Grupo Cementos de Chihuahua, S.A.B. de C.V announced that it has signed a long-term agreement with a leading U.S. based energy provider to supply solar and wind power to GCC’s Odessa, Texas cement plant, thereby covering 100% of the electricity consumed at these operations. Resulting in approximately 45,000 metric ton reduction in CO2, annually; equivalent to around 9,500 passenger vehicles driven for a year, based on the U.S Environmental Protection Agency estimate. The 10-year fixed-price agreement takes effect beginning July 2022 and represents a ~22% decrease from the current electricity price for the Odessa plant, translating into USD 4.6 million in total savings for this period. GCC remains focused on implementing global best practices related to sustainability throughout the organization while further strengthening the Company’s overall profitability.