Exploring for Gold and Copper in the Southeast USA
Corporate Presentation - Q2 2024
Cover Photo: Reclaimed Brewer Open Pit/Heap Leach Mine Site, South Carolina, USA
Disclaimer
This Presentation is not an offer to buy or sell the securities referenced herein, nor has the Securities and Exchange Commission or any state, provincial or territorial regulatory authority determined if this Presentation is truthful or complete. Any representation to the contrary is a criminal offense.
The securities described herein have not been and will not be registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act"), or the applicable securities laws of any state of the United States and may be offered and sold in the United States only in reliance upon an exemption from the registration requirements of the U.S. Securities Act and in accordance with any applicable securities laws of any state of the United States.
Each prospective investor must rely on his or her own examination of Carolina Rush ("RUSH") and the terms of the offering, including the merits and risks involved in making an investment decision with respect to the securities. The Company makes no representation or warranty, express or implied, and assume no responsibility for the accuracy, reliability or completeness of the information contained in this Presentation.
Forward - Looking Statements
This Presentation includes "forward looking statements", within the meaning of applicable securities legislation, which are based on the opinions and estimates of management and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected in the forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "budget", "plan", "continue", "estimate", "expect", "forecast", "may", "will", "project", "predict", "potential", "targeting", "intend", "could", "might", "should", "believe" and similar words suggesting future outcomes or statements regarding an outlook. Such risks and uncertainties include, but are not limited to, risks associated with the mining industry (including operational risks in exploration development and production; delays or changes in plans with respect to exploration or development projects or capital expenditures; the uncertainties involved in the discovery and delineation of mineral deposits, resources or reserves; the uncertainty of resource and reserve estimates and the ability to economically exploit resources and reserves; the uncertainty of estimates and projections in relation to production, costs and expenses; the uncertainty surrounding the ability of RUSH to obtain all permits, consents or authorizations required for its operations and activities; and health and safety and environmental risks), the risk of commodity price and foreign exchange rate fluctuations, the ability of RUSH to fund the capital and operating expenses necessary to achieve the business objectives of RUSH, the uncertainty associated with commercial negotiations and negotiating with foreign governments and risks associated with international business activities, as well as those risks described in public disclosure documents filed by RUSH. Due to the risks, uncertainties and assumptions inherent in forward-looking statements, prospective investors in securities of RUSH should not place undue reliance on these forward-looking statements.
Readers are cautioned that the foregoing lists of risks, uncertainties and other factors are not exhaustive. The forward-looking statements contained in this Presentation are made as of the date hereof and the RUSH undertakes no obligation to update publicly or revise any forward-looking statements contained in this Presentation or in any other documents filed with Canadian securities regulatory authorities, whether as a result of new information, future events or otherwise, except in accordance with applicable securities laws. The forward-looking statements contained in this Presentation are expressly qualified by this cautionary statement.
Historical Results
This Presentation contains past mineral exploration results. RUSH has not yet completed the work necessary to verify those past exploration results and the results should not be relied upon. In addition, this Presentation contains information with respect to adjacent mineral properties obtained through public ally available documents. Such information has not been independently verified by RUSH and is not necessarily indicative of the mineralization on RUSH's projects.
The technical and scientific information in this Presentation has been reviewed and approved by Patrick Quigley, MSc, CPG-12116, a Qualified Person as defined by NI 43-101 of the Canadian Securities Administrations.
