Gold Springs Resource Corp. has received drill results from the first 6 holes of the 2022 drilling program around the South Jumbo resource of its large Gold Springs project located in USA, on the border of Nevada and Utah, one of the best mining jurisdictions in the world. Highlights include: 1.08 g/t gold equivalent over 15.3 meters and 0.74 g/t gold equivalent over 15.3 meters in hole E-22-001.

1.46 g/t gold equivalent over 9.2 meters and 0.95 g/t gold equivalent over 9.2 meters in hole E-22-002. 1.36 g/t gold equivalent over 27.4 meters and 1.38 g/t gold equivalent over 6.1 meters in hole E-22-003. 0.68 g/t gold equivalent over 12.6 meters and 0.74 g/t gold equivalent over 13.7 meters in hole E-22-004.

Gold equivalent based on $1,800/oz gold and $25/oz silver. GRC has now completed 14 holes for a total of 2,828 meters of the planned 20,100 meters RC drilling program. Assays have been received for the first 6 holes from the South Jumbo resource area, which were designed to expand the resource at depth and along strike.

An additional 3 holes will be completed at South Jumbo before the drill moves to the Snow target for 2 holes, followed by the Charlie Ross target which was a new discovery in 2021.