The best results were obtained from Drill holes DL-21-01, DL-21-03 and DL-21-05. The chalcocite observed at 61.2 m depth in Drill hole DL-21-01 gave very high copper values as expected averaging nearly 4% copper over 1.8 meters. The zones in drill holes DL-21-03 and Dl-21-05 are described as zones of silicification with quartz veins and rare breccia.
Mr.
About
Bid Red is focused on discovering metals required for the clean energy revolution. Big Red holds an option to acquire a 100% interest in the
Contact:
Tel: 778-218-9638
The information in this news release includes certain information and statements about management's view of future events, expectations, plans and prospects that constitute forward looking statements. These statements are based upon assumptions that are subject to significant risks and uncertainties. Because of these risks and uncertainties and as a result of a variety of factors, the actual results, expectations, achievements or performance may differ materially from those anticipated and indicated by these forward looking statements. Although Big Red believes that the expectations reflected in forward looking statements are reasonable, it can give no assurances that the expectations of any forward looking statements will prove to be correct.
(C) 2022 Electronic News Publishing, source