Gold Springs Resource Corp. announced its 2022 plan to advance rapidly towards pre-feasibility its 8,000 ha Gold Springs Project located in Nevada and Utah (USA). The 2022 drilling program is designed: to expand the 4 existing resources, especially at “North Jumbo” and “South Jumbo”, to conduct follow up drilling on the 4 significant new discoveries at “Tremor”, “Charlie Ross”, “White Point” and “Homestake” and to conduct new drilling on 5 targets at “Midnight”, “Pope”, “Red Light”, “Snow” and “Horseshoe Extension”.

All of these targets are ready to drill with roads and drill pads constructed. The Company's 2022 plan will aim to expand its resources areas and the number of ounces with: 2 resource up-dates: in the 1st quarter with the 2021 drilling results and in the fourth quarter. RC drill to expand the existing resources; 1 RC drill to follow up on the significant new discoveries and test new targets; 1 Core drill to test deeper portions of some 2021 discoveries and collect material from the existing resources for metallurgical testing; expanded CSAMT geophysical surveys; baseline studies completed to advance the mine permitting process.