Integra Resources Corp.

Management's Discussion and Analysis

For the Three and Six-Month Periods Ended

June 30, 2021 and 2020

Expressed in Canadian Dollars


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

This portion of this quarterly report provides Management's Discussion and Analysis ('MD&A') of the financial condition and results of operations, to enable a reader to assess material changes in financial condition and results of operations as at, and for the three and six-month periods ended June 30, 2021, in comparison to the corresponding prior-year periods. The MD&A is intended to help the reader understand Integra Resources Corp. ('Integra', 'we', 'our' or the 'Company'), our operations, financial performance, and present and future business environment.

This MD&A has been prepared by management as at August 10, 2021 and should be read in conjunction with the unaudited interim condensed consolidated financial statements of Integra for the three and six-month periods ended June 30, 2021 and 2020 and the Company's audited consolidated financial statements of Integra for the years ended December 31, 2020 and 2019 prepared in accordance with International Financial Reporting Standards ('IFRS') as issued by the International Accounting Standards Board (the 'IASB'). Further information on the Company can be found on SEDAR at www.sedar.com and the Company's website, www.integraresources.com.

For the purposes of preparing our MD&A, we consider the materiality of information. Information is considered material if: (i) such information results in, or would reasonably be expected to result in, a significant change in the market price or value of our shares; or (ii) there is a substantial likelihood that a reasonable investor would consider it important in making an investment decision; or (iii) it would significantly alter the total mix of information available to investors. We evaluate materiality with reference to all relevant circumstances, including potential market sensitivity.

CORPORATE SUMMARY

Integra Resources Corp. is a mineral resources company engaged in the acquisition, exploration, and development of mineral properties in the Americas. The primary focus of the Company is advancement of its DeLamar gold and silver project ('DeLamar Project'), consisting of the neighboring DeLamar Deposit and Florida Mountain Deposit ('Florida Mtn' or 'Florida Mountain') in the heart of the historic Owyhee County mining district in south western Idaho. The management team comprises the former executive team from Integra Gold Corp. The Company announced in September 2019 a positive Preliminary Economic Assessment ('PEA') and expects completing a Pre-Feasibility Study ('PFS') in late 2021.

As of August 10, 2021, the officers and directors of the Company were:

George SalamisPresident, Director and CEO

Andrée St-GermainChief Financial Officer

Max BakerVice President Exploration

Timothy ArnoldChief Operating Officer

Joshua SerfassExecutive VP, Corporate Development and Investor Relations

Leanne NakashimadaCorporate Secretary

Stephen de JongChairman and Director

David AwramDirector

Timo JauristoDirector

Anna Ladd-Kruger Director

C.L. 'Butch' OtterDirector

Carolyn Clark LoderDirector

The Company is incorporated under the Business Corporations Act (British Columbia) (the 'BCBCA').

The Company's head office is located at 1050 - 400 Burrard Street, Vancouver, BC V6C 3A6 and its registered office is located at 2200 HSBC Building, 885 West Georgia Street Vancouver, BC V6C 3E8.

The Company trades on the TSX Venture Exchange ('TSX-V'), under the trading symbol 'ITR' and trades in the United States on the NYSE American under the stock symbol 'ITRG'.

2


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

The following diagram illustrates the intercorporate relationships among Integra and its subsidiaries, as well as the jurisdiction of incorporation of each entity.

Q2 2021 IN REVIEW

CORPORATE

For the safety of all employees, the Company closed its corporate office (Vancouver, BC) in mid-March 2020 as a result of the COVID-19 global outbreak. All corporate employees continue to work remotely from home, with some employees now working periodically at the office under safe COVID-19 protection protocols. One of the most impacted activities at the corporate level has been the ability to travel due to travel bans and safety risks. The Company has however remained extremely active on the investor relations and marketing fronts through virtual media forums both with investors and at multiple industry conferences.

The Company held its Annual General Meeting of shareholders ('AGM') on June 29, 2021. A total of 22,225,932common shares have been voted, representing 40.5% of the Company's outstanding shares. All of the directors were re-elected, and all other resolutions were approved by the Company's shareholders.

DEVELOPMENT

The development activities in Q2 2021 were not materially impacted by the COVID-19 pandemic.

Condemnation Drilling:

The Company commenced its condemnation drilling program in Q2 2021 and drilled at total of 792m this quarter. The Company expects a total of ~3,000m of condemnation drilling to be completed by the end of the year.

3


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

Permitting:

The Company announced in August of 2020 a Memorandum of Understanding ('MOU') to facilitate the hiring of a dedicated mineral specialist Project Manager in the Marsing, Idaho U.S. Bureau of Land Management ('BLM') office. That transition began in January 2021 and the BLM Project Manager became full time in April 2021. The Project Manager has been a consistent and efficient point of contact for Integra through Q2 2021 and will become the focal communication point for the BLM moving forward. The BLM project manager will be responsible for all the DeLamar Project permitting work and will help the BLM manage increased workloads from current and anticipated future applications for mineral notices, operations plans/amendment approvals and environmental analyses reviews. This funding effort provided by Integra is intended to increase the capacity of the local BLM office allowing staff to work on DeLamar Project related applications and project requests on a priority basis, while not burdening the BLM with the cost of this increased workload.

The BLM selected SWCA Environmental Consultants ('SWCA') as the third party environmental impact study ('EIS') contractor in support of the DeLamar Project to act as an extension of BLM staff to review and ensure Integra submitted baseline plans of study are deemed adequate and defensible for subsequent inclusion in the draft and final EIS.

Surface water and the newly drilled and installed 2020 groundwater wells were sampled during Q1 and Q2 of 2021. Additional consultants and contractors were brought on board by Integra to support the submittal of aquatic resources, wildlife, wetlands, vegetation, cultural resources, geochemistry and soils plans of study that have been submitted to the agency and the Third-Party Contractor to the BLM (SWCA) for subsequent review and approval.

Metallurgical Engineering and Pre-Feasibility Study:

Column leach tests on Florida Mountain oxide and transitional materials were completed during Q2, with several assays and final results to come in early Q3.

Grind size optimization testing on Florida Mountain unoxidized material yielded a primary grind target of 150µm with sufficient flotation recovery to eliminate the gravity circuit. Column testing composites for DeLamar were selected and sample preparation started, as well as composites for unoxidized mill testing.

Process flow sheets and layouts advanced in Q2. A trade off study was completed to evaluate heap leach feed crush size including an agitated leach mill for higher grade materials. A ½ inch crush has been selected as the most economic feed size for the Florida Mountain heap leach material. Other trade off studies were completed in Q2 for the unoxidized material to evaluate processing options and throughputs, including heap leach throughput and flotation tailing leach. For the PFS, unoxidized material from both Florida Mountain and DeLamar will processed similar to the PEA - regrinding and leaching of the flotation concentrate, but at a significantly higher throughput to account for the addition of DeLamar unoxidized material.

Geotech and condemnation drilling for the flotation tailing storage facility for the PFS was completed in Q2. Evaluation of site access roads progressed as well, and several options are expected for consideration in Q3.

Work progressed during the quarter to determine potential solar pan farm locations for potential on-site solar power generation and microgrid options; studies are aimed at the potential power cost offset for the site.

4


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

EXPLORATION

Impact of COVID-19 on Drilling Activities

Some of Integra's contractors, namely our drilling contractors and assay laboratory, have experienced labour shortage as a result of the COVID-19 pandemic. This impacted our drilling productivity in Q2 and greatly delayed our assay result turn around from the laboratories.

Drilling

The Company completed a total of 10,150 m of core drilling and 2,376 m of reverse circulation ('RC') drilling in Q2 2021 for a total of 12,526 m drilled this quarter, including 8,088 m at Florida Mtn, 1,359 m at DeLamar deposit, and 3,079 m at BlackSheep.

Florida Mountain Drilling

The Company announced in its June 3, 2021 press release drilling results from Florida Mountain. The results continue to demonstrate high-grade gold-silver mineralization continuity in various locations covering a strike length of 1.5 kilometers on the deposit and in some cases 250 m outside of the current NI 43-101 resource model. Including the drill results announced on June 3, the Company has reported a total of 79 high-grade intercepts at Florida Mountain, with grades of over 4 g/t AuEq and a minimum width of 1.52 m. The continued success in intersecting high-grade gold-silver at Florida Mountain has demonstrated the accuracy of the geological model created by Integra's exploration team.

Florida Mountain drill highlights included*:

•Drill hole FME-21-109
o1.01 g/t Au and 2.34 g/t Ag (1.04 g/t AuEq over 24.39 m, including 7.98 g/t Au and 8.30 g/t Ag (8.09 g/t AuEq) over 1.37 m

•Drill hole FME-21-110
o2.10 g/t Au and 2.38 g/t Ag (2.13 g/t gold equivalent ('AuEq') over 17.38 m, including 12.94 g/t Au and 3.01 g/t Ag (12.98 g/t AuEq) over 1.52 m

•Drill hole FME-21-111
o0.82 g/t Au and 23.31 g/t Ag (1.12 g/t AuEq) over 23.47 m

•Drill hole FME-21-116
o4.28 g/t Au and 1,689 g/t Ag (26.02 g/t AuEq) over 0.92 m

•Drill hole FME-21-118
o3.20 g/t Au and 790.50 g/t Ag (13.37 g/t AuEq) over 6.71 m, including 27.04 g/t Au and 6,631 g/t Ag (112.38 g/t AuEq) over 0.76 m

The Company announced in its April 8, 2021 press release drilling results from Florida Mountain. The results continued to demonstrate high-grade gold-silver mineralization continuity, in some cases 300 m outside of the resource model.

Florida Mountain drill highlights included*:

•Drill hole FME-21-106
o12.90 g/t Au and 1,675.00 g/t Ag (34.46 g/t AuEq) over 1.52 m
o15.17 g/t Au and 250.00 g/t Ag (18.39 g/t AuEq) over 0.92 m

•Drill hole FME-21-107
o16.86 g/t Au and 2472.00 g/t Ag (48.67 g/t AuEq) over 1.25 m

•Drill hole FME-21-104

5


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

o0.49 g/t Au and 125.72 g/t Ag (2.10 g/t AuEq) over 16.92 m

The intercepts reported on April 8, 2021 consist of mineralization with wide-spread low-grade gold-silver values, crosscut and underlain by narrower high-grade, steeply dipping low-sulphidation quartz-adularia veins. Widespread intercepts from both historic shallow oxide and transitional resource definition drilling and recent deeper drilling to vertical depths up to 400 m below surface (and 250 m below the base of the current resource) conducted by Integra over the previous two years has confirmed potentially mineable widths and grades for these high-grade structures.

BlackSheep District Drilling

The Company announced in its April 8, 2021 press release further drill results for the Lucky Days target, including a large, low-grade gold-silver intercept from the recently discovered Lucky Days target*:

•Drill hole LDE-21-002
o0.50 g/t Au and 41.15 g/t Ag (1.03 g/t AuEq) over 25.15 m, including 2.13 g/t Au and 213.28 g/t Ag (4.87 g/t AuEq) over 2.13 m

Drill hole LDE-21-002, released on April 8, 2021, was designed to intercept a vein structure at a shallow depth (25-30 m), and the high silver intersected at this interval along with the shallow-level vein textures indicate the potential for high-grade mineralization at depth. In addition, this drill hole clipped the southern end of an extensive zone of lower grade stockwork vein mineralization delineated by soil and rock-chip geochemistry and IP geochemistry. The 25.15 m intercept averaging 1.03g/t AuEq at the southern end of this 250 m x 100 m stockwork zone is a very encouraging indication of low-grade open pit potential.

* Downhole thickness; true width varies depending on drill hole dip; most drill holes are aimed at intersecting the vein structures close to perpendicular therefore true widths are close to downhole widths (approximately 60%-70% conversion ratio); Intervals reported are uncapped; Gold equivalent = g Au/t + (g Ag/t ÷ 77.70); For the intervals that were previously mined / stopped and were therefore unrecoverable and unverifiable, a grade of 0 g/t Au was inserted for compositing.

43-101 Resource Update

Due to the successful demonstration of high-grade gold-silver intercepts at Florida Mountain over the past 24-36 months, the Company believes it preferable to incorporate these high-grade results into an updated NI 43-101 resource estimate on Florida Mountain. The previously scheduled Q2 resource estimate update will be deferred and an updated NI 43-101 resource estimate update with a high-grade component will be completed in conjunction with the Pre-feasibility Study ('PFS'), scheduled for completion in Q4, 2021.

SOCIAL AND ENVIRONMENTAL

Stakeholder meetings increased this quarter, as Integra's newly hired Community Affairs Manager commenced in March. Many meetings returned to in-person settings, and COVID-19 safety protocols were strictly adhered to, as appropriate. This quarter the Company engaged with local residents, educators, local non-profits, conservation groups, local city & community councils and chambers of commerce, state government representatives, and specific interest groups. The Company continues to build relationships with surrounding communities that future operations may touch.

