Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement.
中 國 中 鐵 股 份 有 限 公 司
CHINA RAILWAY GROUP LIMITED
(A joint stock limited company incorporated in the People's Republic of China with limited liability)
(Stock Code: 390)
This overseas regulatory announcement is made pursuant to Rule 13.10B of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited.
Please refer to the attached "Announcement of China Railway Group Limited on Winning of Bids for Material Projects" published by China Railway Group Limited on the Shanghai Stock Exchange website on 23 July 2020 for your information.
By Order of the Board
China Railway Group Limited
Zhang Zongyan
Chairman
23 July 2020
As at the date of this announcement, the executive directors of the Company are ZHANG Zongyan (Chairman), CHEN Yun, WANG Shiqi and ZHANG Xian; the independent non-executive directors are GUO Peizhang, WEN Baoman, ZHENG Qingzhi and CHUNG Shui Ming Timpson; and the non-executive director is MA Zonglin.
A Shares Stock Code: 601390 | A Shares Stock Name: China Railway | Announcement No.: |
H Shares Stock Code: 00390 | H Shares Stock Name: China Railway | Lin 2020-051 |
Announcement of China Railway Group Limited on
Winning of Bids for Material Projects
The board of directors of China Railway Group Limited (the "Company") and all the directors hereby undertake that this announcement does not have any false or misleading statements or any material omissions, and assume the joint and several liabilities for the truthfulness, accuracy and completeness of the contents.
Recently, the Company has won the bids for the following material projects:
Unit: RMB10,000 Currency: RMB
Serial | Company Winning | Bid Amount | Contractual | ||||||||
Bidding Projects | of the | Project | |||||||||
No. | the Bid | ||||||||||
Company | Duration | ||||||||||
Railway Project | |||||||||||
China Railway No.1 | Section MLSG-5 of the EPC contract of civil | ||||||||||
engineering and relating construction project | |||||||||||
1 | Engineering Group | 219,622 | 48 months | ||||||||
of the new | Meizhou | - | Longchuan Railway | ||||||||
Co., Ltd. | |||||||||||
Station | |||||||||||
Highway Projects | |||||||||||
China Railway No.7 | Construction | project | of | Changchun | - | 820 calendar | |||||
2 | Engineering Group | 118,651 | |||||||||
Shuangyang Highway | days | ||||||||||
Co., Ltd. | |||||||||||
China Railway | Roadbed, bridges and | culverts | construction | ||||||||
project of the connection line in Shenzhen side | |||||||||||
Major Bridge | |||||||||||
and the interchange overpass | of | Shenzhen | |||||||||
Engineering Group | |||||||||||
3 | World Exhibition & | Convention | Center | of | 113,927 | 38 months | |||||
Co., Ltd. and China | |||||||||||
Shenzhen-Zhongshan Bridge of Chang'an - | |||||||||||
Railway Tunnel | |||||||||||
Shenzhen Nanshan Expressway in Dongguan | |||||||||||
Group Co., ltd | |||||||||||
(Contract Section 3) | |||||||||||
China Railway | Section 5 of the main line construction project | ||||||||||
4 | Shanghai | of the new | construction | of | S3 | Highway | 99,666 | 730 calendar | |||
Engineering Group | (Lianggang Avenue Interchange of Zhoudeng | days | |||||||||
Co., Ltd. | Highway - G1503 Highway) | ||||||||||
China Railway | |||||||||||
Eryuan Engineering | |||||||||||
5 | Group Co. Ltd. and | Construction | project | (EPC) | (Section 4) of | 82,389 | 36 months | ||||
China Railway No.1 | G331 Qinghe - Fuyun - Altay Highway | ||||||||||
Engineering Group | |||||||||||
Co., Ltd. | |||||||||||
China Railway No.3 | Reconstruction and expansion project (Phase | ||||||||
6 | Engineering Group | II) of G354 Jiangkou Kaide - Lianglukou | 68,857 | 30 months | |||||
Co., Ltd. | Highway- not divided into sections | ||||||||
China Railway No.1 | Section 1 of the relocation project of Reshui - | ||||||||
7 | Engineering Group | Puqian Segment in Heyuan City of G205 | 64,401 | - | |||||
Co., Ltd. | National Highway | ||||||||
China Railway | Section SG01 of | the second batch of | civil | ||||||
Major Bridge | |||||||||