Q2 - 2024 | TSXV: RUSH | OTCQB: PUCCF | 2 |
PROJECTS
BREWER MINE | SAWYER & NEW SAWYER | EXPANDED REGIONAL PROGRAM | ||
Epithermal & Porphyry Copper-Gold Target | Two historic Gold Mine Acquired | Management Commitment | ||
• Historic open pit gold mine: produced | • | Sawyer Trend gold properties: +20 km | • | 7 additional new targets identified: |
+200,000 oz Au | structural gold trend | pipeline of new projects with immediate | ||
• Epithermal gold resource target: | • | Sawyer Mine: historic gold resource - | Au - Cu discovery potential | |
• pit floor - ready to drill | validate and expand gold resource | • | Regional database: additional target | |
• expanded target from IP survey | development for exploration and | |||
• Big company porphyry copper-gold target: | • | New Sawyer Mine: immediate gold | discovery | |
resource potential | ||||
Venture discussions in progress | • | Strengthened management |
Q2 - 2024 | TSXV: RUSH | OTCQB: PUCCF | 3 |
SOUTHEAST USA: NORTH AMERICA'S FIRST GOLD DISTRICT
Carolina Terrane: 10.35 M oz Gold Endowment
- Porphyry/epithermal and orogenic gold mineralization
- Gold discovered 50 years before California
- 1,493 mines and prospects documented
GEOLOGICAL SETTING OF EASTERN NORTH AMERICA
Carolina Terrane
Reed et al., 2005
Brewer
Haile
Ridgeway
Q2 - 2024 | TSXV: RUSH | OTCQB: PUCCF | 4 |
Carolina RUSH Has 3 Historic Gold Mines *
Sawyer Trend
Brewer
Mine
Golden Triangle (BC)
Same Scale
* USGS Professional Paper 213
CAROLINA TERRANE IS 400 km NE-SW BY 100 km NW-SE = 40,000 km2 and contains Hundreds of Historic Mines
Q2 - 2024 | TSXV: RUSH | OTCQB: PUCCF | 5 |
km/ | ||
17 | miles | |
6 | ||
. | ||
10 | ||
Haile Gold Mine
Haile Gold Mine
Brewer Mine, Next to Haile Mine
Table 1. Brewer Mine Production : 1987 - 1993
Location | Ore Tonnes | Waste Tonnes | Total Tonnes | Grade (g/t) | Au Oz (calc) |
Brewer | 4,487,441 | 4,500,617 | 8,869,699 | 1.20 | 173,150 |
B6 | 556,929 | 1,578,809 | 2,135,738 | 1.27 | 22,717 |
NW Trend | 92,268 | 330,039 | 433,843 | 1.06 | 3,153 |
TOTALS | 5,136,638 | 6,737,146 | 11,873,784 | 1.20 | 199,021 |
*Source: Modified from Zwaschka and Scheetz, 1995
Deposit | Type | Host Rocks | Alteration | Historic*/Current | Au Age |
Resource (Moz Au) | (Ma) | ||||
Haile | Sediment-hosted | Persimmon Fork | Quartz-pyrite-sericite | 4.20 | 549 |
epithermal | metasediments | ||||
Ridgeway | Sediment-hosted | Persimmon Fork | Quartz-pyrite-sericite | 1.44 | 553 |
epithermal | metasediments | ||||
Brewer | High sulfidation | Persimmon Fork | Quartz-pyrite- | See Table 1* | 550 |
epithermal | metavolcanics | aluminosilicate | |||
- Haile Gold Mine (OceanaGold), located 17 km from Brewer Mine; expected 130,000 to 150,000 ounces of gold per year - produced 176,000 ounces in 2022 (www.oceanagold.com)
TSXV: RUSH | OTCQB: PUCCF | 6 |
Phase I Data Driven Exploration
Brewer Near Surface Resource Target
CORE DRILLING
- Inaugural drill program: 17 holes, 5,400m drilled
- Highlights include:
- B21C-005:181.6 m @ 1.24 g/t Au, 0.27% Cu from 56 m depth Including: 10.1 m @ 8.20 g/t Au, 0.24% Cu from 65 m depth
-
B21C-008:106.5 m @ 1.07 g/t Au, 0.26% Cu from 52 m depth
Including: 45.2 m @ 2.03 g/t Au, 0.52% Cu from 104 m depth
RAB DRILLING: 194 holes drilled, max depth 24 m, utility: prospecting, bedrock mapping
SONIC DRILLING
- 6 Sonic holes completed (350 m) through backfilled pit
- 488 large samples collected from pit backfill material
- Utilized as pre-collars for core holes
COMPILATION OF HISTORIC DATA: Historic drillhole database & blasthole model
HIGH RESOLUTION INDUCED POLARIZATION SURVEY COMPLETED: Targets Identified and prioritized for immediate testing
TECHNICAL REPORT IN PROGRESS - NI 43-101
Q2 - 2024 | TSXV: RUSH | OTCQB: PUCCF | 7 |
RECLAIMED PITS: ~12 Mt of backfill material
Reclaimed Backfill Material (vertical section, looking west)
Results of 6-hole Sonic
Drilling Program:
- 488 large samples collected
- Average sample grade: 0.36 g/t Au
- "Waste Rock" accounts for ~44% of backfill material with an average sampled grade of 0.57 g/t Au
- The Company cautions that a Qualified Person has not done sufficient work to classify the Historic Estimate as current mineral resources or mineral reserves under NI 43-101. The Company is not treating the Historical Estimate as current mineral resources or mineral reserves. There can be no certainty, following further evaluation and/or exploration work, that the Historic Estimate can be upgraded or verified as mineral resources or mineral reserves in accordance with NI 43-101. However, the Company plans to conduct further evaluation and/or exploration work with the objective of verifying or upgrading the Historic Estimate as mineral resources or mineral reserves in accordance with NI 43-101.
