Tocvan Ventures Corp. provided an update on drilling plans for the 2024 season at the Company's road-accessible Pilar Gold-Silver Project in the mine-friendly State of Sonora, Mexico. The program will include ~10,000-meters of drilling focused on resource definition and expansion.

Drilling Objectives - 10,000-meters: Resource Infill and Expansion Drilling: Infill Drilling at Pilar Main Zone where 2022 core drilling returned: 116.9-meters of 1.2 g/t Au and 7 g/t Ag in drillhole JES-22-59; 108.6-meters of 0.8 g/t Au and 3 g/t Ag in drill hole JES-22-62; Expansion Drilling to the Southeast where past step-out drilling returned: 39.7-meters of 1.0 g/t Au and 2 g/t Ag in drill holes JES-21-50; 13.7-meters of 0.6 g/t Au and 13 g/t Ag in drillholes JES-22-63; Expansion Drilling to the north where past drilling returned: 29.0-meters of 0.7 g/t Au and 2g/t Ag in drillholeJES-21-38; 21.0-meters of 38.3 g/t Au and 38 g/t Ag in historic drillhole S-10; Evaluation of New Discoveries and Targets: Pilar Extension North and Northeast: Surface sampling returned 3.5 g/t Au and 645 g/t Ag; Placer Mining Corridors (Geological Mapping and Channel Sampling Planned prior to Drilling); New 3-kilometer corridor with multiple target zones; New Surface Discovery, 2-meters of 5.6 g/t Au, and 106 g/t Ag (Trenching and Channel Sampling Planned before to Drilling). Surface image of the Pilar Project with recent surface chip sample results highlighting the different target areas for drilling.