QUARTERLY REPORT TO 31 DECEMBER 2012

HIGHLIGHTS

? Rock chip and soil geochemistry survey completed at the Gascoyne

Project; and

? Flora survey completed at the Medcalf Project and Programme of Works submission lodged with the Department of Mines and Petroleum.


Audalia Resources Limited (ASX: ACP) is pleased to present its report for the December 2012 quarter.

GASCOYNE PROJECT

The Gascoyne Project comprises 100% owned tenements covering 311 km2 that are highly prospective for Lead (Pb), Zinc (Zn) and Copper (Cu) deposits, located in the Gascoyne
Region, Western Australia. It is located
approximately 250 km to the east of Carnarvon and 1200km north from Perth.
The Gascoyne Project covers an area of mid- Proterozoic aged, metamorphosed sediments and volcanic rocks which have been subjected to several phases of tectonic deformation and intruded by granitoids. Exploration work and drilling to date has used the geological model of base metal mineralisation being associated with coincident soil geochemistry and "thumbprint" magnetic anomalies. Historical RC drill testing from one of these targets has returned significant intercepts of 2.3% Pb and
0.9% Cu. Lead sulphide (galena) and copper sulphides (chalcopyrite) were identified in the drill chips.
Audalia's is targeting a Broken Hill Sedimentary Exhalative (SEDEX) massive sulphide Pb, Zn and Cu deposit.

Figure 1 Gascoyne Project - Location Map

Rock chip geochemistry programme

A rock chip sampling programme was undertaken on the Gascoyne Project during the December
2012 quarter. A total of 17 rock chip samples were collected and analysed for silver, barium, copper, manganese, molybdenum, lead and zinc. Anomalous values of 240ppm copper, 310ppm lead and
451ppm zinc (from different samples) have been returned from undifferentiated ironstones.

Soil geochemistry programme

A total of 257 soil geochemistry samples were collected from the western part of the Gascoyne Project during the December 2012 quarter. Anomalous values of up to 163ppb lead and 141 Zinc were returned.
Rock chip and soil geochemistry assay data is being assessed to determine if follow-up work is warranted.

MEDCALF PROJECT

The Medcalf Project is a vanadium-titanium project located some 470 kilometres south east of Perth near Lake Johnson, Western Australia. The Medcalf Project comprises five granted Exploration Licences E63/1068, E63/1133, E63/1134, E63/1405 and E63/1406 and Prospecting licences P63/1528-33 inclusive and P63/1560 and P63/1561 covering a total area of 34 km2.
The Medcalf Project lies in the southern end of the Archaean Lake Johnston greenstone belt. This greenstone belt is a narrow, north-northwest trending belt approximately 110 km in length. It is located near the south margin of the Yilgarn Craton, midway between the southern ends of the Norseman- Wiluna and the Forrestania-Southern Cross greenstone belts.

Flora survey

Audalia completed a flora survey over tenements E63/1405 and E63/1068 in order to drill a vanadium-titanium resource programme over the area.
A Programme of Works (POW) has been submitted to the Department of Mines and Petroleum (DMP) together with the Flora and Archaeological Heritage survey reports for approval of the proposed resource drill programme.

Figure 2 Medcalf Project - Location Map

2

NEW PROJECTS/ ACQUISITIONS

Audalia continues to actively review and assess other projects in the resource sector, both in Australia and overseas, by way of acquisition or investment/ joint venture.

Authorised by: Dato Soo Kok Lim

Executive Chairman

Competent Person's Statement

The information in this report that relates to Exploration Results is based on information compiled by Mr Brent Butler, who is a member of the Australasian Institute of Mining and Metallurgy. Mr Butler is a consultant geologist with 27 years' experience as a geologist. Mr Butler has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the 'Australasian Code for Reporting of Exploration results, Mineral Resources and Ore Reserves' (JORC Code). Mr Butler consents to the inclusion in the report of the

matters based on his information in the form and context in which it appears.

