Otso Gold Corp. announced initial drill results from the infill drill program currently being completed to increase confidence in the mineralization and form a basis for a restart plan. The first phase of the 10-15,000 m infill drill programme at the Otso Gold Mine in Finland was completed with over 1,900 metres of diamond drilling over 20 holes. The majority of the core is currently being cut and sent for testing. Samples from this drilling program were from half core of 57.5 mm diameter, oriented diamond drill core. Samples and duplicates were taken as 1-meter samples and cut with a core saw on site. Intervals of interest were identified by logging and were submitted in batches to the CRS Laboratory in Oulu, Finland according to Otso's quality control procedures. A total of 757 samples have been submitted to date (including 87 QA/QC samples) to the CRS Laboratory for interim gold analysis by PAL1000 method whilst fire assay samples are being processed. PAL1000 analyses are based on cyanide extractable gold and generally understate the gold content, but they are suitable for making changes to the drill plan to prioritize drilling. However, future resource estimates and grade calculations will be based on fire assays.