Torino Power Solutions Inc. has received a purchase order from BC Hydro for the installation of its Power Line Monitoring (PLM) sensor system in northern British Columbia. Torino will deliver one of its overhead conductor sensor systems to a specified location in northern B.C. in February. The purchase order is for $20,000 for one PLM unit that will be used for an evaluation installation. The Company will provide further installation details and timing in the coming weeks. Torino's patented microwave cavity sensor technology delivers real-time temperature measurements of overhead powerlines that allow for increased transmission capacity, improved grid resiliency, lower energy costs and bottleneck elimination. Torino sensors can be deployed quickly and begin transmitting real-time data to the utility almost immediately.