º Intersection of significant mineralization in the Jubilee Shear outside the footprints of the 2019 resource:9.57 g/t gold over 10.95 metres including 83.71 g/t gold over 1.00 metres and 5.65 g/t gold over 1.00 metres in SD-23-457
- Discovery of significant mineralization 400 metres down-dip of the 2019 resource and 325 metres north of the Surluga South discovery in the Jubilee Shear in SD-23-455:
º 5.61 g/t gold over 7.85 metres including 21.6 g/t gold over 1.35 metres
- Continued expansion at the footprint(s) of mineralization at the Jubilee/Minto B intersection in SD-23-449 (Figures 1 and 2):
º 1.71 g/t gold over 38.97 m including 2.55 g/t gold over 15.85 metres at the intersection of the Minto B/Jubilee Shears
Table 1– Highlights from drilling in the Wawa Gold Corridor (Figure 1)
Hole | From (m) | To | Length (m)* | Visible Gold | Gold (g/t) | Zone |
(m) | ||||||
SD-23-449 | 334.76 | 373.73 | 38.97 | 1.71 | Jubilee/Minto B | |
Including | ||||||
354.73 | 355.81 | 1.08 | 6.67 | |||
363.21 | 364.29 | 1.08 | 8.14 | |||
369.53 | 370.58 | 1.05 | 6.44 | |||
SD-23-455 | 642.81 | 644 | 1.19 | 2.26 | Jubilee Shear | |
679.62 | 687.47 | 7.85 | 5.61 | |||
Including | ||||||
682.41 | 683.76 | 1.35 | 21.4 | |||
SD-23-457 | 28.85 | 38.74 | 9.89 | 0.50 | Minto B Shear | |
163.93 | 164.95 | 1.02 | 1.22 | |||
235.15 | 246.1 | 10.95 | VG | 9.57 | Jubilee Shear | |
Including | ||||||
239.82 | 240.82 | 1.00 | VG | 83.71 | ||
244.1 | 255.1 | 1.00 | 5.65 |
Assay results presented over core length. True width for the intersections varies between 70 to 95% depending on the intersected geological structure.
Quality Assurance/Quality Control ("QA/QC") Measures
Drill core samples were transported in security sealed bags for analyses to Actlabs in
Red Pine has implemented a quality-control program to comply with best practices in the sampling and analysis of drill core. As part of its QA/QC program, Red Pine inserts external gold standards (low to high grade) and blanks every 20 samples in addition to random standards, blanks, and duplicates.
Qualified Person
About
For more information about the Company, visit www.redpineexp.com
Or contact:
Or
1 National Instrument 43-101 Technical Report for the
Neither
Cautionary Note Regarding Forward-Looking Information
This news release contains statements which constitute “forward-looking information” within the meaning of applicable securities laws, including statements regarding the plans, intentions, beliefs and current expectations of the Company with respect to future business activities and operating performance.
Forward-looking information is often identified by the words “may”, “would”, “could”, “should”, “will”, “intend”, “plan”, “anticipate”, “believe”, “estimate”, “expect” or similar expressions. Forward-looking information contained in this news release includes but may not be limited to: “the potential for a hybrid pit and underground project”. Investors are cautioned that forward-looking information is not based on historical facts but instead reflect management’s expectations, estimates or projections concerning future results or events based on the opinions, assumptions and estimates of management considered reasonable at the date the statements are made. Such opinions, assumptions and estimates are inherently subject to a variety of risks and uncertainties that could cause actual events or results to differ materially from those projected and undue reliance should not be placed on such information, as unknown or unpredictable factors could have material adverse effects on future results, performance or achievements. Among the key factors that could cause actual results to differ materially from those projected in the forward-looking information are the following: the Company's expectations in connection with the projects and exploration programs being met, the impact of general business and economic conditions, global liquidity and credit availability on the timing of cash flows and the values of assets and liabilities based on projected future conditions, fluctuating gold prices, currency exchange rates (such as the Canadian dollar versus the United States Dollar), variations in ore grade or recovery rates, changes in accounting policies, changes in the Company's mineral reserves and resources, changes in project parameters as plans continue to be refined, changes in project development, construction, production and commissioning time frames, the possibility of project cost overruns or unanticipated costs and expenses, higher prices for fuel, power, labour and other consumables contributing to higher costs and general risks of the mining industry, failure of plant, equipment or processes to operate as anticipated, unexpected changes in mine life, seasonality and weather, costs and timing of the development of new deposits, success of exploration activities, permitting time lines, government regulation of mining operations, environmental risks, unanticipated reclamation expenses, title disputes or claims, and limitations on insurance.
This information is qualified in its entirety by cautionary statements and risk factor disclosure contained in filings made by the Company, including financial statements and related MD&A for the year ended
Should one or more of these risks or uncertainties materialize, or should assumptions underlying the forward-looking information prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, believed, estimated or expected. Although the Company has attempted to identify important risks, uncertainties and factors which could cause actual results to differ materially, there may be others that cause results not to be as anticipated, estimated or intended. The Company does not intend, and does not assume any obligation, to update this forward-looking information except as otherwise required by applicable law.
Figure 1 - Plan Map of the Drilling Results
A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/4a3302be-53e5-4a77-8eb8-7b01dbea6a85
Figure 2 - Section of the Significant Mineralization 400 metres down dip of the 2019 Surluga Deposit.
A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/db3fd142-61d0-41a9-8250-2eec0a9dd9ef
Figure 1
Plan Map of the Drilling Results
Figure 2
Section of the Significant Mineralization 400 metres down dip of the 2019 Surluga Deposit.
2023 GlobeNewswire, Inc., source