SAINTS NICKEL PROJECT UPDATE

Highlights

  • All assay results from the Saints infill drill programme have now been received, confirming high-grade massive and semi-massivenickel-copper sulphides
  • Results will be used in an upgrade of the Saints Mineral Resource Estimate (MRE), which is underway and expected to be completed in approximately 4 to 6 weeks
  • The update in the Saints MRE is focussed on using the information from the infill drilling to upgrade a large portion of the current Saints Mineral Resources of 1.02Mt @ 2.0% Ni for 21,400t of contained nickel 1 from an Inferred Resource to an Indicated Resource category
  • Excellent interim results received from the metallurgical testwork on the Saints nickel sulphide mineralisation, producing nickel concentrate grades of up to 24% Ni

Auroch Minerals Limited (ASX:AOU) (Auroch or the Company) is pleased to provide an update on the work programmes at its 100%-owned Saints Nickel Project (Saints) in Western Australia.

All outstanding assay results have been received from the infill diamond drill programme completed earlier this year. All drill-holes intersected nickeliferous massive or semi-massive sulphides (refer to Figures 1 & 2), with significant intersections including (see Table 1 for full table of results):

  1. SNDD021: 3.01m @ 5.23% Ni, 0.69% Cu, 0.77g/t PGE from 177.08m;
  1. SNDD023: 2.40m @ 2.10% Ni, 0.14% Cu, 0.09% Co, 0.36g/t PGE from 263.78m and 2.21m @ 4.30% Ni, 0.37% Cu, 0.13% Co, 0.58g/t PGE from 268.18m;
  1. SNDD016: 1.00m @ 5.16% Ni, 0.06% Cu, 0.09% Co, 0.56g/t PGE from 73.10m; and o SNDD020: 1.62m @ 3.92% Ni, 0.42% Cu, 0.11% Co, 0.70g/t PGE from 217.35m. 2

Following the receipt of the final outstanding assays, the Company has initiated an update of the Mineral Resource Estimate (MRE) on the Saints Nickel Project, contracting experienced resource geologist Shaun Searle from Ashmore Advisory Pty Ltd to complete the work.

The update of the Saints MRE is focussed on using the assay results and geological information from the infill drilling to upgrade a large portion of the current Saints Mineral Resource of 1.02Mt @ 2.0% Ni for 21,400t of contained nickel 1 from an Inferred Resource to an Indicated Resource category.

The expected upgrade in resource classification is a critical step in the Saints Scoping Study and will result in a higher level of confidence in the financial modelling of the potential underground mining scenario. The MRE upgrade is expected to be completed within the next four to six weeks.

The Company is also pleased to announce that it has received excellent interim results from the ongoing metallurgical testwork on the nickel sulphide mineralisation at Saints. Strategic Metallurgy Pty Ltd has completed a first-passtest of two bulk composite samples from the recent drilling, one from the Saint Patricks mineralisation and the other from Saint Andrews, following the traditional flow sheet of "Kambalda-style"nickel sulphide deposits.

Both metallurgical samples produced very good concentrate grades over 14%, with initial concentrate grades up to 24% Ni and 5% Cu. Importantly, the iron to magnesium ratio is also very good (Fe:MgO

  1. JORC (2012) Inferred Resources, above a 1.0% Ni cut-off grade. Refer to 28 May 2019 ASX Announcement - AUROCH TO ACQUIRE HIGH-
    GRADE WESTERN AUSTRALIAN NICKEL PROJECTS.
  2. Significant intersections are reported at a 1.0% Ni cut-off on a density-weighted basis; all intersections are down-hole widths unless otherwise stated. Results include previously reported results, refer to 5 May 2022 ASX Announcement - FURTHERHIGH-GRADENICKEL SULPHIDES AT SAINTS.

Auroch Minerals Ltd ABN 91 148 966 545

Suite 10, 38 Colin St, West Perth WA 6005 Phone: +61 8 6383 7817 Fax: +61 8 6245 9853

Email: info@aurochminerals.com www.aurochminerals.com

For personal use only

ASX ANNOUNCEMENT

7th July 2022

>10 and >22, respectively), the cobalt grade and recoveries are good (>0.5% Co) and there is no arsenic (As) in the material.