Integra continued meeting with Tribal Nations Rightsholders with historic ties to the lands surrounding DeLamar in Q2. Following introductory meetings, Integra is focusing on establishing effective mechanisms for communication, and researching opportunities for respectful involvement. These meetings are in addition to the important inter-governmental agencies meetings held throughout the permitting process.

6


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

In efforts to both strengthen and formalize Integra's approach to certain aspects of the Company's interactions with our stakeholders and employees, several policy and committee outlines were drafted in Q2, including an Employee Volunteerism Policy, a Community Investment Policy, and a Company Culture Committee.

The Company announced on June 29 that it has entered into a Memorandum of Understanding ('MOU') with Trout Unlimited to evaluate and prioritize potential future habitat reclamation projects within the Jordan Creek watershed in Owyhee County, Idaho. This partnership with Trout Unlimited complements Integra's commitment to minimizing unnecessary impacts within the DeLamar Project boundaries and seeking opportunities to offset them with positive habitat impacts in our surrounding areas. This partnership also highlights the importance of collaboration when cleaning up legacy abandoned mine land sites in the west given the complicated mixed land ownership of former mining districts. The overarching goal of this project will be to holistically look at upper Jordan Creek to identify potential projects that will improve the environmental health of the watershed. Some examples of potential future projects could include road crossing improvements, aquatic organism and fish passage barrier identification, reclamation and revegetation of mining impacted lands, source reduction of pollutants from historic mills, and in-stream habitat improvements.

Integra joined the CleanTech Alliance, a Seattle-based group with over 1,100 member organizations that facilitates the generation and growth of cleantech companies and jobs across the Northwest. As a member, Integra will both benefit from collaborations with companies pushing the envelope of responsible environmental practice, and also represent an important voice as a potential future producer of silver and gold, two metals critical to clean technologies including solar energy production and next generation automotive production. Mark Stockton, Integra's Vice President of Corporate Affairs & Sustainability, will serve on the Board of Directors for the CleanTech Alliance.

Water treatment operations followed their regular course at the DeLamar Project. No material environmental or health and safety incidents were reported in Q2 2021.

2021 OUTLOOK

Although management has put in place all necessary measures to protect its employees' safety and to secure essential site activities, should the virus spread, or travel bans get put back into place or should one of the Company's staff members or consultants become infected, the Company's ability to advance the DeLamar Project may be impacted. The Company continues to monitor the situation and the impact the virus may have on the DeLamar Project.

All corporate employees continue to work remotely from home, with some employees now working periodically at the office under safe COVID protection protocols.

The Company will continue its dual track strategy for 2021, consisting of exploration drilling designed to expand the mineral resource base and development study and permitting work designed to de-risk the DeLamar Project.

DEVELOPMENT

A key objective for 2021 will be to complete the PFS in the 4th quarter. To achieve this goal, extensive metallurgical test work will be carried out this year to de-risk and enhance project economics, relative to the 2019 PEA study. There will also be significant condemnation, geotechnical and groundwater drilling programs in 2021. On the permitting front, surface, groundwater, geochemistry, wetlands, wildlife, aquatic, cultural and associated baseline studies, along with the management of these efforts, will extend throughout the year.

Metallurgical test work will continue in Q3, primarily for DeLamar heap leach and mill feed material. Load/permeability and optimization test work will be finalized. Final process throughputs will be determined. Mine design and haul road design, production scheduling, and process design will continue in earnest based on work completed and decisions made in Q2. A final determination of concentrate leach tailing handling from the mill will be made for the PFS.

7


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

Processing equipment lists and electrical load requirements will be determined, and engineering on the greater electrification of mining equipment will be advanced. Initial solar and micro grid design will be advanced to the PFS level in Q3. Engineering on the transmission line upgrades will also continue.

Additional drilling for metallurgical test work will be completed at Sullivan Gulch. Geotech drilling and condemnation drilling for the heap leach area will continue in Q3. Work will continue to classify potentially problematic mineralogy in the two deposits.

EXPLORATION

The Company increased its 2021 exploration program given the promising drilling results to date from Florida Mountain and BlackSheep. The Company added two core drill rigs and one RC drill rig in early Q2 and had four core drill rigs and one RC drill rig on site for most of the quarter. The Company recently reduced the amount of core rigs to three and returned the RC rig, largely due to slow assay turn-around from the laboratories.

The Company completed a total of 16,186 m of core drilling and 2,376 m of RC drilling this year for a total of 18,562 m drilled, including 11,308 m at Florida Mtn, 3,245 m at DeLamar deposit, and 4,008 m at BlackSheep.

The drilling program will focus on the following areas:

The Florida Mountain Deposit:

Drilling at Florida Mountain will be dual-focused, including follow-up exploration on the high-grade shoots and structures below the existing mineral resource and expanding the existing low-grade mineral resource through drilling geochemical and geophysical anomalies to the east and west of the existing mineral resource.

The Company has identified multiple high-grade gold-silver shoots at Florida Mountain. Integra's exploration team has modeled 7 high-grade vein structures that appear similar in size and orientation to the historically productive high-grade Trade Dollar - Black Jack vein system. Most historic underground production stemmed from the Trade Dollar - Black Jack vein, while the remaining 6 veins saw limited production up until mining operations ceased with the start of World War I. The identified vein zones have an aggregate strike length of over 7,000 m. Within these vein zones are steeply dipping high-grade shoots with strike lengths of up to 200 m and down dip extensions of up to 300 m which are interpreted as having developed at structural intersections. Based on recent drill intercepts, the Company anticipates that the high-grade shoots are likely to have widths of between 1 m and 8 m.

Drilling is also taking place in the Florida Keys area, a large geochemical anomaly located immediately to the east of the mineral resource that has seen limited drilling. The Florida Keys geochemical anomaly is of similar strength and size to the existing mineral resource estimate footprint at the Florida Mountain Deposit. The Company also intends to drill in Rich Gulch, a target located in a large zone of IP chargeability that was identified to the west of Florida Mountain as part of a 2020 geophysical survey. Based on limited historic drilling and the presence of historic underground workings in this area the Company sees potential for both additional low-grade and high-grade underground mineralization.

War Eagle Mountain:

During the 2019 and 2020 drill programs at War Eagle, the Company intersected high-grade gold-silver mineralization within the volcanic unit overlying the entire area. In 2020, the Company identified a second high-grade shoot 400 m to the north of the 2019 drill holes. This second structure is interpreted over a strike length of approximately 550 m south-southeast and is largely untested. The geochemical soil anomaly that led the Company to this new structure is interpreted as being lateral leakage outward along the base of the latite flow, presumably emanating from the eastern most structure identified in the 2020 drill program.

8


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

Drilling at War Eagle is expected to commence later this year and will continue to test these parallel structures.

BlackSheep and DeLamar (Henrietta Ridge):

The core drill campaign at BlackSheep will focus on the Georgianna, Milestone and Lucky Days targets. BlackSheep is host to extensive areas of sinter and opaline silica cut by high-level epithermal veining and brecciation. Due to the shallow level of erosion at BlackSheep, very limited exploration drilling completed by previous operators was shown to be too shallow to properly evaluate the potential for high-grade vein style mineralization.

Two shallow drill holes have been completed at the Georgianna target to better define the structures controlling mineralization. Deeper, follow-up drill holes are planned at the Georgianna target for this year to test the productive zone at approximately 200 m below the current surface.

The Company completed the Henrietta Ridge drilling and is awaiting results from BlackSheep. The Company anticipates follow-up drilling at BlackSheep in the last quarter of 2021.

SOCIAL AND ENVIRONMENTAL

Integra intends to publish its first ESG report in Q3 2021. This report will represent an important piece of ESG, which is the strengthening of the public disclosure of the performance surrounding Environment, Social, and Governance factors within a company. Our team has sought to track and measure many facets of our physical operation and Company that have never before been tracked in this manner. The value of this first annual report will both be in the information and data reported, but also equally in the lessons learned across the Company that will help shape future reports and help drive Company performance in ESG.

PROPERTIES

1.DeLamar Project, Idaho

The DeLamar Project consists of the neighboring DeLamar Deposit and Florida Mountain Deposit.

The bulk of the information in this section is derived from the Technical Report and Preliminary Economic Assessment for the DeLamar and Florida Mountain Gold - Silver Project, dated October 22, 2019 (the 'Report' or the 'PEA'). The DeLamar Report is available for review under the Company's issuer profile on SEDAR at www.sedar.com.

Project Description, Location and Ownership

The DeLamar project consists of 748 unpatented lode, placer, and millsite claims, and 16 tax parcels comprised of patented mining claims, as well as certain leasehold and easement interests, that cover approximately 8,100 hectares in southwestern Idaho, about 80 kilometers southwest of Boise. The property is approximately centered at 43°00′48″N, 116°47′35″W, within portions of the historical Carson (Silver City) mining district, and it includes the formerly producing DeLamar mine last operated by Kinross. The total annual land-holding costs are estimated to be US$321,626.

9


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

All mineral titles and permits are held by the DeLamar Mining Company ('DMC'), an indirect, 100% wholly owned subsidiary of Integra that was acquired from Kinross through a Stock Purchase Agreement in 2017.

A total of 284 of the unpatented claims were acquired from Kinross, 101 of which are subject to a 2.0% net smelter returns royalty ('NSR') payable to a predecessor owner. This royalty is not applicable to the current project mineral resources.

There are also six lease agreements covering 26 patented claims and one unpatented claim that require NSR payments ranging from 2.5% to 5.0%. One of these leases covers a small portion of the DeLamar area resources and one covers a small portion of the Florida Mountain area resources, with 5.0% and 2.5% NSRs applicable to maximums of US$50,000 and US$650,000 in royalty payments, respectively.

The property includes 1,355 hectares under six leases from the State of Idaho, which are subject to a 5.0% production royalty of gross receipts plus annual payments of US$23,252. One of these leases has been issued and five are pending issuance. The State of Idaho leases include very small portions of both the DeLamar and Florida Mountain resources.

Kinross has retained a 2.5% NSR royalty that applies to those portions of the DeLamar area claims that are unencumbered by the royalties outlined above (the 'Kinross Royalty'). The Kinross Royalty was subsequently purchased by Maverix Metals Inc ('Maverix') on December 19, 2019. The Maverix royalty applies to more than 90% of the current DeLamar area resources, but this royalty will be reduced to 1.0% upon Maverix receiving total royalty payments of C$10,000,000.

DMC also owns mining claims and leased lands peripheral to the DeLamar project described above. These landholdings are not part of the DeLamar project, although some of the lands are contiguous with those of the DeLamar and Florida Mountain claims and state leases.

The DeLamar project historical open-pit mine areas have been in closure since 2003. Even though a substantial amount of reclamation and closure work has been completed to date at the site, there remain ongoing water-management activities and monitoring and reporting. A reclamation bond of US$2,890,429 remains with the Idaho Department of Lands ('IDL') and a reclamation bond of US$100,000 remains with the Idaho Department of Environmental Quality. A reclamation bond in the amount of US$569,500 has been placed with the U.S. Bureau of Land Management ('BLM') for exploration activities on public lands.

Exploration and Mining History

Total production of gold and silver from the DeLamar - Florida Mountain project area is estimated to be approximately 1.3 million ounces of gold and 70 million ounces of silver from 1891 through 1998, with an unknown quantity produced at the DeLamar mill in 1999, and recorded production may have occurred from 1876 to 1891. This includes an estimated 1.025 million ounces of gold and 51 million ounces of silver produced from the original De Lamar underground mine and the later DeLamar open-pit operations. At Florida Mountain, nearly 260,000 ounces of gold and 18 million ounces of silver were produced from the historical underground mines and late 1990s open-pit mining.

Mining activity began in the area of the DeLamar project when placer gold deposits were discovered in 1863 in Jordan Creek, just upstream from what later became the town site of De Lamar. During the summer of 1863, the first silver-gold lodes were discovered in quartz veins at War Eagle Mountain, to the east of Florida Mountain, resulting in the initial settlement of Silver City. Between 1876 and 1888, significant silver-gold veins were discovered and developed in the district, including underground mines at De Lamar Mountain and Florida Mountain. A total of 553,000 ounces of gold and 21.3 million ounces of silver were reportedly produced from the De Lamar and Florida Mountain underground mines from the late 1800s to early 1900s.

The mines in the district were closed in 1914 and very little production took place until the gold and silver prices increased in the1930s. Placer gold was again recovered from Jordan Creek from 1934 to 1940, and in 1938 a 181 tonne-per-day flotation mill was constructed to process waste dumps from the De Lamar underground mine. The flotation mill reportedly operated until the end of 1942. Including Florida Mountain, the De Lamar - Silver City area is believed to have produced about 1 million ounces of gold and 25 million ounces of silver from 1863 through 1942.