8 | engineering project of Phase I of Conghua - | 63,257 | 26 months | ||||||
Engineering Group | |||||||||
Huangpu Highway in Guangzhou City | |||||||||
Co., Ltd. | |||||||||
China Railway No.3 | Section LJ2-1 of the roadbed civil engineering | ||||||||
project of | the | reconstruction | project | of | |||||
9 | Engineering Group | 50,942 | 30 months | ||||||
Shuanghe - | the | county | town of | Jiuzhaigou | |||||
Co., Ltd. | |||||||||
County Segment of 544 National Highway | |||||||||
Municipal and Other Projects | |||||||||
China Railway | |||||||||
Guangzhou | |||||||||
Engineering Group | |||||||||
Co., Ltd., China | Section 6-8 of the EPC contract of | the | |||||||
10 | Railway No.1 | integrated | construction | project | of | the | 443,562 | - | |
Engineering Group | comprehensive transport hub of Guangzhou | ||||||||
Co., Ltd. and China | Baiyun (Tangxi) Station | ||||||||
Railway No.3 | |||||||||
Engineering Group | |||||||||
Co., Ltd. | |||||||||
China Railway | Development and operation project of | the | |||||||
Shanghai | |||||||||
Zuozhuang | and | Xiangzhuang | area | of | 1,800 | ||||
11 | Engineering Group | 262,253 | |||||||
Shenxian County | High-Speed Railway New | calendar days | |||||||
Co., Ltd. and other | |||||||||
Town | |||||||||
parties | |||||||||
China Railway No.3 | BOT franchise project (construction) of the civil | ||||||||
12 | Engineering Group | engineering | and relating | construction of | the | 174,180 | 1.5 years | ||
Co., Ltd. and other | ancillary bus project at Zhongkai Station of | ||||||||
parties | Ganzhou - Shenzhen High-speed Railway | ||||||||
China Railway | |||||||||
Shanghai | EPCO project of the comprehensive water | ||||||||
13 | Engineering Group | environment treatment project (Phase II) in | 149,230 | 36 months | |||||
Co., Ltd. and other | Pengjiang District of Jiangmen City | ||||||||
parties | |||||||||
China Railway No.3 | Civil engineering project of Huanggang Depot | ||||||||
14 | Engineering Group | of Phase I project of rail transit B1 line in | 141,927 | 42 months | |||||
Co., Ltd. | Binhai New Area of Tianjin City | ||||||||
15 | China Railway No.1 | EPC contract for | the civil engineering | and | 136,905 | - |
Engineering Group | relating construction of Guangzhou Baiyun | ||||||||
Co., Ltd. | Station (inclusive) - Guangzhoubei Station | ||||||||
(exclusive) of Guangzhou - Qingyuan intercity | |||||||||
rail transit project | |||||||||
China Railway | Rongjiang | No. 3 Road | Expressway | project | |||||
Major Bridge | 944 calendar | ||||||||
16 | (including | underground | utility | tunnel) | in | the | 121,770 | ||
Engineering Group | days | ||||||||
downtown of Ganzhou City | |||||||||
Co., Ltd. | |||||||||
China Railway No.8 | Road construction project of Taijin line (Phase | 730 calendar | |||||||
17 | Engineering Group | 106,548 | |||||||
I of Nanming Segment) of Guiyang City | days | ||||||||
Co., Ltd. | |||||||||
China Railway | |||||||||
18 | Guangzhou | EPC contract for Gaohu Road (Xinguangcong | 68,383 | - | |||||
Engineering Group | Road - Taiping Avenue) of Guangzhou City | ||||||||
Co., Ltd., | |||||||||
China Railway No.8 | Twenty post-disaster reconstruction projects in | ||||||||
19 | Engineering Group | Gongxian County of Yibin City, Sichuan | 66,550 | - | |||||
Co., Ltd. | Province | ||||||||
China Railway No.5 | EPC contract for Section I of the construction | 215 calendar | |||||||
20 | Engineering Group | project of | Jiangxi Yicheng | Science | and | 61,741 | |||
days | |||||||||
Co., Ltd. | Electronic Information Industrial Park (Phase I) | ||||||||
China Railway | Phase II construction project of Sanya Phoenix | ||||||||
21 | Beijing Engineering | 51,870 | - | ||||||
seafood square and commercial complex | |||||||||
Group Co., Ltd. | |||||||||
The above bids amounted to approximately RMB 26,666.31 million in aggregate, representing approximately 3.14% of the 2019 operating revenue of the Company prepared under the China Accounting Standards.
Notice is hereby given.
The Board of Directors of China Railway Group Limited