The testwork will now focus on improving the recoveries, as there were still nickel sulphides observed in the tailings of both initial tests. The final results for the Saints metallurgical testwork are expected in the next four to six weeks and will provide further critical inputs into the Saints Scoping Study.

Auroch Managing Director Aidan Platel commented:

"We are extremely encouraged with the initial results from the metallurgical testwork at Saints. The tests have shown that the sulphide mineralisation at both Saint Patricks and Saint Andrews can produce a very clean, high-grade nickel-copper-cobaltconcentrate with excellent Fe:MgO ratios, which would make it a desirable ore source for any nickel sulphide beneficiation facility in the region.

We are also pleased to have commenced work on upgrading the MRE at Saints. These two work streams will provide critical inputs into the Saints Scoping Study and, importantly, will result in a higher level of confidence in our financial modelling of the potential underground mining scenario at Saints. We look forward to the results of this work and to finalising the Scoping Study later this quarter."

Figure 1 - Long-section (looking east) of the current modelled resource at the Saints Nickel Project showing

intersected pierce points and significant intersections from recent diamond drill programme

Auroch Minerals Ltd ABN 91 148 966 545

Suite 10, 38 Colin St, West Perth WA 6005 Phone: +61 8 6383 7817 Fax: +61 8 6245 9853

Email: info@aurochminerals.com www.aurochminerals.com

FOLLOW US

ASX ANNOUNCEMENT

7th July 2022

For personal use only

Figure 1 - Map of the Saints Nickel Project showing results from the recent diamond drill programme against

interpreted geology, historic drill-holes and resource outline

This announcement has been authorised by the Board of Directors of the Company.

-END-

For further information visit www.aurochminerals.comor contact:

Aidan Platel

Managing Director

E: aplatel@aurochminerals.com

Auroch Minerals Ltd ABN 91 148 966 545

FOLLOW US

Suite 10, 38 Colin St, West Perth WA 6005 Phone: +61 8 6383 7817 Fax: +61 8 6245 9853

Email: info@aurochminerals.com www.aurochminerals.com

For personal use only

ASX ANNOUNCEMENT

7th July 2022

Competent Persons Statement

The information in this report that relates to Exploration Results is based on and fairly represents information compiled by Mr Robin Cox BSc (E.Geol), a Competent Person, who is a Member of the Australian Institute of Mining and Metallurgy. Mr Cox is the Company's Senior Geological Officer and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr McCarthy consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears.

The information in this release that relates to Metallurgical Results and Interpretations is based on information compiled by Nick Vines, Executive Director at Strategic Metallurgy Pty Ltd. Mr Vines is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM) and has sufficient experience which is relevant to the metallurgical test work on the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Vines consents to the inclusion in the release of the matters based on this information in the form and context in which it appears.

Forward-Looking Statements

This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning Auroch Minerals Limited's planned exploration programmes and other statements that are not historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may", "potential", "should," and similar expressions are forward-looking statements. Although Auroch Minerals Limited believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking statements.

Table 1 - Significant intersections from the recent diamond drill programme at Saints. Intersections shown

are length and density weighted

HOLE ID

Comments

From

To (m)

Interval

Ni %

Cu %

Co %

PGE

(m)

(m)

