Resolute Mining Limited provided production update for the Quarter and twelve months ended December 31, 2019. For the quarter, total quarterly gold production increased by 2,092 ounces (oz) to 105,293oz. This improvement in Company production was achieved despite the sulphide circuit at the Syama Gold Mine in Mali (Syama) being offline for the majority of the quarter. Gold production from Syama for the December 2019 Quarter was 46,945oz comprising 33,049oz from the oxide circuit and 13,896oz from the sulphide circuit. Mako delivered another excellent result in its second quarter under Resolute ownership with 42,997oz of gold produced for the December 2019 Quarter. Ravenswood produced 15,351oz of gold, an increase of 2,146oz on the September 2019 Quarter. Resolute's total gold production for the 12 months to 31 December 2019 totalled 384,731oz representing a variance of less than 4% to annual production guidance of 400,000oz. The unscheduled material loss of production from the Syama sulphide circuit was balanced by the outperformance of the Syama oxide circuit, and strong performance from Resolute's Mako Gold Mine in Senegal (Mako) and Ravenswood Gold Mine in Queensland (Ravenswood). For the full year to 31 December 2019, the Company's production result of 384,731oz comprised 243,058oz from Syama, 87,187oz from Mako (for the period under Resolute ownership), and 54,486oz from Ravenswood. At Syama, the oxide circuit produced 180,534oz and the Syama sulphide circuit produced 62,524oz. Syama sulphide production is expected to accelerate rapidly in the current quarter and be a strong performer for Resolute in the 2020 financial year (FY20). The Syama roaster is now fully operational and operating at nameplate capacity. More than 400,000 tonnes of underground ore has been stockpiled and is available for processing. The Syama underground autonomous fleet is commissioned and Resolute is well positioned to deliver on Syama's potential in 2020.