Q2 - 2024 | TSXV: RUSH | OTCQB: PUCCF | 8 |
Brewer Core Drilling To Date
Summary of Best Intersections in Each Hole
Rank | Drill Hole | From | To | Interval | Au | Cu | Au |
(m) | (m) | (m) | (g/t) | (%) | GxT | ||
1 | B23C-021 | 111.50 | 174.00 | 62.50 | 8.45 | 0.28 | 528 |
2 | B21C-005 | 56.00 | 237.60 | 181.60 | 1.24 | 0.27 | 225 |
3 | B21C-008 | 52.00 | 158.50 | 106.50 | 1.07 | 0.26 | 114 |
4 | B20C-004 | 66.41 | 182.00 | 115.59 | 0.91 | 0.17 | 105 |
5 | B23C-018 | 166.50 | 241.00 | 74.50 | 1.10 | 0.12 | 82 |
6 | B21C-015 | 44.60 | 107.00 | 62.40 | 1.03 | 0.15 | 64 |
7 | B21C-011 | 72.49 | 207.48 | 134.99 | 0.41 | <0.10 | 55 |
8 | B24C-022 | 49.00 | 106.50 | 56.00 | 0.70 | 0.11 | 39 |
9 | B23C-020 | 163.50 | 229.45 | 65.95 | 0.50 | <0.10 | 33 |
10 | B21C-014 | 56.90 | 162.00 | 105.10 | 0.31 | <0.10 | 33 |
11 | B21C-010 | 81.95 | 93.85 | 11.90 | 2.22 | 0.07 | 26 |
12 | B23C-019 | 336.18 | 379.50 | 43.32 | 0.41 | <0.10 | 18 |
13 | B21C-013 | 51.15 | 93.50 | 42.35 | 0.42 | <0.10 | 18 |
14 | B21C-009 | 154.55 | 170.50 | 15.95 | 1.09 | 0.22 | 17 |
15 | B21C-012 | 208.29 | 256.00 | 47.71 | 0.35 | <0.10 | 17 |
Notes: *Reported intervals are drilled widths and do not represent true thicknesses. Holes ranked in terms of best GxT value (GxT = Au grade x thickness). Table shows reported intersections with a GxT value > 10 with new results highlighted in yellow.
Q2 - 2024 | TSXV: RUSH | OTCQB: PUCCF |
Brewer I & II Drill Programs
Best Copper Results
RUSH Core Drilling
BHID | From (m) | To (m) | Interval (m) | Au* (g/t) | Cu* (%) |
B20C-004 | 161.4 | 169.0 | 7.6 | 2.96 | 0.97 |
B21C-005 | 71.9 | 87.5 | 15.6 | 1.43 | 0.54 |
and | 190.9 | 210.2 | 19.3 | 0.86 | 0.65 |
and | 221.0 | 226.0 | 5.0 | 0.45 | 0.51 |
B21C-008 | 105.5 | 149.2 | 43.7 | 2.05 | 0.54 |
B21C-015 | 81.5 | 88.5 | 7.0 | 2.88 | 0.74 |
B23C-018 | 203.09 | 215.3 | 12.2 | 1.80 | 0.74 |
B23C-021 | 132.70 | 149.00 | 16.30 | 2.83 | 1.00 |
- Intervals reported are those that contain a minimum weighted average of 0.5% Cu over a minimum 5-meter length
Q2 - 2024 | TSXV: RUSH | OTCQB: PUCCF |
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Carolina Rush Corporation published this content on 27 May 2024 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 24 June 2024 19:07:00 UTC.