Beijing Urban Construction Design & Development Group Co., Limited announced that for the three months ended 30 September 2022, the Company won the bids for major projects (including consortium) with a total amount of RMB 3,014 million (unaudited), among which the winning bid price of major projects in the survey, design and consultancy segment amounted to RMB 2,046 million in total (unaudited), and the winning bid price of major projects in the construction general contracting segment amounted to RMB 968 million in total (unaudited). Project name: The Fifth Tender Section of Engineering Monitoring Services for Phase II Infrastructure Project of Innovation Industrial Park in National Regional Innovation Center in Changchun with Winning bid amount of RMB 1,084.566; Survey Contract for the Construction Work of the First Tender Section of the Survey Project for Changsha Rail Transit Line 4 Northward Extension Project with Winning bid amount of RMB 1,809.77; Tender Section I of Third-party Monitoring and Risk Consulting for Ningbo Rail Transit Line 6 Phase I and Line 1 Westward Extension Projects with Winning bid amount of RMB 1,015.572; General Contracting for Survey and Design of 4 Urban Area (Suburb) Railways from Chongqing Central City to Yongchuan with Winning bid amount of RMB 159,042.7; Survey and Design of Xiong'an International Trade Center (D03-04-36 and D03-04-39 Land Parcels) Project with Winning bid amount of 3,223.1694; General Contracting for the Feasibility Study and Design of Rail Transit Reserved Engineering of Phase II Reconstruction and Expansion Project of Jinan Yaoqiang International Airport with Winning bid amount of RMB 6,117.7604; General Contracting for Design of Shijiazhuang Urban Rail Transit Line 4 Phase I Project with Winning bid amount of RMB 32,322.9; and General Contracting (Construction Design and EPC) for Beijing Metro Line 6 Phase II Project (Southward Extension Section) with Winning bid amount of RMB 96,826.3414. Winning bid amounts are mentioned in (RMB 0 '000).