10


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

During the late 1960s, the district began to undergo exploration for near-surface bulk-mineable gold-silver deposits, and in 1977 a joint venture operated by Earth Resources Company ('Earth Resources') began production from an open-pit milling and cyanide tank-leach operation at De Lamar Mountain, known as the DeLamar mine. In 1981, Earth Resources was acquired by the Mid Atlantic Petroleum Company ('MAPCO'), and in 1984 and 1985 the NERCO Mineral Company ('NERCO') successively acquired the MAPCO interest and the entire joint venture to operate the DeLamar mine with 100% ownership. NERCO was purchased by the Kennecott Copper Company ('Kennecott') in 1993. Two months later in 1993, Kennecott sold its 100% interest in the DeLamar mine and property to Kinross, and Kinross operated the mine, which expanded to the Florida Mountain area in 1994. Mining ceased in 1998, milling ceased in 1999, and mine closure activities commenced in 2003. Closure and reclamation were nearly completed by 2014, as the mill and other mine buildings were removed and drainage and cover of the tailings facility were developed.

Total open-pit production from the DeLamar project from 1977 through 1998, including the Florida Mountain operation, is estimated at approximately 750,000 ounces of gold and 47.6 million ounces of silver, with an unknown quantity produced at the DeLamar mill in 1999. From start-up in 1977 through to the end of 1998, open-pit production in the DeLamar area totaled 625,000 ounces of gold and about 45 million ounces of silver. This production came from pits developed at the Glen Silver, Sommercamp - Regan (including North and South Wahl), and North DeLamar areas. In 1993, the DeLamar mine was operating at a mining rate of 27,216 tonnes per day, with a milling capacity of about 3,629 tonnes per day. In 1994, Kinross commenced open-pit mining at Florida Mountain while continuing production from the DeLamar mine. The ore from Florida Mountain, which was mined through 1998, was processed at the DeLamar facilities. Florida Mountain production in 1994 through 1998 totaled 124,500 ounces of gold and 2.6 million ounces of silver.

Geological and Mineralization

The DeLamar project is situated in the Owyhee Mountains near the east margin of the mid-Miocene Columbia River - Steens flood-basalt province and the west margin of the Snake River Plain. The Owyhee Mountains comprise a major mid-Miocene eruptive center, generally composed of mid-Miocene basalt flows intruded and overlain by mid-Miocene rhyolite dikes, domes, flows and tuffs, developed on an eroded surface of Late Cretaceous granitic rocks.

The DeLamar mine area and mineralized zones are situated within an arcuate, nearly circular array of overlapping porphyritic and flow-banded rhyolite flows and domes that overlie cogenetic, precursor pyroclastic deposits erupted as local tuff rings. Integra interprets the porphyritic and banded rhyolite flows and latites as composite flow domes and dikes emplaced along regional-scale northwest-trending structures. At Florida Mountain, flow-banded rhyolite flows and domes cut through and overlie a tuff breccia unit that overlies basaltic lava flows and Late Cretaceous granitic rocks.

Gold-silver mineralization occurred as two distinct but related types: (i) relatively continuous, quartz-filled fissure veins that were the focus of late 19th and early 20th century underground mining, hosted mainly in the basalt and granodiorite and to a lesser degree in the overlying felsic volcanic units; and (ii) broader, bulk-mineable zones of closely-spaced quartz veinlets and quartz-cemented hydrothermal breccia veins that are individually continuous for only a few feet laterally and vertically, and of mainly less than 1.3 centimeters in width - predominantly hosted in the rhyolites and latites peripheral to and above the quartz-filled fissures. This second style of mineralization was mined in the open pits of the late 20th century DeLamar and Florida Mountain operations, hosted primarily by the felsic volcanic units.

The fissure veins mainly strike north to northwest and are filled with quartz accompanied by variable amounts of adularia, sericite or clay, ± minor calcite. Vein widths vary from a few centimeters to several meters, but the veins persist laterally and vertically for as much as several hundreds of meters. Principal silver and gold minerals are naumannite, aguilarite, argentite, ruby silver, native gold and electrum, native silver, cerargyrite, and acanthite. Variable amounts of pyrite and marcasite with very minor chalcopyrite, sphalerite, and galena occur in some veins. Gold- and silver-bearing minerals are generally very fine grained.

11


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

The gold and silver mineralization at the DeLamar project is best interpreted in the context of the volcanic-hosted, low-sulfidation type of epithermal model. Various vein textures, mineralization, alteration features, and the low contents of base metals in the district are typical of shallow low-sulfidation epithermal deposits worldwide.

Drilling, Database and Data Verification

As of the effective date of this report, the resource database includes data from 2,718 holes, for a total of 306,078 meters, that were drilled by Integra and various historical operators at the DeLamar and Florida Mountain areas. The historical drilling was completed from 1966 to 1998 and includes 2,625 holes for a total of 275,790 meters of drilling. Most of the historical drilling was done using reverse-circulation ('RC') and conventional rotary methods; a total of 106 historical holes were drilled using diamond-core ('core') methods for a total of 10,845 meters. Approximately 74% of the historical drilling was vertical, including all historical conventional rotary holes.

Integra commenced drilling in 2018. As of the end of April 2019, Integra had drilled a total of 55 RC holes, 36 core holes, and 11 holes commenced with RC and finished with core tails, for a total of 33,573 meters in the DeLamar and Florida Mountain areas combined. All but one of the Integra holes were angled.

The historical portions of the current resource drill-hole databases for the DeLamar and Florida Mountain deposit areas were originally created by MDA using original DeLamar mine digital database files, and this information was subjected to various verification measures by both MDA and Integra. The Integra portion of the drill-hole databases was directly created by MDA using original digital analytical certificates in the case of the assay tables, or it was checked against original digital records in the case of the collar and down-hole deviation tables. Through these and other verification procedures summarized herein, the authors have verified that the DeLamar data as a whole are acceptable as used in this report.

Metallurgical Testing

Available results from ongoing metallurgical testing by Integra, at McClelland Laboratories (2018-2019) have been used to select preferred processing methods and estimate recoveries for oxide and transitional material types from both the DeLamar and Florida Mountain deposits, as well as unoxidized (sulfide) material type from the Florida Mountain deposit. Metallurgical testing has also been conducted on unoxidized (sulfide) material from the DeLamar deposit, but that testing has not yet progressed to the level required for processing of that material to be included in the PEA.

Samples used for this 2018-2019 testing, primarily composites of 2018 and 2019 drill core, were selected to represent the various material types contained in the current resources from both the DeLamar and Florida Mountain deposits. Composites were selected to evaluate effects of area, depth, grade, oxidation, lithology, and alteration on metallurgical response. In general, test results indicate that materials from each of the DeLamar and Florida Mountain deposits can most usefully be evaluated by considering the oxidation state (oxidized, transitional, or unoxidized).

Bottle-roll and column-leach cyanidation testing on drill core composites from both the DeLamar and Florida Mountain deposits and on bulk samples from the DeLamar deposit have shown that the oxide and transitional material types from both deposits can be processed by heap-leach cyanidation. Testing on drill core composites from the Florida Mountain deposit has shown that the unoxidized material from that deposit is not amenable to heap leach cyanidation but can be leached using cyanide after grinding. The Florida Mountain unoxidized material also responds well to bulk sulfide flotation treatment, and the resulting flotation concentrate is amenable to agitated cyanide leaching. Highest recoveries from the Florida Mountain unoxidized material were obtained by grinding, followed by gravity concentration and flotation of the gravity tailings, with regrind and agitated cyanidation of the flotation concentrate.

Available metallurgical test results indicate that gold recoveries in the range of 75% to 80%, and silver recoveries of about 30%, can be expected from the DeLamar oxide and transitional material types, by heap leaching at a crush size of 80% -13mm. Agglomeration pretreatment of this material is currently planned, because of the potential for processing of some materials with elevated clay content. Heap leach cyanide consumptions are expected to be reasonably low (about 0.3 - 0.4 kg NaCN/tonne).

12


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

In the case of the Florida Mountain oxide and transitional material types, gold recoveries of 85% to 90%, and silver recoveries of about 40%, are expected for heap leaching at an 80% -38mm feed size. Agglomeration pretreatment is not considered to be necessary for these material types. Heap leach cyanide consumptions are expected to be reasonably low (about 0.4 kg NaCN/tonne).

Planned processing of the Florida Mountain unoxidized material type includes grinding, followed by gravity concentration and flotation of the gravity tailings, with regrind and agitated cyanidation of the flotation concentrate. Expected recoveries are about 90% gold and 80% silver. Cyanide consumption for the concentrate leaching is expected to be equivalent to about 0.2 kg NaCN/tonne, on a mill feed basis.

In the case of the unoxidized material from the DeLamar deposit, 2018-2019 testing has shown that this material type is not amenable to heap-leach cyanidation and is highly variable with respect to response to grinding followed by agitated cyanidation. Reasons for the generally poor and highly variable grind-leach recoveries from this material type are poorly understood at present. Additional testing and mineralogy studies are in progress to gain a better understanding of the observed variability in recoveries. Further testing is also planned to better define what portion of the DeLamar unoxidized material type might be economically processed by simple grind-leach processing. Metallurgical testing has also shown that the DeLamar unoxidized material generally responds well to upgrading by gravity and flotation processing. Testing to evaluate subsequent processing of the resulting concentrate is in progress, but has not been completed as of the effective date of this report. It is expected that flotation concentrate produced from a significant portion of the DeLamar unoxidized materials will not be amenable to agitated leach (cyanidation). It is expected that for these flotation concentrates, some form of oxidative pre-treatment (such as pressure oxidation or roasting) will be required to maximize gold recovery by cyanidation. Alternatively, these concentrates could be shipped off site for toll processing.

Mineral Resources

Mineral resources have been estimated for both the Florida Mountain and DeLamar areas of the DeLamar project. The gold and silver resources were modeled and estimated by:

  • evaluating the drill data statistically;
  • creating low- (domain 100), medium- (domain 200) and high-grade (domain 300) mineral-domain polygons for both gold and silver on sets of cross sections spaced at 30-meter intervals;
  • projecting the sectional mineral-domain polygons three-dimensionally to the drill data within each sectional window;
  • slicing the three-dimensional mineral-domain polygons along 6-meter-spaced horizontal and vertical planes and using these slices to recreate the gold and silver mineral-domain polygons on level plans and long sections, respectively;
  • coding a block model to the gold and silver domains for each of the two deposit areas using the level-plan and long-section mineral-domain polygons;
  • analyzing the modeled mineralization geostatistically to aid in the establishment of estimation and classification parameters; and
  • using inverse-distance to the third power to interpolate grades into models comprised of 6x6x6-meter blocks using the gold and silver mineral domains to explicitly constrain the grade estimations.

13


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

Parameters used in the estimation of gold and silver grades are summarized in Table 1.

Table 1 - Summary of DeLamar Area Grade Estimation Parameters

Estimation Pass - Au + Ag Domain

Search Ranges (meters)

Composite Constraints

Major

Semi-Major

Minor

Min

Max

Max/Hole

Pass 1 + 2 - Doman 100

60

60

30

2

12

4

Pass 1 + 2 - Doman 200 + 300 + 0

60

60

30

2

20

4

Pass 3 - Doman 0 + 100 + 200 +300

170

170

170

1

20

4


Restrictions on Search Ranges

Domain

Search Restriction Threshold

Search Restriction Distance

Estimation Pass

Au 100

>0.7 g Au/t

40 meters

1, 2

Au 300

>20 g Au/t

35 meters

1, 2, 3

Ag 300

>400 g Ag/t

35 meters

1, 2, 3

Au 0

>0.5 g Au/t

6 meters

1, 2, 3

Ag 0

>34.29 g Ag/t

9 meters

1, 2, 3

The estimation passes were performed independently for each of the mineral domains, so that only composites coded to a particular domain were used to estimate grade into blocks coded by that domain. The estimated grades for each gold and silver domain coded to a block were then coupled with the partial percentages of those mineral domains in the block, as well as the outside, dilutionary, domain 0 grades and volumes, to enable the calculation of a single volume-averaged gold and a single volume-averaged silver grade for each block. These single resource block grades, and their associated resource tonnages, are therefore fully block-diluted using this methodology.

The search restrictions place limits on the maximum distances from a block that high-grade population composites can be 'found' and used in the interpolation of gold and/or silver grades into a block. To further avoid the smearing of outlier high grades that are sporadically present in the low-grade gold and silver domains, the maximum number of composites allowed for the estimation in Pass 1 and Pass 2 are less than that used for the higher-grade interpolations.

