Isgec has received an order for Wet Flue Gas Desulphurisation System Package for the 2x660 MW Khurja Thermal Power Project in Uttar Pradesh from L&T MHI Power Boilers Pvt. Ltd. (formerly L&T MHPS Boilers Pvt. Ltd.). The end user for this project is THDC India Ltd. and the Consultant is NTPC. The objective of this project is the removal of Sulphur Dioxide so as to make the plant compliant to the latest emission norms. The broad scope of the project includes Design, Engineering, Supply, Transportation, Erection, Commissioning, and Performance Guarantee Testing. Isgec has also bagged an order for DeNOx (Combustion Modifications) Package for the 2x77 MW & 1x80 MW Wall Fired Boilers at Gummidipoondi, Tamil Nadu from one of their existing customer - OPG Power Generation Pvt. Ltd. This project is aimed at reducing NOx in order to make the plant compliant with the recent NOx emission norms. The Consultant for this project is Aquatherm. The broad scope of the project includes Design, Engineering, Supply, Transportation, Erection, Commissioning, and Performance Guarantee Testing. This is yet another Combustion Modification project for Isgec after the successful execution of the Combustion Modification (DeNOx) Project of the 1x150 MW Tangentially Fired Boiler for Hindalco Industries Ltd. at their Aditya Aluminium Unit in Sambalpur, Odisha.