GTT: design contract for six LNG carriers in China
GTT will design the tanks for these six LNG carriers, each with a total capacity of 174,000 m3, and will integrate the NO96 Super+ membrane containment system developed by GTT.
Delivery of the vessels is scheduled between the third quarter of 2027 and the fourth quarter of 2028, says GTT.
Copyright (c) 2023 CercleFinance.com. All rights reserved.
Go to the original article.
Contact us to request a correction