The gold and silver mineralization commonly exhibits multiple orientations, which led to the use of a number of search orientations to control both the DeLamar and Florida Mountain estimations.

Grade interpolation was completed using length-weighted 3.05-meter (10-foot) composites. The estimation passes were performed independently for each of the mineral domains, so that only composites coded to a particular domain were used to estimate grade into blocks coded to that domain. Blocks coded as having partial percentages of more than one gold and/or silver domain had multiple grade interpolations, one for each domain coded into the block for each metal. The estimated grades for each gold and silver domain coded to a block were coupled with the partial percentages of those mineral domains in the block, as well as any outside, dilutionary, domain 0 grades and volumes, to enable the calculation of a single volume-averaged gold and a single volume-averaged silver grade for each block. These single final resource block grades, and their associated resource tonnages, are therefore fully block-diluted using this methodology.

The DeLamar project mineral resources have been estimated to reflect potential open-pit extraction and processing by a combination of heap leaching, milling / agitated leaching, and flotation. To meet the requirement of the in-pit resources having reasonable prospects for eventual economic extraction, pit optimizations for the DeLamar and Florida Mountain deposit areas were run using the parameters summarized in Table 2 and Table 3.

14


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

Table 2 - Pit Optimization Cost Parameters (US$)

Table 3 - Pit-Optimization Metal Recoveries by Deposit and Oxidation State

The pit shells created using these optimization parameters were applied to constrain the project resources of both the DeLamar and Florida Mountain deposit areas. The in-pit resources were further constrained by the application of a gold-equivalent cutoff of 0.2 g/t to all model blocks lying within the optimized pits that are coded as oxidized or transitional, and 0.3 g/t for blocks coded as unoxidized. Gold equivalency, as used in the application of the resource cutoffs, is a function of metal prices (Table 2) and metal recoveries, with the recoveries varying by deposit and oxidation state (Table 3).

The total DeLamar project resources, which include the resources for both the DeLamar and Florida Mountain areas, are summarized in Table 4. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Table 4 - Total DeLamar Project Gold and Silver Resources

15


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

1. Mineral Resources are comprised of all oxidized and transitional model blocks at a 0.2 g AuEq/t cutoff and all unoxidized blocks at a 0.3 g AuEq/t that lie within optimized pits

2. The effective date of the resource estimations is May 1, 2019

3. Mineral resources that are not mineral reserves do not have demonstrated economic viability

4. Rounding may result in apparent discrepancies between tonnes, grade, and contained metal content

The gold and silver resources for the DeLamar and Florida Mountain areas are reported separately in Table 5 and Table 6, respectively.

Table 5 - DeLamar Deposit Gold and Silver Resources

1. Mineral Resources are comprised of all oxidized and transitional model blocks at a 0.2 g AuEq/t cutoff and all unoxidized blocks at a 0.3 g AuEq/t that lie within optimized pits

2. The effective date of the resource estimations is May 1, 2019

3. Mineral resources that are not mineral reserves do not have demonstrated economic viability

4. Rounding may result in apparent discrepancies between tonnes, grade, and contained metal content

Table 6 - Florida Mountain Deposit Gold and Silver Resources

1. Mineral Resources are comprised of all oxidized and transitional model blocks at a 0.2 g AuEq/t cutoff and all unoxidized blocks at a 0.3 g AuEq/t that lie within optimized pits

2. The effective date of the resource estimations is May 1, 2019

3. Mineral resources that are not mineral reserves do not have demonstrated economic viability

4. Rounding may result in apparent discrepancies between tonnes, grade, and contained metal content

Mining Methods

The PEA considers open-pit mining of the DeLamar and Florida Mountain gold-silver deposits. Note that a PEA is preliminary in nature and includes Inferred mineral resources that are considered too speculative geologically to have the economic considerations applied that would enable them to be classified as mineral reserves. There is no certainty that the economic results of the PEA will be realized.

The methodology used for mine planning to define the economics for the PEA includes definition of economic parameters, pit optimization, creation of pit and waste rock facility designs, creation of production schedules, definition of personnel and equipment requirements, estimation of capital and operating costs, and performance of an economic analysis.

Pit optimization assumed processing of Florida Mountain and DeLamar oxide and transition resources as heap leach, and unoxidized Florida Mountain resources as milled using floatation followed by cyanidation of the concentrates on site. Leach material would be processed at 27,000 tonnes per day and mill material would be processed at 2,000 tonnes per day. Processing of the DeLamar material will require crushing and agglomeration prior to heap leaching.

16


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

The resulting pit optimizations were used as the basis for pit designs. The designs used an inner-ramp slope of 45°. DeLamar pit designs utilized five pit phases to establish a mining sequence and Florida Mountain pit designs were completed using three pit phases.

Waste management facility designs were created for the PEA to contain the waste material mined from both the DeLamar and Florida Mountain areas. Some waste material may also be stored in the form of backfill where and when space is available, although this has not been assumed for the PEA and therefore this is a potential opportunity for the project.

Production scheduling was completed with leaching starting with Florida Mountain material and DeLamar leach material being processed starting in year 5 at the same rate as Florida Mountain leach material. Florida Mountain unoxidized material will be stockpiled until the flotation mill is constructed. The start of the 2,000 tonne per day mill will be in year 3 and it will operate at a rate of 720,000 tonnes per year until unoxidized material is exhausted.

The total project mining rate is given a reasonable ramp-up that starts at 2,000 tonnes per day and increases to a life-of-mine maximum of 90,000 tonnes per day in later years.

The PEA has assumed owner mining in order to keep operating costs lower than it would be with contract mining. The production schedule was used along with additional efficiency factors, cycle times, and productivity rates to develop the first-principle hours required for primary mining equipment to achieve the production schedule. Mining anticipates 136-tonne capacity haul trucks loaded by hydraulic shovels. Personnel requirements have been estimated based on the number of people required to operate, supervise, maintain, and plan for operations to achieve the production schedule.

Processing and Recovery Methods

The PEA envisions the use of two process methods for the recovery of gold and silver:

1)Lower-grade oxide and transition materials from both DeLamar and Florida Mountain will be processed by crushed-ore cyanide heap leaching with stacking on a central heap leach by conveyor, followed by Merrill-Crowe zinc precipitation.

2)Higher-grade unoxidized material from Florida Mountain will be processed using grinding followed by gravity and flotation concentration, with the concentrates processed by regrinding, agitated-cyanide leaching, counter-current decantation ('CCD'), and Merrill-Crowe zinc precipitation. Flotation tailings will be thickened, filtered, and dry stacked at the tailings storage facility. Concentrate-leach tailings will be added to the heap-leach circuit for further recovery of gold and silver.

Both Florida Mountain and DeLamar oxide and transition ore types have been shown to be amenable to heap-leach processing following crushing. Material will be crushed in two stages to a nominal 100 millimeter size at a rate of 27,000 tonnes per day. Initially, for the Florida Mountain materials, the product of the secondary circuit will be a nominal size of 38 millimeters. Transitioning to DeLamar ore types will require the addition of a tertiary crushing circuit with tertiary screens and cone crushers operating in closed circuit to produce a nominal 13-millimeter product followed by cement agglomeration. Lime will be added to the crushed ore for pH control at a dosage of 1 kilogram/tonne. Cement will be added at 3 kilograms/tonne for agglomeration as required.

Crushed and prepared ore will be transferred to the heap-leach pad using overland conveyors and stacked on the heap using portable or grasshopper conveyors and a radial stacking system. Leach solution will be collected at the base on the heap leach and transferred to the Merrill-Crowe processing plant for recovery of precious metals by zinc precipitation. The zinc precipitate will be filtered, dried, and smelted to produce a precious metal doré product for shipment off site.

Gold and silver recoveries are expected to be 90% and 40%, respectively, for the Florida Mountain oxide heap-leach material. The DeLamar oxide recoveries used in this study are 80% for gold and 30% for silver. Cyanide consumptions for the oxide ore types are 0.4 kilograms/tonne and 0.3 kilograms/tonne for Florida Mountain and DeLamar, respectively.

17


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

Transition material gold recoveries are projected to be 85% for Florida Mountain and 75% for DeLamar. Silver recoveries for the transition material are projected to be 40% and 30% for Florida Mountain and DeLamar, respectively. Projected cyanide consumption is 0.4 kilograms per tonne for both the Florida Mountain and DeLamar transition material types.

Higher-grade Florida Mountain unoxidized material will be processed by crushing, grinding, gravity, and flotation concentration, followed by cyanide leaching of the concentrates using CCD and Merrill-Crowe precipitation. This circuit is scheduled to operate at a nominal production rate of 2,000 tonnes per day. For this process, the final crusher product will have a nominal particle size of 6 millimeters and will be fed to the ball mill via two belt feeders at a nominal ore production rate of 88 tonnes per hour. The ball mill discharge will be pumped to a set of two hydrocyclones, one operating and one standby, with the cyclone overflow reporting to the flotation conditioning tank. The cyclone underflow will report to a centrifugal gravity concentrator. Concentrator rejects then reports back to the ball mill for additional grinding. The gravity concentrate will report to the concentrate regrind mill for subsequent processing in the leach circuit.

The flotation feed from the conditioning tank will report to the flotation circuit for sulfide concentration. The flotation concentrate will report to a regrind circuit where it will be ground to a nominal 37 µm before being leached in a conventional leach tank and CCD circuit. The flotation tailings are to be thickened and filtered with the filter cake reporting to the dry stacked tailings storage facility.

Leach solid residue and the pregnant leach solution are separated in the CCD circuit. The pregnant leach solution will report to the heap leach Merrill-Crowe circuit where it will be processed using zinc precipitation for the recovery of gold and silver. The leached residue will be thickened to 60% solids and added to the heap leach material before it is stacked on the heap, thus allowing for additional processing and mitigating the need for a cyanide-rated tailings storage facility.

Recoveries from the Florida Mountain milling/concentrator circuit are expected to be 90% for gold and 80% for silver. Sodium cyanide and lime consumptions are both expected at 0.2 kilograms per tonne of material feed.

Capital and Operating Costs

Table 7 summarizes the estimated life-of-mine ('LOM') capital costs for the project. The LOM total capital costs are estimated at US$270.3 million, including US$161.0 million in preproduction capital (including working capital) and US$109.3 million for sustaining capital (which includes US$20.0 million in reclamation costs).

Table 8 shows the estimated LOM operating costs for the project, which are estimated to be US$7.82 per tonne processed. This includes mining costs which are estimated to be US$2.00 per tonne mined. The total cash cost is estimated to be US$619 per ounce of gold equivalent and all-in sustaining costs are estimated to be US$742 per ounce of gold equivalent. See 'Non-GAAP Measures' disclosure at the end of this MD&A.

18


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

Table 7 Capital Cost Summary (US$)

Sustaining Total
Mine Pre-Production (1) Yr 1 to Yr 10 (1) LOM (1)
Mining Equipment $ 32,980 $ 52,014 $ 84,994
Pre-Stripping $ 7,514 $ - $ 7,514
Other Mine Capital $ 6,027 $ 746 $ 6,773
Sub-Total Mine $ 46,521 $ 52,760 $ 99,281
Processing
Heap Leach Pad $ 14,130 $ 19,178 $ 33,308
Heap leach Plant (Incl Crushing and Stacking) $ 48,449 $ - $ 48,449
Heap leach: Agglomeration / Crushing (DeLamar Ore) $ - $ 20,518 $ 20,518
Florida Mill: Plant $ - $ 34,354 $ 34,354
Florida Mill: Dry Stack Tailings $ - $ 6,990 $ 6,990
Sub-Total Processing $ 62,579 $ 81,039 $ 143,618
Infrastructure
Power $ 21,714 $ - $ 21,714
Assay Lab $ 2,804 $ - $ 2,804
Other $ 2,552 $ 974 $ 3,526
Sub-Total Infrastructure $ 27,070 $ 974 $ 28,044
Owner's Costs $ 5,819 $ - $ 5,819
SUB-TOTAL $ 141,989 $ 134,773 $ 276,761
Other
Working Capital(2) $ 13,024 $ (13,024 ) $ -
Cash Deposit for Reclamation Bonding(3) $ 6,000 $ (6,000 ) $ -
Salvage Value(4) $ - $ (26,426 ) $ (26,426 )
TOTAL $ 161,013 $ 89,323 $ 250,336
Reclamation $ - $ 20,000 $ 20,000
Total Including Reclamation Costs $ 161,013 $ 109,323 $ 270,336

(1)Capital costs include contingency and EPCM costs;

(2)Working capital is returned in year 11;

(3)Cash deposit = 30% of bonding requirement. Released once reclamation is completed;

(4)Salvage value for mining equipment and plant; and

(5)Reclamation costs listed here are treated as operating costs in the economic evaluation.

