Suite 9, 5 Centro Ave, Subiaco WA 6008 P.O. Box 457, West Perth, WA 6872, Australia Ph+61 8 9286 3045 Fax: +61 8 9226 2027 info@birimiangold.com ABN 11 113 931 105

17 January 2014
The Company Announcements Office
Australian Securities Exchange Limited

via electronic lodgement

ADDENDUM TO ANNOUNCEMENT

Birimian Gold Limited (ASX:BGS; "Birimian", "Company") advises that it is including a table to support its announcement dated 14 January 2014 because it inadvertently omitted information required under Listing Rule 5.7.2.
Table 1 attached summarises the reported drill holes at the Massigui Project, Mali. Yours sincerely
Beverley Nichols
Company Secretary
www.birimiangold.com

Table 1. Summary of reported drill holes at the Massigui Project, Mali.

Hole_ID

North

(WGS84_29N)

East

(WGS84_29N)

Dip

Azm

Hole Depth

From

To

Width

Au g/t

NTAG1287 - 1693

Refer to Figures

2 to 4 for graphical

pres entation of auger collars .

Refer to Figures

2 to 4 for graphical

pres entation of auger collars .

All holes

are drilled vertically. Dip = -90

All holes

are drilled vertically

Average hole depth was 8.5m .

Minim um hole depth was 3m . Maxim um hole depth was 15m

See notes

See notes

See notes

See notes

Note s .

Auger drilling is a reconnais s ance exploration technique. Typically the las t m eter of each auger hole repres ents in s itu m aterial. As s uch, res ults are pres ented

as end of hole point s am ples for each auger hole as per the attached plans . Drill hole inters ections are not reported in this announcem ent.

distributed by