Canadian Copper Inc. announce positive exploration results from its first seven (7) drill holes at its Chester Copper Project ("Chester") located in the Bathurst Mining Camp, New Brunswick, Canada. Phase (1) Highlights: Hole C21-05: 10 meters of 1.4% copper and 1.8% zinc from 12.5 meters, confirming near-surface massive sulphides. HoleC21-06: 23.5 meters of 0.79% copper and 0.9% zinc from 5.5 meters, confirming near-surface massive sulphides.

HoleC21-07: 0.75 meters of 3.55% copper, 0.95 meters of 1.4% copper, 0.65 meters of 1.05% copper, 1.00 meters of 0.87% copper, 1.00 meters of 0.72% copper from 386 meters, confirming several copper vein systems extensions to the Stringer Zone at depth and the deepest known mineralization at the project to date. The objectives of Phase 1 drilling were to: Test mineralized extensions at depth along strike of the Copper Stringer Zone. Test four (4) regional anomalies outside of the known deposit identified by previous prospecting activities.

Exploration methods included geological mapping, trenching, and certain geophysics and geochemical anomalies. Confirm the near-surface massive sulphide ("MS") gossanous Central and East Zone continuity. Previous trenching samples returned surface values of +1.0 gpt Au from this zone.

Each of the above stated objectives were met by these seven drill holes. The Copper Stringer Zone represents a wide mineralized copper system and extends laterally, at depth, and warrants additional exploration. Two (2) of four (4) regional drilling targets returned anomalous values for copper, silver, and zinc that warrant further exploration work.

The MS targeted area supported grade and zone continuity and confirmed the presence of other metals primarily gold (C21-06: 0.39 g/t Au over 4.0m) and silver in the near-surface gossan zone. The Company will release results from the Phase 2 Program once all assay results are received and interpreted. Phase 2 objectives are targeting historical resource validation requirements, exploring gaps within known resource zones, and testing for presence of gold and silver mineralization within mineralized areas.

During 2021, the Company and its predecessor operator Puma Exploration Inc. ("Puma") completed 33 holes for a total of 3,324 meters at the Chester Property. The exploration activities occurred in two phases. Phase one (1) drilling was performed by Puma during February and March 2021 and consisted of seven (7) holes totaling 1,785 meters.

Phase two (2) drilling was performed by the Company during November and December 2021 and consisted of 26 holes totaling 2,139 meters.