Table 8 Operating and Total Cost Summary (US$)

USD / Tonne
LOM Operating Costs Mined Processed
Mining $ 2.00 $ 4.18
Processing $ 3.08
G&A $ 0.55
Total Site Costs $ 7.82
LOM Cash Costs and All-in Sustaining Costs By-Product (1) Co-Product (2)
Mining $ 380 $ 317
Processing $ 280 $ 233
G&A $ 50 $ 42
Total Site Costs $ 711 $ 592
Transport & Refining $ 13 $ 11
Royalties $ 17 $ 14
Total Cash Costs $ 741 $ 617
Silver By-Product Credits $ (272 ) $ -
Total Cash Costs Net of Silver by-Product $ 469 $ 617
Sustaining Capital $ 131 $ 109
Reclamation $ 19 $ 16
All-in Sustaining Costs $ 619 $ 742

(1)By-Product costs are shown as US dollars per gold ounces sold with silver as a credit; and

(2)Co-Product costs are shown as US dollars per gold equivalent ounce.

19


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

Preliminary Economic Analysis

MDA has prepared this PEA for the DeLamar mining project, which includes operations at both the DeLamar and Florida Mountain deposits. A summary of the PEA results is shown in Table 9.

Table 9 Preliminary Economic Analysis Summary

After-tax NPV (5%)

K USD

$357,572

After-tax NPV (8%)

K USD

$284,448

After-tax NPV (10%)

K USD

$244,454

After-tax IRR

%

43%

After-Tax Payback Period

Years

2.35

Note that a preliminary economic assessment is preliminary in nature and it includes Inferred mineral resources that are considered too speculative geologically to have the economic considerations applied that would enable them to be classified as mineral reserves. There is no certainty that the PEA will be realized. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

Some economic highlights include:

  • Initial construction period is anticipated to be 18 months;
  • After-tax net present value ('NPV') (5%) of US$358 million with a 43% after-tax internal rate of return ('IRR') using US$1,350 and US$16.90 per ounce gold and silver prices, respectively;
  • After-tax payback period of 2.35 years;
  • Year 2 to 6 gold equivalent production of 148,000 ounces (126,000 oz Au and 1,796,000 oz Ag); and
  • Year 1 to 10 gold equivalent average production of 124,000 ounces (103,000 oz Au and 1,660,000 oz Ag);
  • After-tax LOM cumulative cash flows of US$528 million; and
  • Average annual after-tax free cash flow of US$61 million once in production.

2.BlackSheep District, Idaho

On February 14, 2019, Integra announced the acquisition of a highly prospective trend of multiple epithermal centers 6 km to the northwest of the DeLamar Project, a trend now referred to as the BlackSheep District ('BlackSheep' or the 'District'). The District was identified in part during site visits and research by renowned epithermal geologists Dr. Jeff Hedenquist and Dr. Richard Sillitoe. Dr. Sillitoe and Dr. Hedenquist, along with Integra's exploration team led by Dr. Max Baker, mapped the area and interpreted the District to have undergone very limited erosion since the mid-Miocene mineralization event, suggesting the productive zone of mineralization is potentially located approximately 200 m beneath the surface. Minimal historical exploration did encounter gold-silver in BlackSheep; however, historic drilling was shallow, less than 100 m vertical on average, and did not enter the theorized productive zone.

The BlackSheep District to the northwest of DeLamar is comparable in geographical size to both the DeLamar and Florida Mountain Deposits combined. The nature of the mineralization and alteration in BlackSheep includes extensive sinter deposits surrounding centers of hydrothermal eruption breccia vents associated with high-level coliform banded amorphous to chalcedonic silica with highly anomalous gold, silver arsenic, mercury, antimony and selenium values. In addition to some preliminary rock chip sampling, Integra completed an extensive soil geochemistry grid over the BlackSheep District showing highly anomalous gold and silver trends over significant lengths.

The Company commenced an extensive regional exploration program at BlackSheep in 2019. This regional exploration program included:

  • Additional rock-chip sampling and prospect scale mapping
  • A regional airborne magnetic and radiometric survey
  • Commissioning of the Idaho Geology Department to undertake 1:24,000 scale geological mapping of the DeLamar, Florida Mountain and BlackSheep Districts

20


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020
  • Induced polarization ('IP') survey currently underway

See 'Q2 2021 in Review' and '2021 Outlook' sections above for further details on recent exploration work.

3.War Eagle Property, Idaho

On January 21, 2019, Integra announced that, through its wholly owned subsidiary, DeLamar Mining Company, it entered into an option agreement with Nevada Select Royalty, Inc. ('Nevada Select'), a wholly owned subsidiary of Ely Gold Royalties, Inc ('Ely Gold') to acquire Nevada Select's interest in a State of Idaho Mineral Lease encompassing the War Eagle gold-silver Deposit ('War Eagle') situated 3 km east of Integra's Florida Mountain Deposit. On June 21, 2021, Gold Royalty Corp. ('GRC') and Ely Gold announced that they have entered into a definitive agreement pursuant to which GRC will acquire all of the issued and outstanding common shares of Ely Gold by way of a statutory plan of arrangement under the Business Corporations Act (British Columbia). The companies are working towards closing the transaction in the third quarter of 2021.

In the War Eagle Mountain District, Integra had previously acquired the Carton Claim group comprising of six patented mining claims covering 45 acres and located 750 m north of the State Lease.

War Eagle Mountain has a rich history of high-grade gold-silver production dating back to the late 1800's. The War Eagle-Florida-DeLamar geological settings, all hosting low sulphidation epithermal gold-silver are genetically related to the same mineralization forming event that occurred roughly 16 million years ago. The local geology and ore mineralogy found within the low sulphidation epithermal veins on War Eagle Mountain are similar to the regimes found at DeLamar and Florida Mountain to the west. The key difference is the host rock. Historically mined gold and silver in high grade veins at War Eagle was predominately mined and hosted by late Cretaceous age granitic rock. It should be noted that historically, the veins of War Eagle Mountain were of far higher grade compared to any other mining operations in the district, including DeLamar and Florida Mountain. Past production on these high-grade vein systems has outlined strike lengths in excess of 1 km and depth extents of up to 750 meters or more.

The following table highlights several of the best intercepts drilled by previous explorers of War Eagle Mountain, as described in historic drill data tabulations.

Drill Hole ID

From (m)

To
(m)

Interval
(m)(1)

g/t AuEq(2)

W14

incl

131.06

131.06

213.36

134.11

82.30

3.05

4.07

32.04

W02

56.39

62.48

6.09

9.49

W03

175.26

182.88

7.62

9.28

W06

146.30

147.83

1.52

55.03

W40

68.58

92.96

24.38

8.45

W40

incl

152.40

166.12

195.07

176.78

42.67

10.67

8.83

19.19

W51

124.97

132.59

7.62

8.04

1.The historic drill data reported in this release was developed by previous operators of the War Eagle Project prior to the introduction of NI43-101. Historic drill intersections are reported as drilled thicknesses. True widths of the mineralized intervals are estimated to be less than 75% of the reported widths. The historic drill data was sourced from historic reports by various operators' exploration and production data and reports. Integra Resources is providing this historic data for informational purposes only, and gives no assurance as to its reliability or relevance. Integra Resources has not completed any quality assurance program or applied quality control measures to the historic data. Accordingly, the historic data should not be relied upon.

2.Gold equivalent = g Au/t + (g Ag/t ÷ 85)

See 'Q2 2021 in Review' and '2021 Outlook' sections above for further details on recent exploration work.

21


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

SELECTED CONSOLIDATED FINANCIAL INFORMATION

The following table sets forth selected consolidation information of the Company as of June 30, 2021, December 31, 2020, and December 31, 2019, prepared in accordance with IFRS. The selected consolidated financial information should be read in conjunction with the Company's audited annual consolidated financial statements and unaudited interim condensed consolidated financial statements for the three and six-month periods ended June 30, 2021.

Six-Months Ended

June 30, 2021

$

Year Ended
December 31, 2020

$

Year Ended

December 31, 2019

$

Exploration and evaluation expenses

(14,549,470)

(17,135,991)

(13,433,489)

Operating loss

(18,936,512)

(25,674,240)

(20,281,662)

Other income (expense)

(1,257,474)

(1,489,377)

(1,371,387)

Net loss

(20,193,986)

(27,163,617)

(21,653,049)

Net loss per share

(0.37)

(0.54)

(0.64)

Other comprehensive income (loss)

(448,115)

(170,070)

(861,523)

Comprehensive loss

(20,642,101)

(27,333,687)

(22,514,572)

Cash and cash equivalents

19,628,906

37,000,648

31,323,346

Restricted cash, long-term

23,001

23,100

1,928,641

Exploration and evaluation assets

63,881,665

72,330,024

61,348,921

Total assets

89,434,089

113,584,204

97,714,711

Total current liabilities

9,103,327

7,246,586

4,445,062

Total non-current liabilities

44,900,906

53,084,571

42,710,061

Working capital

12,445,668

30,630,454

27,587,579

The operating losses for the six-months ended June 30, 2021, and the years ended December 31, 2020 and December 31, 2019 were mostly driven by exploration and evaluation expenses, as well as head office and site G&A expenses such as compensation, office, professional fees, regulatory fees, and stock-based compensation (non-cash) expenses.

Other expenses for the six-months ended June 30, 2021, and the years ended December 31, 2020 and December 31, 2019 were mostly due to foreign exchange loss/income and reclamation accretion expenses, partly offset by interest and rent income.

Other comprehensive income (loss) amounts are related to the foreign exchange translation adjustment.

Total assets in the current six-month period ended June 30, 2021 decreased compared to the year ended December 31, 2020, mostly due to cash decrease (mostly as a result of exploration and development activities) and a decrease in exploration and evaluation assets (resulting from a reclamation adjustment). Total assets in the year ended December 31, 2020 increased compared to the year ended December 31, 2019, mostly due to cash increase (as a result of the Company's September 2020 financing), and an increase in exploration and evaluation assets (resulting from a reclamation adjustment), and property, plant and equipment additions.

Working capital in the current six-month period decreased compared to the year ended December 31, 2020 due to a decrease in cash and an increase in payables in the current period. Working capital in the year ended December 31, 2020 increased compared to the year ended December 31, 2019, mostly due to an increase in cash, partially off-set by greater payables.

22


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

Total current liabilities increased in the current six-month period compared to the year ended December 31, 2020 mostly due to increased payables. Total current liabilities increased in the year ended December 31, 2020 comparing to the year ended December 31, 2019, due to increased payables, leases liabilities, and equipment financing liability. Total non-current liabilities decreased in the current six-month period compared to the year ended December 31, 2020 due to a change in reclamation liability (resulting from a change in discount rate). Total non-current liabilities increased in the year ended December 31, 2020 compared to the year ended December 31, 2019, mostly due to a change in reclamation liability (resulting from a change in discount rate and exchange rate) and equipment financing liability incurred in fiscal 2020.

The following table outlines the exploration and evaluation assets break-down:

Exploration and Evaluation Assets Summary:

Total
Balance at December 31, 2019 $ 61,348,921
Land acquisitions/option payments 45,835
Claim Staking 69,550
Legal expenses 5,559
Title review and environment 8,678
Reclamation adjustment* 12,000,190
Depreciation** (9,453 )
Translation difference*** (1,209,218 )
Total 72,260,062
Advance minimum royalty 69,962
Balance at December 31, 2020 72,330,024
Land acquisitions/option payments 18,591
Reclamation adjustment* (6,585,428 )
Depreciation** (4,550 )
Translation difference*** (1,920,165 )
Total 63,838,472
Advance minimum royalty 43,193
Balance at June 30, 2021 $ 63,881,665

*Reclamation adjustment is the change in present value of the reclamation liability, mainly due to changes to inflation rate and discount rate.

**A staff house building with a carrying value of US$187,150 (C$231,954) has been included in the DeLamar property. This building is being depreciated.

***December 31, 2019 closing balance of US$47,235,080 (C$61,348,921), translated to C$ with the December 31, 2020 exchange rate equals to $60,139,703, resulting in a $1,209,218 translation difference; December 31, 2020 closing balance of US$56,809,633 (C$72,330,024), translated to C$ with the June 30, 2021 exchange rate equals to $70,409,859, resulting in a $1,920,165 translation difference.