3

Appendix 5B Mining exploration entity quarterly report

Appendix 5B Mining exploration entity quarterly report

Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10

Rule 5.3

Name of entity

AUDALIA RESOURCES LIMITED


ABN Quarter ended ("current quarter")

49 146 035 690 31 December 2012

Consolidated statement of cash flows

Cash flows related to operating activities

1.1 Receipts from product sales and related debtors

1.2 Payments for (a) exploration & evaluation

(b) development

(c) production

(d) administration

1.3 Dividends received

1.4 Interest and other items of a similar nature

received

1.5 Interest and other costs of finance paid

1.6 Income taxes paid

1.7 Other (provide details if material)

Net Operating Cash Flows

+ See chapter 19 for defined terms.

17/12/2010 Appendix 5B Page 1

Appendix 5B

Mining exploration entity quarterly report

1.13 Total operating and investing cash flows

(brought forward)

(212)

(484)

Cash flows related to financing activities

1.14 Proceeds from issues of shares, options, etc.

(net of issue costs)

1.15 Proceeds from sale of forfeited shares

1.16 Proceeds from borrowings

1.17 Repayment of borrowings

1.18 Dividends paid

1.19 Other (provide details if material)

Net financing cash flows

-

-

-

-

-

-

-

-

-

-

-

-

Cash flows related to financing activities

1.14 Proceeds from issues of shares, options, etc.

(net of issue costs)

1.15 Proceeds from sale of forfeited shares

1.16 Proceeds from borrowings

1.17 Repayment of borrowings

1.18 Dividends paid

1.19 Other (provide details if material)

Net financing cash flows

-

-

Net increase (decrease) in cash held

1.20 Cash at beginning of quarter/year to date

1.21 Exchange rate adjustments to item 1.20

1.22 Cash at end of quarter

(212)

1,373

-

(484)

1,645

-

Net increase (decrease) in cash held

1.20 Cash at beginning of quarter/year to date

1.21 Exchange rate adjustments to item 1.20

1.22 Cash at end of quarter

1,161

1,161

Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities

Current quarter

$A'000

1.23 Aggregate amount of payments to the parties included in item 1.2 (33)

1.24 Aggregate amount of loans to the parties included in item 1.10 -

1.25 Explanation necessary for an understanding of the transactions

Executive directors' remuneration (11) Non-executive directors' remuneration (10) Services provided by director-related entities (12)

Non-cash financing and investing activities

2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows

Nil

2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest

N/A

+ See chapter 19 for defined terms.

Appendix 5B Page 2 17/12/2010

Appendix 5B Mining exploration entity quarterly report

Financing facilities available

Add notes as necessary for an understanding of the position.

3.1 Loan facilities

3.2 Credit standby arrangements

Estimated cash outflows for next quarter

4.1 Exploration and evaluation

4.2 Development

4.3 Production

4.4 Administration

Reconciliation of cash

Reconciliation of cash at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts is as follows.

Changes in interests in mining tenements

6.1 Interests in mining tenements relinquished, reduced or lapsed

6.2 Interests in mining tenements acquired or increased

+ See chapter 19 for defined terms.

17/12/2010 Appendix 5B Page 3

Appendix 5B

Mining exploration entity quarterly report

Issued and quoted securities at end of current quarter

Description includes rate of interest and any redemption or conversion rights together with prices and dates.

7.12 Unsecured notes

(totals only)

+ See chapter 19 for defined terms.

Appendix 5B Page 4 17/12/2010

Compliance statement

Appendix 5B Mining exploration entity quarterly report

1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5).

2 This statement does give a true and fair view of the matters disclosed.

Sign here: ............................................................ Date: 31 January 2013 (Executive Chairman)

Print name: Dato Soo Kok Lim

Notes

1 The quarterly report provides a basis for informing the market how the entity's activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.

2 The "Nature of interest" (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.

3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities.

4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of

Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.

5 Accounting Standards ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.

== == == == ==

+ See chapter 19 for defined terms.

17/12/2010 Appendix 5B Page 5