Gold Reach Resources Ltd. announced that assay results for holes S13-170 to 177 from the East and West Seel deposits have been received. The East Seel deposit is located adjacent to the company's West Seel discovery, and both occur 4 kilometres south-southwest of the company's Ox deposit. All 3 deposits occur on the company's 100% owned Ootsa Property located adjacent to the producing Huckleberry copper Mine south of Smithers, British Columbia.

East Seel Deposit - High Grade Intercepts Continue; Hole S13-172 intersected 35.8m of 0.84% copper equivalent from 39.2 to 75m depth. Hole S13-174 intersected 91.5m of 0.62% copper equivalent from 36.5 to 128m depth, including 53.5m grading 0.76% copper equivalent. Hole S13-175 intersected 46.3m of 0.74% copper equivalent from 101.7 to 148m depth.

Hole S13-177 intersected 186.2m of 0.78% copper equivalent from 26.8 to 213m depth, including 82.2m grading 1.15% copper equivalent and 46m of 1.44% copper equivalent. West Seel Deposit - Near Surface High Grade Expanded. Hole S13-171 intersected 14m of 0.93% copper equivalent from 7 to 21 metres depth.

This extends the near surface high-grade zone 80 metres to the southeast of the high grade intercept encountered in hole S13-169. The West Seel high grade mineralization starts as shallow as 7m below surface and has been outlined over widths up to 150m, a length of up to 125m and a thickness of up to 40m, and remains open for expansion. West Seel Deposit - Long Mineralized Intercepts.

Hole S13-171 intersected 224m of 0.42% copper equivalent from 7 to 231m depth, followed by another 126m of 0.36% copper equivalent from 261m to the end of the hole at 387m. Hole S13-176 intersected 198m of 0.39% copper equivalent from 44 to 242m depth, followed by another 58.2m of 0.41% copper equivalent from 266m to 324.2m depth. The goal of the 2013 drilling program, which is now complete, was to infill and expand known zones of higher-grade near-surface mineralization at Ox, East Seel, and West Seel and the program has been very successful at achieving that goal.

Results for 22 additional drill holes from the 2013 program are still pending.