23


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

The following tables outline the Company's exploration and evaluation expense summary for the six-month period ended June 30, 2021 and 2020:

Exploration and Evaluation Expense Summary:

June 30, 2021 DeLamar
deposit
Florida
Mountain
deposit
War Eagle
deposit
Other
deposits
Joint
expenses
Total
Contract exploration drilling $ 903,961 $ 3,541,736 $ - $ 1,336,476 $ - $ 5,782,173
Contract metallurgical drilling - - - - - -
Contract condemnation drilling 235,885 - - - - 235,885
Exploration drilling - other drilling labour & related costs 594,447 1,916,480 140 866,441 - 3,377,508
Condemnation drilling - other drilling labour & related costs 72,605 - - - - 72,605
Other exploration expenses* 72,233 - - 62,331 883,198 1,017,762
Other development expenses** - - - - 1,059,422 1,059,422
Land*** 121,573 48,296 2,888 26,942 13,450 213,149
Permitting - - - - 1,594,252 1,594,252
Metallurgical test work 47,407 99,915 - - - 147,322
Technical reports and studies - - - - 942,629 942,629
Community engagement - - - - 106,763 106,763
Total $ 2,048,111 $ 5,606,427 $ 3,028 $ 2,292,190 $ 4,599,714 $ 14,549,470

*Includes mapping, IP, sampling, payroll, exploration G&A expenses, consultants

**Includes development G&A expenses and payroll

***Includes compliance, consulting, property taxes, legal, etc. expenses

June 30, 2020 DeLamar
deposit
Florida
Mountain
deposit
Other
deposits
Joint
expenses
Total
Contract exploration drilling $ 317,008 $ 356,613 $ - $ - $ 673,621
Contract metallurgical drilling 860,497 - - - 860,497
Exploration drilling - other drilling labour & related costs 288,297 219,953 15,011 - 523,261
Metallurgical drilling - other drilling labour & related costs 375,847 - - - 375,847
Other exploration expenses* - - 306,599 805,841 1,112,440
Other development expenses** - - - 532,791 532,791
Land*** 96,714 41,912 29,456 4,518 172,600
Permitting - - - 534,539 534,539
Metallurgy test work 248,925 75,459 - - 324,384
Technical reports and studies - - - 66,281 66,281
Community engagement - - - 83,070 83,070
Total $ 2,187,288 $ 693,937 $ 351,066 $ 2,027,040 $ 5,259,331

*Includes mapping, IP, sampling, payroll, exploration G&A expenses, consultants.

**Includes development G&A expenses and payroll

***Includes compliance, consulting, property taxes, legal, etc. expenses

24


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

RESULTS OF OPERATIONS

SIX-MONTH PERIOD ENDED JUNE 30, 2021

Net loss for the six-month period ended June 30, 2021 was $20,193,986 and the comprehensive loss $20,642,101, compared to a net loss of $8,351,575 and a comprehensive loss of $7,411,027 for the comparative period in 2020.

Overall, operating expenses were higher in the current six-month period mostly due to an increase in exploration and development expenses, compensation, office and site administration, regulatory, stock-based compensation (non-cash item), and depreciation (non-cash item) expenses; other non-operating loss in the current six-month period was mostly driven by the reclamation accretion expenses and foreign exchange loss, while the other non-operating income in the comparative period was mostly driven by the foreign exchange gain and interest income. The variances between these two periods were primarily due to the following items:

  • Exploration and evaluation expenses: the Company incurred $14,549,470 in exploration and development expenses during the current six-month period (June 30, 2020 - $5,259,331). The difference is mostly due to increased exploration and development activities in the current six-month period. The Company significantly increased permitting and engineering activities in 2021.
  • Office and site administration: the Company incurred $748,183 in expenses during the six-month period (June 30, 2020 - $366,331), mostly due to increased insurance premiums, computer and software expenses, general maintenance, Boise office expenses (new in 2021), and health and safety expenses in the current period.
  • Compensation and benefits: these expenses amounted to $1,544,654 in the current six-month period (June 30, 2020 - $1,261,273). The increase is mostly due to new hires since June 30, 2020.
  • Corporate development and marketing: for the six-month period totaled $163,880 (June 30, 2020 - $271,428). The decrease was mostly due to significant decrease in travel expenses in the current period, resulting from COVID-19 travel restrictions. Mining conferences where also held virtually, which meaningfully reduced marketing expenses.
  • Depreciation expenses related to the right-of-use assets amounted to $272,528 in the current six-month period (June 30, 2020 - $175,842), due to lease additions since Q2 2020.
  • Depreciation expenses related to the property, plant and equipment amounted to $257,511 in the current six-month (June 30, 2020 - $169,365), due to equipment additions since Q2 2020.
  • Regulatory fees: for the current six-month period totaled $200,848 (June 30, 2020 - $138,158). Regulatory fees, which also include filing fees and transfer agent fees, were higher in the current period mostly due to the Company's NYSE American listing. The Company listed on the NYSE American in July 2020, which resulted in higher annual regulatory and filling fees.
  • Professional fees: for the current six-month period totaled $222,491 (June 30, 2020 - $280,592). Professional fees include expenses such as legal, audit, accounting, tax, and miscellaneous consulting expenses. Professional fees were higher in 2020 mostly due to higher legal fees resulting from increased corporate activity, such as the Company's continuation to BC, share consolidation, and the NYSE American listing.
  • Stock-based compensation: the Company incurred $976,947 in stock-based compensation in the current six-month period (June 30, 2020 - $923,015). The variance is due to the timing of vesting of options granted from 2017 to 2020 and new equity incentive awards granted in the current period.

25


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020
  • Other income (expense): amounted to $1,257,474 (other expenses) in the current six-month period, compared to $493,760 (other income) in the comparative period. The variance is mostly due to a foreign exchange loss in the current period versus a foreign exchange gain in the comparative period. Interest income was also much higher in the first half of 2020 than the first half of 2021.

THREE-MONTH PERIOD ENDED JUNE 30, 2021

Net loss for the three-month period ended June 30, 2021 was $11,755,668 and the comprehensive loss $11,996,837, compared to a net loss of $5,234,608 and a comprehensive loss of $6,134,610 for the comparative period in 2020.

Overall, operating expenses were higher in the current three-month period mostly due to an increase in exploration and development expenses, compensation, office and site administration, and depreciation (non-cash item) expenses; other non-operating losses in both three-month periods were mostly driven by the reclamation expenses and foreign exchange loss, partly offset by the interest and rent income. The variances between these two periods were primarily due to the following items:

  • Exploration and evaluation expenses: the Company incurred $8,980,842 in exploration and development expenses during the current quarter (June 30, 2020 - $2,846,257). The difference is mostly due to increased exploration and development activities in the current three-month period. The Company significantly increased permitting and engineering activities in 2021.
  • Office and site administration: the Company incurred $344,170 in expenses during the three-month period (June 30, 2020 - $162,040), mostly due to increased insurance premiums, computer and software expenses, general maintenance, new Boise office expenses, and health and safety expenses in the current period.
  • Depreciation expenses related to the right-of-use assets amounted to $144,794 in the current three-month period (June 30, 2020 - $92,044), due to lease additions since Q2 2020.
  • Professional fees: for the current period totaled $125,182 (June 30, 2020 - $167,933). Professional fees include expenses such as legal, audit, accounting, tax, and miscellaneous consulting expenses. Professional fees were higher in the comparative period mostly due to higher legal fees resulting from increased corporate activity, such as the Company's continuation to BC, share consolidation, and the NYSE American listing.
  • Depreciation expenses related to the property, plant and equipment amounted to $131,904 in the current three-month (June 30, 2020 - $102,592), due to equipment additions since Q2 2020.
  • Compensation and benefits: these expenses amounted to $770,574 in the current three-month period (June 30, 2020 - $743,408). The increase is mostly due to new hires since June 30, 2020.
  • Corporate development and marketing: for the three-month period totaled $87,797 (June 30, 2020 - $103,541). The decrease was mostly due to significant decrease in travel expenses in the current period, resulting from COVID-19 travel restrictions.
  • Other income (expense): amounted to $628,911 (other expenses) in the current three-month period, compared to $453,394 (other expenses) in the comparative period. The variance is mostly due higher reclamation expenses and foreign exchange loss, and lower interest income in the current period compared to the same period last year.

Net cash used by the Company in operating activities for the six-month period ended June 30, 2021 was $18,186,534 (June 30, 2020 - $6,097,209). The variance between these two periods was mostly driven by exploration and development expenditures, compensation, office and site administration, and regulatory fees.

26


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

Investing Activities

Net cash used in investing activities for the six-month period ended June 30, 2021 was $503,026 compared to a $1,078,486 cash provided by investing activities in the comparative period. The difference was mostly due to the release of restricted cash (long-term investment) held as cash collateral for our environmental bonds.

Financing Activities

Net cash provided by financing activities in the current period was $1,317,818, comparing to net cash flow used from financing activities of $181,682 in the comparative period. The current period cash was provided by exercise of stock options and issuance of shares under the ATM. Net cash flow used from financing activities in the comparative period was mostly related to principal lease payments.

The Company raised net proceeds of approximately $12.0 million in August 2019 through a non-brokered financing. The table below summarized the expected use of proceeds and the actual use of proceeds:

August 2019 Financing

(Expenditures from July 2019 to December 2019)(1)

August 2019 Expected Use
of Proceeds (C$M)

Actual Use of
Proceeds (C$M)
(1)

Variance
(C$M)

Corporate G&A

$0

$0

$0

Drilling (Core and RC)

$7.4 (15,000m of core and RC drilling)

$5.4 (12,200m of core and RC drilling)

($2.0)(2)

Other Exploration (magnetics, spectrometry, mapping, travels, etc.)

$0.6

$1.5

$0.9(3)

Development

$1.4

$1.1

($0.3)

Other (field costs, geology work, land acquisition, land holdings, site G&A, infrastructure, etc.)

$1.7

$2.2

$0.5(4)

Site Ongoing Environmental Monitoring / Water treatment

$0.9

$1.3

$0.4

Total

$12.0

$11.5

($0.5)(5)

(1)Actual Use of Proceeds includes actual costs from July to December 2019.

(2)Variance can be explained due to a lesser amount of meters drilled (12,200m vs. original 15,000m planned).

(3)Variance can be explained by additional exploration work such as geochemistry, mapping, IP and spectrometry.

(4)Variance can be explained by the re-allocation of capital items (infrastructure) from 'Development' to 'Other'.

(5)The overall variance vs use of proceeds is not material.

The Company raised net proceeds of approximately $29.8 million in November and December 2019 through concurrent brokered and non-brokered financings. The table below summarized the expected use of proceeds (as of the date of the financings) and the actual use of proceeds (as of December 31, 2020):

November/December 2019 Financings

(Expenditures from January 2020 to December 2020)(1)

Nov/Dec 2019
Expected Use of
Proceeds (C$M)

Actual Use of
Proceeds (C$M)
(1)

Variance (C$M)

Exploration Drilling (Core)

$7.4

$7.6

$0.2

Metallurgical Drilling (Core)

$3.5

$2.1

($1.4) (2)

Other Exploration

$3.4

$2.8

($0.6) (3)

Development

$6.4

$4.2

($2.2) (4)

Other (field costs, land acquisition, land holdings, site G&A, infrastructure, etc.)

$2.7

$2.3

($0.4)

Site Ongoing Environmental Monitoring/Water treatment

$2.4

$2.2

($0.2)

Corporate G&A

$4.0

$4.3

$0.3

Total

$29.8

$25.5

($4.3)(5)

(1)Actual Use of Proceeds includes actual costs from January 1, 2020 to December 31, 2020.

27

(2)Variance can be explained due to a lesser amount of metallurgical meters drilled (2,763m vs. original 7,500m planned). The company did not require to drill as much as originally planned. The Company also spent ~US$0.5mm on ground water drilling.

(3)Variance can be explained by less labour costs than budgeted and decision not to proceed with the construction of a new core shack. Partially-off set by a greater IP program than originally budgeted.

(4)Variance can be explained by lower permitting and engineering expenses than originally budgeted. These expenses will be rolled over in 2021.

(5)Overall variance due to development expenses, as the Company did not spend as much as originally budgeted towards permitting and engineering expenses. The Company do not believe that the variance will have an impact on its development timeline.

The Company raised net proceeds of approximately C$28.1 million (US$21.3 million) in September 2020 through a brokered financing. The table below summarized the expected use of proceeds:

September 2020 Financing

(Expenditures from January 2021 to Q4 2021)(1)

September 2020
Expected Use of
Proceeds (US$M)
(1)

September 2020
Expected Use of
Proceeds (C$M)
(1)

Exploration work, including drilling

US$6.4

C$8.4

Pre-Feasibility Study work, including engineering and permitting

US$9.0

C$11.9

Other
(field costs, land acquisition, land holdings, site G&A, infrastructure, etc.)

US$1.7

C$2.2

Site Ongoing Environmental Monitoring / Water Treatment

US$1.4

C$1.9

Corporate G&A

US$2.8

C$3.7

Total

US$21.3

C$28.1

(1)The Company does not currently expect the actual use of proceeds to differ materially from the expected use of proceeds.

SUMMARY OF SELECTED QUARTERLY INFORMATION

The following table sets forth selected quarterly financial information for each of the last eight quarters *.

