Superior Gold Inc. announced Production results for the Fourth Quarter and Full Year ended Dec 31, 2022. For the quarter, the company reported Stope material mined of 153,951 Tonnes, Stope grade mined of 2.41 g/t Au, Stope production drilling of 46,382 meters, Development material mined of 57,519 Tonnes, Development grade mined of 0.99 g/t Au, Development metres 1,971 meters, Surface material milled of 138,143 Tonnes, Surface material grade of 0.67 g/t Au, Total material milled of 359,900 Tonnes, Grade milled 1.46 g/t Au and Gold Produced of 14,448 ounces.

For the year, the company reported Stope material mined of 653,982 Tonnes, Stope grade mined of 2.52 g/t Au, Stope production drilling of 141,714 meters, Development material mined of 148,592 Tonnes, Development grade mined of 0.94 g/t Au, Development metres 6,695 meters, Surface material milled of 763,154 Tonnes, Surface material grade of 0.64 g/t Au, Total material milled of 1,565,354 Tonnes, Grade milled 1.46 g/t Au and Gold Produced of 62,336 ounces.