vertical metres of 33% porous sand in the Dina, with log characteristics identical to presently producing wells in the field. Based on this and subsequent geotechnical work, the company identified 14 new horizontal drill locations on this previously untested portion of its 100% owned Macklin property and will commence drilling the first two horizontal locations mid-November 2014, oriented to the NW and SE of the vertical well.