Quarter Ending

Revenue

($)

Net Loss

($)

Net Loss
Per Share ($)

June 30, 2021

Nil

(11,755,668)

(0.22)

March 31, 2021

Nil

(8,438,318)

(0.15)

December 31, 2020

Nil

(11,153,886)

(0.21)

September 30, 2020

Nil

(7,658,156)

(0.15)

June 30, 2020

Nil

(5,234,608)

(0.11)

March 31, 2020

Nil

(3,116,967)

(0.07)

December 31, 2019

Nil

(7,437,800)

(0.19)

September 30, 2019

Nil

(5,648,539)

(0.17)


*Net loss per share data reflects the 2.5 to 1 consolidation on July 9, 2020 of the Company's issued and outstanding shares.

The net losses for all these quarters were mostly driven by exploration and development expenses, head office and site G&A expenses (such as compensation, corporate development and marketing, office and administration, professional, and regulatory fees), and stock-based compensation expenses (non-cash item), partly offset by interest and rent income in all those periods and by foreign exchange gain in the third and first quarter of 2020.

28


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

LIQUIDITY AND CAPITAL RESOURCES

The Company does not have a mineral property in production and consequently does not receive revenue from the sale of precious metals. The Company currently has no operations that generates cash flow. The Company has financed its operations primarily through the issuance of share capital. The continued operations of the Company are dependent on its ability to complete sufficient public equity financing or generate profitable operations in the future.

The Company had a working capital of $12,445,668 at June 30, 2021 (December 31, 2020 - $30,630,454). Working capital decreased in the current period comparing to the year ended December 31, 2020 mostly due to a decrease in cash and an increase in payables.

The Company actively manages its liquidity using budgeting based on expected cash flows to ensure there are appropriate funds for meeting short term obligations during the year.

FINANCIAL INSTRUMENTS

All financial instruments are required to be measured at fair value on initial recognition. The fair value is based on quoted market prices, unless the financial instruments are not traded in an active market. In this case, the fair value is determined by using valuation techniques like the Black-Scholes option pricing model or other valuation techniques. Measurement in subsequent periods depends on the classification of the financial instrument. A description of financial instruments and their fair value is included in the audited consolidated financial statements for the year ended December 31, 2020, filed on SEDAR at www.sedar.com and on Integra's website at www.integraresources.com.

LOAN RECEIVABLE

In August 2020, the Company extended a US$140,000 (C$178,248) loan to a local resident to complete the construction of a restaurant in the local community of Jordan Valley, Oregon. This restaurant, which opened in March 2021, is serving the local community and the Company's employees and contractors. The loan bears a 6.0% interest rate per annum for a five-year term, and the first payment, which was originally due on January 31, 2021, was subsequently deferred to April 30, 2021. The monthly loan instalment is US$3,383, and the Company received three monthly instalments by the end of current six-month period ended June 30, 2021. The loan is fully secured by the premises and all property affixed or attached to or incorporated upon the premises. At the beginning of the current period, the loan was increased from US$140,000 (C$178,248) to US$175,000 (C$216,895).

An impairment test based on the expected credit loss model is being performed quarterly, and management assessed that the credit risk related to the loan as low.

Summaries of the changes in the loan receivable and interest income for the current six-month period ended June 30, 2021 and the year ended December 31, 2020 are included in the Company's unaudited interim condensed consolidated financial statements for the three and six-month periods ended June 30, 2021 and 2020.

29


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

COMMITMENTS AND CONTRACTUAL OBLIGATIONS

Net Smelter Return

A portion of the DeLamar Project is subject to a 2.5% NSR payable to Maverix Metals Inc. ('Maverix'). The NSR will be reduced to 1.0% once Maverix has received a total cumulative royalty payment of C$10 million.

Advance Minimum Royalties, Land Access Lease Payments, and Annual Claim Filings

The Company is required to make property rent payments related to its mining lease agreements with landholders and the Idaho Department of Lands ('IDL'), in the form of advance minimum royalties ('AMR'). There are multiple third-party landholders, and the royalty amounts due to each of them over the life of the Project varies with each property.

The Company's AMR obligation is expected to total US$64,950 (C$80,499) for 2021 (December 31, 2020 - US$54,950 (C$69,962)) - US$34,850 (C$43,193) was paid in the current period.

The Company's obligation related to land and road access lease payments, option payments and IDL rent payments is expected to total US$229,331 (C$284,233) for 2021 (December 31, 2020 - US$195,193 (C$248,520)) - US$147,465 (C$182,768) was paid in the current period.

The Company's obligation for BML claim fees is expected to total US$191,070 (C$236,812) for 2021 (December 31, 2020 - US$191,651 (C$244,010)).

The increase in land related payments from 2020 to 2021 is not material and is mostly a result of the Company's increased land position.

Other Commitments

The Company's commitments and contractual obligations at June 30, 2021, are as follows:

Commitments and
contractual
obligations

Less than one

year
commitment

1 - 3 years
commitment

3 - 5 years
commitment

Over 5 years
commitment

Total

Contractual obligations*

3,925,802

1,069,652

216,622

-

5,212,076

Total

$ 3,925,802

$ 1,069,652

$ 216,622

$ -

$ 5,212,076

*Contractual obligations are related to various exploration and development commitments.

LEASES - RIGHT-OF-USE ASSETS AND LEASE LIABILITIES

Summaries of the changes in right-of-use assets and the lease liabilities for the six-month period ended June 30, 2021 and the year ended December 31, 2020 are included in the Company's unaudited interim condensed consolidated financial statements for the three and six-month periods ended June 30, 2021 and 2020.

The Company subleased a portion of its head office to three companies for a total rent income of $43,000 in the current six-month period ended June 30, 2021 (June 30, 2020 - $38,370). The income is recognized in the statement of operations and comprehensive loss, under the 'Rent income - sublease'.

30


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

Operating Leases

The Company elected to apply recognition exemption under IFRS 16 on its short-term rent agreements related to its office and equipment rentals. For the six-month period ended June 30, 2021, the Company expensed $36,704 (June 30, 2020 - $86,577) related to these operating leases. June 30, 2020 expensed amount was related to the short-term office rent and equipment rental agreements. The Company's short-term lease commitment as of June 30, 2021 was $71,129 (December 31, 2020 - $15,877).

TRANSACTIONS WITH RELATED PARTIES

Related parties include the Board of Directors and officers and enterprises that are controlled by these individuals as well as certain consultants performing similar functions.

As June 30, 2021, $625,536 (December 31, 2020 - $816,811) was due to related parties for payroll expenses, consulting fees, bonuses accruals, vacation accruals and other expenses. Receivables from related parties (related to rent and office expenses) as of June 30, 2021 amounted to $9,803 (December 31, 2020 - $9,516) and was recorded in receivables. These receivables were settled subsequent to the period end.

Key Management Compensation:

Key management personnel include those persons having authority and responsibility for planning, directing, and controlling the activities of the Company as a whole. The Company has determined that key management personnel consist of executive and non-executive members of the Company's Board of Directors and corporate officers.

Remuneration attributed to executives and directors for the six-month periods ended June 30, 2021 and 2020 were as follows:


June 30, 2021
June 30, 2020
Short-term benefits* $ 1,178,243 $ 932,456
Associate companies** (9,705 ) (16,886 )
Stock-based compensation 632,171 638,648
Total $ 1,800,709 $ 1,554,218

*Short-term employment benefits include salaries, consulting fees, vacation accruals and bonus accruals for key management. It also includes directors' fees for non-executive members of the Company's Board of Directors.

**Net of payable/receivable/GST due to/from entities for which Integra's directors are executives, mostly related to rent and office expenses.

Key management personnel include those persons having authority and responsibility for planning, directing and controlling the activities of the Company as a whole. The Company has determined that key management personnel consist of executive and non-executive members of the Company's Board of Directors and corporate officers.

The following tables show the break-down of the compensation and short-term benefits attributed to key management and associate companies for the six-month periods ended June 30, 2021 and 2020*.

31


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

Six-Months Ended
Related Parties June 30, 2021 June 30, 2020
George Salamis, Director, CEO & President $ 344,015 $ 221,879
Stephen de Jong, Director** 51,429 60,000
David Awram, Director** - 18,000
Timo Jauristo, Director** 7,178 18,000
Anna Ladd-Kruger, Director 22,977 18,000
C.L. 'Butch' Otter, Director 22,513 24,239
Carolyn Clark Loder, Director*** 11,176 -
Andree St-Germain, CFO 155,893 145,008
Max Baker, VP Exploration 189,731 188,720
Joshua Serfass, Executive VP Corporate Development and IR 148,009 -
Timothy Arnold, COO 225,322 238,610
Total $ 1,178,243 $ 932,456

*Short-term employment benefits include salaries, consulting fees, vacation accruals, and bonus accruals for key management. It also includes directors' fees for non-executive members of the Company's Board of Directors.

** Compensation shown in the above table does not include value of DSUs received in lieu of directors fees. See tables below for value of Q1 and Q2 2021 DSU grants.

*** Mrs. Carolyn Clark Loder became a related party in February 2021.

Associate companies - June 30, 2021 Paid to Received from Net total
VRify Technology Inc. (1) $ 9,000 $ - $ 9,000
Contact Gold Corp. (2) - (18,705 ) (18,705 )
Total $ 9,000 $ (18,705 ) $ (9,705 )

Associate companies - June 30, 2020 Paid to Received from Net total
VRify Technology Inc. (1) $ 2,000 $ - $ 2,000
Contact Gold Corp. (2) - (18,886 ) (18,886 )
Total $ 2,000 $ (18,886 ) $ (16,886 )

(1)Stephen de Jong, Chairman of the Company, is the CEO of VRify Technology Inc. ('VRify'). The Company paid VRify fees for its virtual reality services.

(2)George Salamis, president and CEO of the Company, is a director of Contact Gold ('Contact Gold'). Contact Gold paid the Company rent and office expenses.

On March 31, 2021, the Company issued 6,921 deferred share units to certain directors, in lieu of their directors' fees, as elected by those directors. Each DSU has been fair valued at Integra's March 31, 2021 closing share price of $3.40. Those units vested in full at the grant date. The share-based payment related to these DSUs was calculated as $23,531, expensed on March 31, 2021. The following table shows the break-down of the DSUs issued on March 31, 2021:

March 31, 2021 Quarterly Retainer % Paid DSUs Value base Number of DSUs
(Share-based payment)
Stephen de Jong $ 30,000 20% $ 5,998 1,764
David Awram 10,250 100% 10,248 3,014
Timo Jauristo 10,875 67% 7,285 2,143
Total $ 51,125 $ 23,531 6,921

On June 30, 2021, the Company issued 6,482 deferred share units to certain directors, in lieu of their directors' fees, as elected by those directors. Each DSU has been fair valued at Integra's June 30, 2021 closing share price of $3.63. Those units vested in full at the grant date. The share-based payment related to these DSUs was calculated as $23,529, expensed on June 30, 2021. The following table shows the break-down of the DSUs issued on June 30, 2021:

32


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

June 30, 2021 Quarterly Retainer % Paid DSUs Value base Number of DSUs
(Share-based payment)
Stephen de Jong $ 30,000 20% $ 5,997 1,652
David Awram 10,250 100% 10,247 2,823
Timo Jauristo 10,875 67% 7,285 2,007
Total $ 51,125 $ 23,529 6,482

The Company did not issue deferred share units in lieu of directors' fees in 2020. The option to receive DSUs in lieu of cash directors' fees was introduced in 2021 in order to encourage insiders' ownership.

EQUIPMENT FINANCING

During the 2020 fiscal year, the Company's wholly owned subsidiary, DeLamar Mining Company, purchased a dozer and two small excavators and entered into a 48-month mobile equipment financing agreement in the amount of US$0.6mm (C$0.8mm). The mobile equipment financing is guaranteed by Integra Resources Corp.

During the quarter ended June 30, 2021, the Company's wholly owned subsidiary, DeLamar Mining Company, purchased a dozer and entered into a 48-month mobile equipment financing agreement in the amount of US$0.3mm (C$0.3mm). The mobile equipment financing is guaranteed by Integra Resources Corp.

The equipment financing liability is initially measured at the present value of the payments to be made over the financing term, using the implicit interest rate of 7.0% per annum for the 2020 financing and the implicit interest rate of 6.5% for the financing incurred in the current six-month period. Subsequently, equipment financing liability is accreted to reflect interest and the liability is reduced to reflect financing payments.

Summaries of the changes in the equipment financing liability and interest expenses for the six-month period ended June 30, 2021 and the year ended December 31, 2020 are included in the Company's unaudited interim condensed consolidated financial statements for the three and six-month periods ended June 30, 2021 and 2020.

