Terra Balcanica Resources Corp. provided an update from the Phase I and II exploration drilling within its principal 168 km2 Viogor-Zanik project in Bosnia-Herzegovina. The Company completed approximately 2,200 m of drilling along a shallow, high grade, silver-dominated, intermediate sulfidation polymetallic Ag-Au-Pb-Zn-Sb vein system at the locality known as Chumavichi.

This semi-continuous, 7.2 km-long structural corridor associated with a low magnetic response was previously largely untested by drilling and hosts altered volcanic tuffs and breccias with occurrences of massive Pb, Zn and Fe sulphides. At the Company?s second Viogor-Zanik target of Brezani, Terra discovered a surficial auriferous skarn superimposed on an Ag-Pb-Zn-Au mineralized, NE-shallowing structural system itself overlying porphyry andesites stock from 550 m of depth. The target is characterized by overlapping 1.2 km wide magnetic and EM anomalies with over 700 meters wide Au-Bi-Zn anomaly at surface and banded skarn outcrops with sphalerite and chalcopyrite.

Similar geophysical signatures are detected at the 4.1 Moz Au Eq. Rogozna Au-Cu skarn project in SW Serbia. The Company completed approximately 1,200 m of diamond drilling at Brezani with additional assays to be released shortly.

Highlights: Maiden Chumavichi Ridge drillhole CMVDD001 intercepted 824.2 g/t AgEq. over 4.0 m from 29 m of depth, including 1,634.4 g/t AgEq. over 2.0 meters; Chumavichi Ridge drill hole CMVDD002 intercepted 816.1 g/t AgEq.

over 2.0 m; CMVDD003, an 83-meter step-out from CMVDD001, intercepted a vein interval of 465.5 g/t AgEq. over 8.7 meters, including 1196.6 g/t AgEq. over 2.0 meters, and is open at depth; The step out drillhole CMVDD005 returned 284 g/t AgEq over 10.0 m including 895.8 g/t AgEq over 2.0 m approximately 50 m west-northwest of CMVDD002; The Chumavichi Ridge drill hole CMVDD004 along the same drill fence 40 m northeast of CMVDD005 returned 505.3 g/t AgEq over 11.0 m from 43.0 m depth including 3075.4 g/t AgEq (108.5 oz/t AgEq) over 1.7 m; Shallow, polymetallic mineralization was also intersected 600 m NW of the discovery hole at the Cumavici Ridge where two drill holes through a new parallel structure returned 531 g/t AgEq over 0.75 m (CMV23007), and 355 g/t AgEq over 1.10 m (CMV23009); The Phase II drillhole CMV23004 intersected 1,168 g/t AgEq over 1.35 m from 36.2 m downhole to add 42 m strike length SE of CMVDD002 with mineralization remaining open and untested down-dip; Drill hole CMV23003 intersected 457 g/t AgEq over 4.15 m from 43.85 m downhole and points to a wider down-dip continuation of the high-grade mineralization from the previously reported CMV23004; Drill testing of the 650 m-wide, conductivity high at the centre a 1.2 km wide anomalously magnetic rock volume at Brezani intercepted 0.61 g/t AuEq over 88.0 m (BREDD002) and 0.58 g/t AuEq over 28.6 m (BREDD001).

Continuation of this drill hole along same azimuth and dip to depth of 674 m has intercepted a substantial width of low to intermediate sulphidation epithermal mineralization and potassically altered, porphyritic andesites overprinted by chlorite from 550 m depth. Upcoming Results: Laboratory assays results from section of drill hole BREDD002 below 215 m depth are pending QA/QC verification and will be released imminently. Additionally, four more diamond drill holes (BRE23001-004) between depths of 120 and 160 m that tested the surface gold bearing calc-silicates and magmatic breccias will be released in comings months.