Eurotin Inc. announced that it has commenced a deep drilling program, targeting mineralized structures from near surface to 400 metres in depth, at its Oropesa tin project located in southern Spain. The first two holes are located 250 metres apart on Section Lines 12 and 17 and should be completed during the first half of May. Full assay results are expected approximately 2-3 weeks later.

Upon completion of these holes and analysis of the results, the Company will then determine the extent and detail of the next phase of this drilling program.