OUTSTANDING SHARE DATA

Share capital details are included in the Company's unaudited interim condensed consolidated financial statements for the three and six-month periods ended June 30, 2021 and 2020.

The following table outlines the outstanding share data as of the date of this MD&A:

August 10, 2021

Issued and outstanding common shares

55,320,972

Outstanding Options/RSUs/DSUs to purchase common shares

5,153,010

Issued and outstanding common shares (fully diluted)

60,473,982

SUBSEQUENT EVENTS

  • Subsequent to the period-end, 2,000 options were exercised.

33


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020
  • Subsequent to the period-end, the Company sold 155,000 shares under its ATM at an average price of US2.95 for gross proceeds of US$456,957 (C$573,390) and paid 2.75% commission.

CRITICAL ACCOUNTING JUDGMENTS AND ESTIMATES

The preparation of the consolidated financial statements in conformity with IFRS requires management to make judgments, estimates and assumptions which affect the reported amounts of assets and liabilities, the disclosure of contingent assets and liabilities at the date of the unaudited interim condensed consolidated financial statements and the reported amounts of revenues and expenses during the reporting period. Estimates are based on historical experience and other factors considered to be reasonable and are reviewed on an ongoing basis. Revisions to estimates and the resulting effects on the carrying amounts of the Company's assets and liabilities are accounted for prospectively.

Measurement uncertainties are described in the Company's audited consolidated financial statements for the year ended December 31, 2020.

CHANGES IN ACCOUNTING POLICIES

The Company's accounting policies are in accordance with IFRS and described in the Company's audited consolidated financial statements for the year ended December 31, 2020.

RISKS AND UNCERTAINTIES

The Company is subject to a number of risks and uncertainties due to the nature of its business. The Company's exploration activities expose it to various financial and operational risks that could have a significant impact on its level of operating cash flows in the future.

Readers are advised to study and consider risk factors disclosed in the Company's Annual Information Form for the fiscal year ended December 31, 2020, dated March 12, 2021 and available under the Company's issuer profile on SEDAR at www.sedar.com.

CAUTIONARY NOTE TO US INVESTORS WITH RESPECT TO MINERAL RESOURCES

The SEC has adopted amendments to its disclosure rules to modernize the mineral property disclosure requirements for issuers whose securities are registered with the SEC. These amendments became effective February 25, 2019 (the 'SEC Modernization Rules') and, following a two-year transition period, the SEC Modernization Rules will replace the historical property disclosure requirements for mining registrants that are included in Industry Guide 7. Following the transition period, as a foreign private issuer that files its annual report on Form 40-F with the SEC pursuant to the multi-jurisdictional disclosure system, the Company is not required to provide disclosure on its mineral properties under the SEC Modernization Rules and will continue to provide disclosure under NI 43-101 and the CIM Definition Standards. If the Company ceases to be a foreign private issuer or loses its eligibility to file its annual report on Form 40-F pursuant to the multi-jurisdictional disclosure system, then the Company will be subject to the SEC Modernization Rules which differ from the requirements of NI 43-101 and the CIM Definition Standards.

34


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

NON-GAAP MEASURES

Alternative performance measures in this document such as 'cash cost' and 'AISC' are furnished to provide additional information. These non-GAAP performance measures are included in this MD&A because these statistics are used as key performance measures that management uses to monitor and assess performance of the DeLamar Project, and to plan and assess the overall effectiveness and efficiency of mining operations. These performance measures do not have a standard meaning within IFRS and, therefore, amounts presented may not be comparable to similar data presented by other mining companies. These performance measures should not be considered in isolation as a substitute for measures of performance in accordance with IFRS.

TECHNICAL INFORMATION

The scientific and technical information contained in this MD&A has been reviewed and approved by E. Max Baker (F.AusIMM), Vice President Exploration, and Timothy Arnold (P.E.), Chief Operating Officer, who are a 'Qualified Person' ('QP') as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

CORPORATE GOVERNANCE

Management and the Board recognizes the value of good corporate governance and the need to adopt best practices. The Corporation is committed to continuing to improve its corporate governance practices in light of its stage of development and evolving best practices and regulatory guidance.

The Board has adopted a Board mandate outlining its responsibilities and defining its duties. The Board has four committees: the Audit Committee, the Human Resources and Compensation Committee, the Nomination and Corporate Governance Committee, and the Technical, Safety, Environment and Sustainability Committee. Each Committee has a committee charter, which outlines the Committee's mandate, procedures for calling a meeting, and provides access to outside resources.

The Board has also adopted a Code of Business Conduct and Ethics, which governs the ethical behavior of all employees, management, and directors. For more details on the Company's corporate governance practices, please refer to Integra's website (www.integraresources.com) and the statement of Corporate Governance contained in Integra's Management Information Circular dated May 14, 2021. The Management Information Circular is available on Integra's website (www.integraresources.com) and on SEDAR (www.sedar.com).

The Corporation's Directors have expertise in exploration, metallurgy, mining, financial reporting and accounting, M&A, financing, permitting and government relations, environmental considerations, human resources, governance, and relations with tribal nations and local communities. The Board meets at least four times per year.

CONTROL AND PROCEDURES

Disclosure Controls and Procedures

Disclosure controls and procedures are designed to provide reasonable assurance that material information is gathered and reported to management, as appropriate to allow for timely decisions about public disclosure. The Company has disclosure controls and procedures in place to provide reasonable assurance that any information required to be disclosed by the Company under securities legislation is recorded, processed, summarized, and reported within the applicable time periods and that required information is accumulated and communicated to the Company's management, so that decisions can be made about the timely disclosure of that information.

35


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

Management has evaluated the effectiveness of the design and operation of the Company's disclosure controls as of June 30, 2021 and concluded that the disclosure controls and procedures were effective.

Internal Controls over Financial Reporting

Management is responsible for establishing and maintaining adequate internal controls over financial reporting as such term is defined in the rules of the National Instrument 52-109 in Canada ('NI 52-109') and Rules 13a-15(f) and 15d-15(f) of the United States Securities Exchange Act of 1934, as amended. The Company's internal controls over financial reporting is designed to provide reasonable assurance regarding the reliability of the Company's financial reporting for external purposes in accordance with IFRS as issued by the IASB.

Based on the criteria set forth in Internal Control - Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission, the Company's internal controls over financial reporting include:

•Maintaining records, that in reasonable detail, accurately and fairly reflect our transactions and dispositions of the assets of the Company;

•Providing reasonable assurance that transactions are recorded as necessary for preparation of the consolidated financial statements in accordance with IFRS as issued by the IASB;

•Providing reasonable assurance that receipts and expenditures are made in accordance with authorizations of management and the directors of the Company; and

•Providing reasonable assurance that unauthorized acquisition, use or disposition of Company assets that could have a material effect on the Company's consolidated financial statements would be prevented or detected on a timely basis.

Management has evaluated the effectiveness of the internal controls over financial reporting as of June 30, 2021 and concluded that those controls were effective.

Limitation of Controls and Procedures

Management believes that any disclosure controls and procedures or internal control over financial reporting, no matter how well designed and operated, have their inherent limitations. Due to those limitations (resulting from unrealistic or unsuitable objectives, human judgment in decision making, human errors, management overriding internal control, circumventing controls by the individual acts of some persons, by collusion of two or more people, external events beyond the entity's control), internal control can only provide reasonable assurance that the objectives of the control system are met.

The design of a control system must reflect the fact that there are resource constraints, and the benefits of controls must be considered relative to their costs. Due to the inherent limitations in a cost-effective control system, misstatements due to error or fraud may occur and not be detected.

There were no changes in internal controls of the Company during the six-month period ended June 30, 2021 that have materially affected, or are likely to materially affect, the Company's internal control over financial reporting.

INFORMATION REGARDING FORWARD-LOOKING STATEMENTS

This MD&A contains 'forward-looking information' and 'forward-looking statements' (collectively, 'forward-looking statements') within the meaning of the applicable Canadian and United States securities legislation. All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this MD&A. Any statement that involves discussion with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often, but not always using phrases such as 'plans', 'expects', 'is expected', 'budget', 'scheduled', 'estimates', 'forecasts', 'intends', 'anticipates', or 'believes' or variations (including negative variations) of such words and phrases, or state that certain actions, events or results 'may', 'could', 'would', 'might' or 'will' be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements.

36


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

In this MD&A, forward-looking statements relate, but are not limited, to: the development, operational and economic results of the PEA, including cash flows, capital expenditures, development costs, extraction rates, life of mine cost estimates; estimation of mineral resources; magnitude or quality of mineral deposits; anticipated advancement of the DeLamar Project mine plan; future operations; future exploration prospects; the completion and timing of future development studies, including a pre-feasibility study; future growth potential of DeLamar and future development plans; planned exploration and development programs and expenditures; proposed exploration plans and expected results of exploration and drilling from the DeLamar Project; submission of, and anticipated results of, permitting applications; planned environmental studies; Integra's ability to obtain licenses, permits and regulatory approvals required to implement expected future exploration plans; changes in commodity prices and exchange rates; currency and interest rate fluctuations and impact of COVID-19 on the timing of exploration work and development studies.

Forward-looking statements are necessarily based upon a number of factors and assumptions that, if untrue, could cause actual results, performance or achievements to be materially different from future results, performance or achievements expressed or implied by such statements. Forward-looking statements are based upon a number of estimates and assumptions that, while considered reasonable by the Company at this time, are inherently subject to significant business, economic and competitive uncertainties and contingencies that may cause the Company's actual financial results, performance, or achievements to be materially different from those expressed or implied herein. Some of the material factors or assumptions used to develop forward-looking statements include, without limitation, the future price of gold and silver, anticipated costs and the Company's ability to fund its programs, the Company's ability to carry on exploration and development activities, the timing and results of drilling programs, the discovery of additional mineral resources on the Company's mineral properties, the timely receipt of required approvals and permits, including those approvals and permits required for successful project permitting, construction and operation of projects, the costs of operating and exploration expenditures, the Company's ability to operate in a safe, efficient and effective manner, the Company's ability to obtain financing as and when required and on reasonable terms and the impact of COVID-19 and the resumption of business.

Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others: risks related to the speculative nature of the Company's business; the Company's formative stage of development; the Company's financial position; possible variations in mineralization, grade or recovery rates; actual results of current exploration activities; actual results of reclamation activities; conclusions of future economic evaluations; business integration risks; fluctuations in general macroeconomic conditions; fluctuations in securities markets; fluctuations in spot and forward prices of gold, silver, base metals or certain other commodities; fluctuations in currency markets (such as the Canadian dollar to United States dollar exchange rate); change in national and local government, legislation, taxation, controls regulations and political or economic developments; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected formation pressures, cave-ins and flooding); inability to obtain adequate insurance to cover risks and hazards; the presence of laws and regulations that may impose restrictions on mining; employee relations; relationships with and claims by local communities and indigenous populations; availability of increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development (including the risks of obtaining necessary licenses, permits and approvals from government authorities); and title to properties.

37


MANAGEMENT'S DISCUSSION & ANALYSIS
For the Three and Six-Month Periods Ended June 30, 2021 and 2020

This list is not exhaustive of the factors that may affect any of the Company's forward-looking statements. Although the Company believes its expectations are based upon reasonable assumptions and have attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. See the section entitled 'Risk Factors' above for additional risk factors that could cause results to differ materially from forward-looking statements.

Forward-looking statements contained herein are made as of the date of this MD&A and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results, except as may be required by applicable securities laws. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

Investors are cautioned not to put undue reliance on forward-looking statements. The forward-looking statements contained herein are made as of the date of this MD&A and, accordingly, are subject to change after such date. The Company disclaims any intent or obligation to update publicly or otherwise revise any forward-looking statements or the foregoing list of assumptions or factors, whether as a result of new information, future events or otherwise, except in accordance with applicable securities laws. Investors are urged to read the Company's filings with Canadian securities regulatory agencies, which can be viewed online under the Company's profile on SEDAR at www.sedar.com.

MANAGEMENT'S RESPONSIBILITY

Management is responsible for all information contained in this MD&A. The unaudited interim condensed consolidated financial statements have been prepared in accordance with International Financial Reporting Standards and include amounts based on management's informed judgments and estimates. The financial and operating information included in this MD&A is consistent with that contained in the unaudited interim condensed consolidated financial statements in all material aspects.

Management maintains internal controls to provide reasonable assurance that financial information is reliable and accurate, and assets are safeguarded.

The Audit Committee has reviewed the unaudited interim condensed consolidated financial statements with management. The Board of Directors has approved these unaudited interim condensed consolidated financial statements on the recommendation of the Audit Committee.

George Salamis

President and CEO

August 10, 2021

38

Attachments

  • Original document
  • Permalink

Disclaimer

Integra Resources Corp. published this content on 10 August 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 10 August 2021 21:00:08 UTC.