• Navarre Minerals Limited ("Navarre"), via its 100% owned subsidiary Navarre Minerals Queensland Pty Ltd ("Navarre Minerals
Queensland"), has agreed to acquire the Mt Carlton Gold Mine ("Mt Carlton") and Crush Creek project ("Crush Creek"), located in | ||
Queensland, Australia (collectively, the "Mt Carlton Operations") from Conquest Mining Pty Limited ("Conquest Mining"), a 100% | ||
owned subsidiary of Evolution Mining Limited ("Evolution") (the "Transaction") | ||
• Acquisition consideration up to A$90 million ("Consideration"), comprised of: | ||
• A$40 million in upfront consideration paid at the time of Completion, of which payment of A$13.2 million will be satisfied by | ||
Navarre issuing ordinary shares to Evolution, calculated by reference to the issue price per share under the Placement | ||
• Up to A$25 million in additional cash consideration payable upon the realisation of the following aggregate recoverable gold | ||
Tra saction | production milestones from Crush Creek: | |
Overview | • A$5 million at 50koz of gold production; | |
only | • A$5 million at 100koz of gold production; and | |
• A$15 million at 175koz of gold production | ||
• Up to A$25 million in additional cash consideration linked to the future gold price, with payments commencing 1 July 2023 and | ||
running for a maximum of 15 years, calculated as follows: | ||
• If the average spot gold price in any quarter exceeds the equivalent of A$2,250/oz, 5% of the average spot gold price multiplied | ||
by the aggregate ounces produced from the Mt Carlton Operations and sold in that quarter | ||
• Completion of the Transaction is expected to occur 5 business days after relevant customary closing conditions (including shareholder | ||
approval) have been satisfied | ||
Transaction | • The Transaction and associated costs to be funded from the fully underwrittenconditional placement of A$36.8 million to new and | |
useF nding | existing institutional and sophisticated investors at an issue price of A$0.075 per fully paid ordinary new share | |
nal | 2 | |
ASSET OVERVIEW
U N E A R T H I N G P R O S P E R I T Y
ASX: NML
The Mt Carlton Operations comprises an open pit and underground mine, and a 950ktpa processing plant situated on a tenement package of ~815km2
Overview | ||||
Location | ▪ | 150km south of Townsville, Queensland | ||
Tenement Package | ▪ | ~815km2 (3MLs, 1 MDL, 11 EPMs) | ||
Mi | eralisation Type | ▪ | High sulphidation epithermal deposit | Townsville |
Mi | i g Method | ▪ | Open pit and underground (open stoping) | |
Mt Carlton Operations | ||||
Pr | cess Method | ▪ | Conventional crushing, grinding and flotation to produce a | Mackay |
polymetallic concentrate | ||||
onlyPr cess Capacity | Queensland | |||
▪ | 950ktpa | |||
Brisbane | ||||
Workforce | ▪ | 153 Full-time Employees / 120 Contractors (at 30 June 2021) | ||
Acc ss | ▪ via ~40km gravel road (off Bruce Highway) | ||||||||||
Pow r | ▪ Grid power supplied to site mine through 22kV lines with a | ||||||||||
combined capacity of 6MW | |||||||||||
Water | ▪ Burdekin river pipeline (225mm, 36km) 600ML agreement in | ||||||||||
place | |||||||||||
Safety | ▪ Total Reportable Injury Frequency: 7.4 (12mth moving avg. at | ||||||||||
30 June 2021) | |||||||||||
use | |||||||||||
(1) | ▪ 9.53Mt @ 1.26g/t for 387koz Gold | ||||||||||
Mineral Resources | |||||||||||
▪ | 2.69Mt @ 0.49% for 13kt Copper | ||||||||||
Ore Reserves(1) | ▪ 6.43Mt @ 0.81g/t for 168koz Gold | ||||||||||
▪ | 0.62Mt @ 0.74% for 5kt Copper | 3 | |||||||||
(1) Extracted from Evolution's ASX Release dated 17 February 2021 entitled "Annual Mineral Resources and Ore Reserves Statement". See pages 35-37 for further details and also refer to Evolution's ASX Releases dated 12 February 2020 entitled | |||||||||||
nal |
"Annual Mineral Resources and Ore Reserves Statement" and dated 19 June 2020 entitled "Mt Carlton Update"
POTENTIAL FOR MINE LIFE EXTENSION
AT MT CARLTON
U N E A R T H I N G P R O S P E R I T Y
ASX: NML
Residual resources at Mt Carlton economic under current prices, with underground extensions possible through investment in underground drilling. Permitting of satellite deposits advanced
Overview | Mt Carlton (V2 and A39) and Satellites | ||
• Economic extensions identified through technical due | |||
diligence as a greater flexibility with price assumptions | |||
and incremental drilling not captured in last MROR | |||
(December 2020) | |||
• | V2 pit: Link Zone/Western Feeder Zone. | ||
only | Mineralisation continues to extend beyond existing | ||
planned extraction | |||
• | V2 Underground. Mining ongoing, extents remain | ||
use | untested | ||
A39 Underground | |||
• | |||
• | Mt Carlton United open pit. Ore body remains open at | ||
depth and along strike |
•
nal
4
CRUSH CREEK LOCATION AND
PROJECT AREA OVERVIEW
Crush Creek is located ~30km southeast of Mt Carlton in Queensland
U N E A R T H I N G P R O S P E R I T Y
ASX: NML
Location of Crush Creek in Relation to Mt Carlton | Crush Creek Project Area Showing Regional Targets |
nal use only
5
This is an excerpt of the original content. To continue reading it, access the original document here.
Attachments
- Original document
- Permalink
Disclaimer
Navarre Minerals Limited published this content on 15 November 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 15 November 2021 02:49:04 UTC.