LIFT Power Ltd. reported assays from 8 drill holes completed at the Echo, Shorty, Fi-SW, Ki, & BIG East pegmatites within the Yellowknife Lithium Project ("YLP") located outside the city of Yellowknife, Northwest Territories. Drilling has intersected significant intervals of spodumene mineralization, with the following highlights: YLP-0107: 13 m at 1.24% Li2O, (Echo) and: 5 m at 0.62% Li2O and: 2 m at 0.76% Li2O; YLP-0101: 13 m at 1.28% Li2O, (BIG East) and: 2 m at 0". YLP-0098: 13 m at 1.27% Li2O, (Ki) and: 5 m at0.63% Li2O including: 2 m at 1.25% Li2O and YLP-0094: 11 m at 1.38% Li2O, (Shorty).

This week's drill results include the first two holes drilled on the Echo pegmatite (YLP-0099, 107) as well as six holes split among the Shorty (YLP-0094, 103), Ki (YLP-0098), BIG East (YLP-0101, and Fi Southwest (YLP-0105) pegmatites. All nine dykes returned negligible grade. Plan view showing the surface expression of the Fi SW pegmatite with diamond drill holes reported in this press release.

The Company has concluded its 2023 drill program at the Yellowknife Lithium Project with 34,238 m completed. Currently, LIFT has reported results from 108 out of 198 diamond drill holes (19,034 m). Drill Hole Easting Northing Elevation (m) Azimuth (deg) Dip (deg) Depth (m) Dyke (YLP-0094), Shorty and inc. YLP-0105).