GTT will design the tanks of these two vessels, which will each offer a total cargo capacity of 174,000 m3 and will be fitted with theMark III Flexmembrane containmentsystem, developed by GTT.
The delivery of the vessels is scheduled between the third and the fourth quarters of 2026.
Media contact:
press@gtt.fr/ +33 (0)1 30 23 48 45
Investor Relations contact:
information-financiere@gtt.fr/ + 33 (0)1 30 23 20 87
>Download in .pdf
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
GTT – Gaztransport & Technigaz SA published this content on 31 January 2023 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 31 January 2023 16:57:02 UTC.