Talisman Deep Project - Napoleon Lead

Technical Presentation - March 2021

Disclaimer

This presentation has been prepared by Tamaska Oil and Gas Limited (Company), based on information available as at the date of this presentation. The information in this presentation is provided in summary form and does not contain all information necessary to make an investment decision.

The information contained in this presentation is not investment or financial product advice and is not intended to be used for the basis of making an investment decision. The Company strongly suggests that investors obtain their own advice before making any investment decision.

The Company has prepared this document based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the fairness, accuracy or completeness of the information, opinions and conclusions contained in this presentation.

To the maximum extent permitted by law, the Company, its related bodies corporate (as that term is defined in the Corporations Act) and the officers, directors, employees, advisers and agents of those entities do not accept any responsibility or liability including, without limitation, any liability arising from fault or negligence on the part of any person, for any loss arising from the use of the presentation or its contents or otherwise arising in connection with it.

For further detail in relation to the Talisman Deep Project, please refer to the Company announcement lodged with the ASX on 22 February 2021.

Napoleon

  • 1. Introduction

  • 2. Regional Aspects

  • 3. Structure & Charge

  • 4. Reservoir and Seal

  • 5. Summary

Napoleon - Introduction

  • § TMK owns 20% of the Talisman Deep Project, which contains the Napoleon structure

  • § Located in WA-8-L below Talisman in the Barrow-Dampier Sub-basin

  • § Simple large structure - 3D reprocessing in progress - target size similar to Dorado and neighbouring Wanaea

  • § 80-90m water depth

  • § Proven productive reservoir (North Rankin Formation) at approx. 4,200m

  • § Proven reservoir/seal (Murat Siltstone) pair

  • § Charge - structure located in the liquids rich part of the basin dominated by charge from Lwr-Mid Jurassic. Geochemical modelling in progress.

  • § Full technical evaluation with independent prospective resource estimate underway - target June 2021

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original document
  • Permalink

Disclaimer

Tamaska Oil and Gas Limited published this content on 08 March 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 08 March 2021 23:56:02 UTC.