Pure Gold Mining Inc. announced final drill results from the 2014 exploration program at its 100% owned Madsen Gold Project in the prolific Red Lake gold district of northwest Ontario. The results are highlighted by an intercept of 7.0 g/t gold over 9.0 metres, including 26.6 g/t gold over 2.0 metres, occurring approximately 35 vertical metres below surface at the Austin Zone. This hole targeted near surface mineralization on the southern, up-dip extent of the Madsen mineral resource.

Pure Gold completed a total of 6,895 metres from 26 exploration drill holes in 2014 and has been successful in discovering high-grade mineralization in the Fork Zone, McVeigh Ramp and Austin target areas. All drilling in 2014 was conducted utilizing oriented core to help identify structural and stratigraphic controls on mineralization.