Ariana Resources plc announced the results of its drilling programme, completed during November, at the Kizilcukur Project, which is located approximately 22km to the northeast of its Kiziltepe Mine. Kizilcukur is located outside of the Red Rabbit joint venture with Proccea Construction Co. Highlights includes: 1,598 meters of new Reverse Circulation ("RC") drilling identifies high-grade and near surface zones of mineralisation within the Kizilcukur vein system; all intercepts hit mineralisation within less than 60m from surface; Best infill intercepts include, 8m @ 7.6g/t Gold + 194g/t Silver, 5m @ 3.5g/t Gold + 263g/t Silver and 11m @ 1.3g/t Gold + 73g/t Silver; 76 meters of rock-saw channel sampling also completed, with best results of 2.0m @ 10.5g/t Gold + 455g/t Silver, 2.7m @ 4.4g/t Gold + 229g/t and 2.5m @ 3.1g/t Gold + 177g/t Silver; New drilling data permits refinements to the geological model and will enable a revision of the JORC resource for Kizilcukur in order to assess its potential as a satellite operation to the Kiziltepe Mine.