(Pt+Pd) g/t

73.10

74.10

1.00

5.16

0.06

0.09

0.56

SNDD016

150.00

151.00

1.00

1.23

0.06

0.04

0.33

187.86

189.40

1.54

1.35

0.10

0.04

0.36

61.50

61.80

0.30

6.49

0.17

0.16

2.58

SNDD017

83.95

85.00

1.05

1.34

0.06

0.02

0.65

202.01

203.00

0.99

2.22

0.11

0.08

0.36

165.00

170.12

5.12

2.33

0.14

0.06

0.82

Including

169.81

170.12

0.31

8.83

0.44

0.24

2.91

SNDD018

304.00

305.00

1.00

1.03

0.03

0.02

0.31

311.98

316.77

4.79

2.05

0.16

0.08

0.36

Including

316.00

316.77

0.77

5.09

0.47

0.22

0.50

150.00

152.00

2

0.72

0.04

0.02

SNDD019

163.00

166.00

3

0.81

0.02

0.02

175.00

177.00

2

0.67

0.05

0.02

182.00

184.00

2

0.51

0.02

0.02

SNDD020

Met hole

217.35

218.97

1.62

3.92

0.42

0.11

0.70

SNDD021

177.08

180.09

3.01

5.23

0.69

0.17

0.80

SNDD022

177.73

178.57

0.84

2.98

0.36

0.10

0.67

Auroch Minerals Ltd ABN 91 148 966 545

FOLLOW US

Suite 10, 38 Colin St, West Perth WA 6005 Phone: +61 8 6383 7817 Fax: +61 8 6245 9853

Email: info@aurochminerals.com www.aurochminerals.com

For personal use only

ASX ANNOUNCEMENT

7th July 2022

Met hole

107.00

108.20

1.20

1.13

0.08

0.03

0.28

SNDD023

263.78

266.18

2.40

2.10

0.14

0.09

0.36

Including

264.97

266.18

1.21

2.93

0.20

0.13

0.54

268.18

270.39

2.21

4.30

0.37

0.13

0.58

SNDD025

185.00

188.9

3.9

0.62

0.01

0.01

0.04

Including

188.00

188.90

0.9

1.08

0.05

0.02

0.07

SNDD026

245.25

248.81

3.56

0.55

0.03

0.01

0.13

Including

247.00

248.81

1.81

0.70

0.03

0.02

0.13

Table 2 - Details of completed diamond drill-holes in the recent drill programme at the Saints Nickel Project

HOLE ID

EASTING

NORTHING

ELEVATION

AZIMUTH

DIP

FINAL

DEPTH

(m)

(m)

(m)

(m)

SNDD016

329,818.3

6,672,490.6

365

090

-70

220

SNDD017

329,816.0

6,672,444.1

366

090

-70

240

SNDD018

329,682.7

6,672,440.4

365

090

-72

378

SNDD019

329,851.4

6,672,453.3

362

090

-75

240

SNDD020

329,303.2

6,673,250.9

366

090

-65

200

SNDD021

329,324.0

6,673,289.8

366

090

-60

240

SNDD022

329,334.4

6,673,242.7

363

090

-65

295

SNDD023

329,758.2

6,672,403.3

364

090

-72

285

SNDD025

329,879.4

6,672,312.3

366

088

-70

248

SNDD026

329,877.5

6,672,312.3

364

092

-70

321.9

JORC Code, 2012 Edition, Table 1

Section 1: Sampling Techniques and Data

CRITERIA

EXPLANATION

COMMENTARY

Sampling

Nature and quality of sampling (eg cut

Drilling

channels, random chips, or specific

Auroch Minerals Limited:

techniques

specialised industry standard

Nickel mineralisation at Saints has been

measurement tools appropriate to the

sampled from the following drilling

minerals under investigation, such as down

techniques:

hole gamma sondes, or handheld XRF

Diamond Core - half core samples with a

instruments, etc). These examples should

maximum of 1.2m and minimum 0.2m

not be taken as limiting the broad meaning

length.

of sampling.

RC drilling - 1m samples of pulverised

Include reference to measures taken to

chips, approximately 3kg's is collected in

ensure sample representivity and the

individual calico bags

appropriate calibration of any

Air Core drilling creates single metre

measurement tools or systems used.

sample of drill chips; however samples are

Aspects of the determination of

composited every 3 metres, with the end

mineralisation that are Material to the

of hole sample consisting of a 1m sample.

Public Report. In cases where 'industry

standard' work has been done this would

be relatively simple (eg 'reverse circulation

DHEM Parameters:

drilling was used to obtain 1m samples

Contractor:

SGC Niche Acquisition

from which 3kg was pulverised to produce

Configuration:

Down-hole EM (DHEM)

Auroch Minerals Ltd ABN 91 148 966 545

FOLLOW US

Suite 10, 38 Colin St, West Perth WA 6005 Phone: +61 8 6383 7817 Fax: +61 8 6245 9853

Email: info@aurochminerals.com www.aurochminerals.com

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Auroch Minerals Ltd. published this content on 06 July 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 06 July 2022 23:13:07 UTC.